Job Performance Requirement 10-15

Slides:



Advertisements
Similar presentations
Hose Pulls Shoulder Load ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.
Advertisements

How To Pull A Pre-Connect
Dennis Fire Appliances Operations & use. PTO Step 1 Move slide cover towards the drivers seat to lock out the gearbox Step 2 Select drive on the gear.
VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step.
FIREFIGHTER I LESSON 12A. FIRE HOSE TERMS Expansion-ring gasket Expansion-ring gasket — Gasket used at the end of hose where it is expanded into coupling.
The Cleveland Load.
TFT Blitzfire.
Job Performance Requirement 7-13 Servicing an SCBA Cylinder Using a Cascade System.
Getting Wet Stuff to the Red Stuff For 300 Years
E – gpm Pump / 500 gallon Tank / 1,000’ 5” Hose.
ROSENBAUER REAR-MOUNT SPEED-LAYS
Blackwood Fire Company TL84 LDH Deployment/Restoration Training Module.
State of Georgia BASIC FIRE FIGHTER TRAINING COURSE
Pulling working lines. Step up onto the tailboard. Step up onto the tailboard.
 Start with class room and cover terminology with PowerPoint provided (S 190)  Review the progressive hose lay in Bothell Fires Hose Manual.  Inventory.
Introducing the Mobile Sink with Cabinet Base and Self Contained Water Supply BH, Inc.
The DB In-Line Pumpout Unit Easy-to-use control panel with one switch to run the unit. 15 AMP reset fuse. 115 AC External water pump and tank drain have.
Yoga – Floor Poses The following poses can be used to calm students after a high velocity activity.
Water Supply Skill Drills.
Job Performance Requirement Tying a Figure Eight on a Bight.
Fire Hose, Nozzles, Streams, and Foam
Job Performance Requirement Modified Gasner Bar Pack.
Part C  Accordion load  Lay the first length of hose in the bed on edge against the partition with the coupling at the rear of the bed  At the front.
1 HVACR318 – Refrigeration II Diagrams. 2 Hooking up Gauges on Suction and Discharge Lines.
Job Performance Requirement Removing the Windshield and Roof.
Job Performance Requirement Soft-Sleeve Hydrant Connection.
HOSE ROLLS Straight roll ◦Lay the hose out straight and flat on a clean surface ◦Roll the male coupling over onto the hose to start the roll ◦Form a coil.
How to Iron a Shirt.
Sports Vocabulary
1. We turned off the computer and disconnect the keyboard.
Job Performance Requirement Horseshoe Load.
HOW TO MAKE AN Spring 2012 Origami Balloon By: SondraVojvodich.
2010 Union County Water Movement Training Review Leesburg Twp. September 18, 2010.
ENVIROGUARD WASHOUT SYSTEMS
Place template on top as guide for cutting
Module A Fire Hose And Appliances (4-12)
Horticulture Tools
Job Performance Requirement 7-11
Job Performance Requirement 16-11
Rolled Pillowcase by Elizabeth Evans
Job Performance Requirement 10-16
Job Performance Requirement 15-10
אביבה אלקלעי, ראש היחידה לכניסה להוראה, המכללה האקדמית אחווה
מהו הסטאז'? המכללה האקדמית תלפיות.
Job Performance Requirement 20-2
Job Performance Requirement 10-19
P5523 Oil-to-Gas Separator
Fire Hose, Nozzles, Streams, and Foam
Break down Lance rack Cut one of each of these for each rack
Job Performance Requirement 20-1
Job Performance Requirement 20-3
RTD - Ready-To-Dispense Dilution Control Chemical System using Quick Connect hookup at The College of William & Mary.
Set Up to Begin Evacuation
Job Performance Requirement 15-13
State of Georgia BASIC FIRE FIGHTER TRAINING COURSE
Finishing.
Job Performance Requirement 10-31
One and Two Point Perspective.
Job Performance Requirement 16-13
Job Performance Requirement 10-14
Job Performance Requirement 10-9
Job Performance Requirement 20-5
Job Performance Requirement 16-3
Job Performance Requirement 10-27
Job Performance Requirement 16-13
Job Performance Requirement 15-8
2 POINT PERSPECTIVE.
Job Performance Requirement 10-33
Job Performance Requirement 10-32
Job Performance Requirement 15-14
Presentation transcript:

Job Performance Requirement 10-15 Flat Load

A A water supply flat load starts with the male end of the hose on the right side of the bed at the rear. This will allow this hose load to be connected to another hose load for long hose lays. JPR 10-15A

B The hose is laid flat until the front is reached where the hose is folded over and brought to the rear. When back at the rear, turn the hose off the first layer and lay it flat next to the first row. JPR 10-15B

C When the edge of the hose bed is reached, a second layer is started with a double layer, moving back to the right side of the bed. JPR 10-15C

D An appliance, such as a ball valve, can be placed on the female end on top of the load. JPR 10-15D