Find: hmax [m] L hmax h1 h2 L = 525 [m]

Slides:



Advertisements
Similar presentations
Derivation of the Dupuit Equation - Unconfined Flow
Advertisements

Cross Section of Unconfined and Confined Aquifers
Table of Contents A Quadratic Equation is an equation that can be written in the form Solving Quadratic Equations – Factoring Method Solving quadratic.
A Quadratic Equation is an equation that can be written in the form Solving Quadratic Equations – Factoring Method Solving quadratic equations by the factoring.
Copyright Sautter General Problem Solving Steps (1) Read the problem more than once (three of four times is preferable) (2) Decide what is to be.
By: Adam Linnabery. The quadratic formula is –b+or-√b 2 -4ac 2a an example of how it is used: X 2 -4x-12=0 the coefficient of x 2 is 1 therefore the value.
Principles of Groundwater Flow
Groundwater Systems D Nagesh Kumar, IISc Water Resources Planning and Management: M8L3 Water Resources System Modeling.
Equations Quadratic in form factorable equations
Differential Equations
SECTION 9-3 : SOLVING QUADRATIC EQUATIONS
Find: max L [ft] 470 1,330 1,780 2,220 Pmin=50 [psi] hP=130 [ft] tank
Find: y1 Q=400 [gpm] 44 Sand y2 y1 r1 r2 unconfined Q
Simplify Expressions 34 A number divided by 3 is 7. n ÷ 3 = 7.
Find: The Lightest I Beam
Find: QC [L/s] ,400 Δh=20 [m] Tank pipe A 1 pipe B Tank 2
Find: DOB mg L A B C chloride= Stream A C Q [m3/s]
Find: Q gal min 1,600 1,800 2,000 2,200 Δh pipe entrance fresh water h
Find: Phome [psi] 40 C) 60 B) 50 D) 70 ft s v=5 C=100
Find: u [kPa] at point B D C B A Water Sand Silt Aquifer x
Find: sc 0.7% 1.1% 1.5% 1.9% d b ft3 Q=210 s b=12 [ft] n=0.025
Find: c(x,t) [mg/L] of chloride
Find: R [ft] y [ft] C (5,6) B (2,5) A (0,0) x [ft]
Find: QBE gal min 2, A F B Pipe AB BC CD DE EF FA BE C
Find: the soil classification
Find: f(4[hr]) [cm/hr] saturation 0% 100%
Find: 30 C mg L θd=1.047 Kd,20 C=0.11 [day-1]
Find: ρc [in] from load after 2 years
Find: minimum # of stages
Find: FCD [kN] 25.6 (tension) 25.6 (compression) 26.3 (tension)
Find: Qpeak [cfs] Time Unit Rainfall Infiltration
Find: 4-hr Unit Hydrograph
Find: Average Slope AD [%]
Find: V [ft/s] xL xR b b=5 [ft] xL=3 xR=3 ft3 s
Find: R’ [ft] A V’ V CAB=1,000 [ft] LV’V=20 [ft] I=60 B’ B
Find: min D [in] = P=30,000 people 18+P/1000 PF= 4+P/1000
γdry=110 Find: VTotal[ft3] of borrowed soil Fill VT=10,000 [ft3]
Find: Dc mg L at 20 C [mg/L] Water Body Q [m3/s] T [C] BOD5 DO
Find: Mmax [lb*ft] in AB
Find: max d [ft] Qin d ψ = 0.1 [ft] Δθ = 0.3 time inflow
Find: the soil classification
Find: Qp [cfs] tc Area C [acre] [min] Area Area B A
Find: AreaABC [ft2] C A B C’ 43,560 44,600 44,630 45,000
Find: STAB I1=90 C 2,500 [ft] 2,000 [ft] B D A curve 1 R1=R2 F curve 2
Find: Omax [cfs] Given Data 29,000 33,000 37,000 41,000 inflow outflow
Find: Qp [cfs] shed area tc C 1,050 1,200 1,300 1,450 A B C Q [acre]
Some Quiz Questions Unit: Subsurface Flow.
Find: Bearing Capacity, qult [lb/ft2]
Find: Daily Pumping Cost [$]
Find: Mg S O4 mg (hypothetical) L Ca2+ SO4 Mg2+ Na+ - HCO3 Cl- Ion C
Find: % of sand in soil sieve # mass retained [g] 60% 70% 80% D) 90% 4
Find: αb wave direction breaking αo wave contours αb beach A) 8.9
Find: LBC [ft] A Ax,y= ( [ft], [ft])
Find: Q [L/s] L h1 h1 = 225 [m] h2 h2 = 175 [m] Q
Find: cV [in2/min] Deformation Data C) 0.03 D) 0.04 Time
Find: wc wdish=50.00[g] wdish+wet soil=58.15[g]
Find: Vwater[gal] you need to add
Find: αNAB N STAB=7+82 B STAA= D=3 20’ 00” A O o o
Find: hL [m] rectangular d channel b b=3 [m]
Find: Time [yr] for 90% consolidation to occur
Find: hT Section Section
Find: Saturation, S 11% d=2.8 [in] 17% 23% 83% L=5.5 [in] clay
Find: STAC B C O A IAB R STAA= IAB=60
Find: LL laboratory data: # of turns Wdish [g] Wdish+wet soil [g]
Find: z [ft] z 5 8 C) 10 D) 12 Q pump 3 [ft] water sand L=400 [ft]
Find: AreaABCD [acres]
Find: CC Lab Test Data e C) 0.38 D) 0.50 Load [kPa] 0.919
Find: Pe [in] N P=6 [in] Ia=0.20*S Land use % Area
Equations Quadratic in form factorable equations
Find: M [k*ft] at L/2 A B w 5 w=2 [k/ft] 8 21 L=10 [ft] 33 L
Presentation transcript:

Find: hmax [m] L 17.6 17.8 18.0 18.2 hmax h1 h2 L = 525 [m] w = 0.007 [m/day] hmax h1 h2 Find the maximum water height in meters. [pause] In this problem, L L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] L 17.6 17.8 18.0 18.2 hmax h1 h2 L = 525 [m] w = 0.007 [m/day] hmax h1 h2 two bodies of water, having different water surface elevations, are separated by a known distance. L L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] L 17.6 17.8 18.0 18.2 hmax h1 h2 L = 525 [m] w = 0.007 [m/day] hmax h1 h2 The dividing land mass has a known hydraulic conductivity and experiences a constant recharge. L L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] L Q=-K * i * A hmax h1 h2 flowrate L = 525 [m] w = 0.007 [m/day] flowrate hmax h1 h2 Darcy’s law states that flowrate through a soil is equal to --- L L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] L Q=-K * i * A hmax h1 h2 flowrate hydraulic w = 0.007 [m/day] flowrate hydraulic conductivity hmax h1 h2 the hydraulic conductivity, --- L L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] L Q=-K * i * A hmax h1 h2 gradient flowrate hydraulic w = 0.007 [m/day] flowrate hydraulic conductivity hmax h1 h2 times the gradient, --- L L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] L Q=-K * i * A hmax h1 h2 gradient total area flowrate w = 0.007 [m/day] flowrate hydraulic conductivity hmax h1 h2 times the total area. [pause] From a one-dimensional perspective, --- L L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] L Q=-K * i * A Q hmax w= h1 h2 A gradient total area w = 0.007 [m/day] flowrate hydraulic conductivity Q hmax w= h1 h2 A the average recharge rate, w, is equal to the flowrate, divided by the area. L L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] L Q=-K * i * A w=-K * i Q hmax w= h1 h2 A L = 525 [m] w = 0.007 [m/day] w=-K * i Q hmax w= h1 h2 A This term is then substituted into Darcy’s equation, --- L L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] L Q=-K * i * A w=-K * i w - = i K hmax h1 h2 w = 0.007 [m/day] w=-K * i w - = i K hmax h1 h2 both sides are divided K, the hydraulic conductivity. [pause] After skipping a few steps --- L L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] + L Q=-K * i * A w=-K * i w - = i K w hmax - = h1 h2 K w = 0.007 [m/day] w=-K * i w - = i K w δ2h2 δ2h2 1 hmax - = + h1 * h2 K 2 δx2 δy2 the gradient is rewritten as the sum of the partial gradients in the vertical and horizontal directions. L L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] + L Q=-K * i * A w=-K * i w - = i K w hmax - = h1 h2 K w = 0.007 [m/day] w=-K * i w - = i K w δ2h2 δ2h2 1 hmax - = + h1 * h2 K 2 δx2 δy2 Assuming flow at the soil water interface is purely horizontal, --- L L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] + L Q=-K * i * A w=-K * i w - = i K w hmax - = h1 h2 K w = 0.007 [m/day] w=-K * i w - = i K w δ2h2 δ2h2 1 hmax - = + h1 * h2 K 2 δx2 δy2 the partial differential equation is simplified by excluding the vertical component. L L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] + - L Q=-K * i * A w=-K * i w - = i K w hmax - = h1 h2 w = 0.007 [m/day] w=-K * i w - = i K w δ2h2 δ2h2 1 hmax - = + h1 * h2 K 2 δx2 δy2 The expression is then integrated with respect to x --- 2*w d2(h2) - L = K δx2 L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] + - - L Q=-K * i * A w=-K * i w - = i K w hmax - = h1 w = 0.007 [m/day] w=-K * i w - = i K w δ2h2 δ2h2 1 hmax - = + h1 * h2 K 2 δx2 δy2 and the constants of integration are solved using known boundary conditions. 2*w d2(h2) - L = K δx2 w*x2 - h2= +c1*x + c2 K

Find: hmax [m] + - - L x Q=-K * i * A w=-K * i w - = i K w hmax - = h1 w = 0.007 [m/day] w=-K * i w - = i K w δ2h2 δ2h2 1 hmax - = + h1 * h2 K 2 δx2 δy2 If we set x equal to the horizontal distance from the left bank, in the direction of the right bank, --- 2*w d2(h2) - L = K δx2 x w*x2 - h2= +c1*x + c2 K

Find: hmax [m] + - - L x Q=-K * i * A w=-K * i w - = i K w hmax - = h w = 0.007 [m/day] w=-K * i w - = i K w δ2h2 δ2h2 1 hmax - = + h h1 * h2 K 2 δx2 δy2 and we set h, equal to the vertical distance up to the groundwater table, --- 2*w d2(h2) - L = K δx2 x w*x2 - h2= +c1*x + c2 K

Find: hmax [m] + - - L x Q=-K * i * A w=-K * i w - = i K w hmax - = h w = 0.007 [m/day] w=-K * i w - = i K w δ2h2 δ2h2 1 hmax - = + h h1 * h2 K 2 δx2 δy2 the first boundary condition will be x = 0, h = h1, and the second boundary condition will be --- 2*w d2(h2) - L = K δx2 x w*x2 BC#1: x=0, h=h1 - h2= +c1*x + c2 K

Find: hmax [m] + - - L x w - = i K w hmax - = h h1 h2 K = K w*x2 w = 0.007 [m/day] w - = i K w δ2h2 δ2h2 1 hmax - = + h h1 * h2 K 2 δx2 δy2 x = L, h = h2. Finally, the height of the groundwater table, 2*w d2(h2) - L = K δx2 x w*x2 BC#1: x=0, h=h1 - h2= +c1*x + c2 K BC#2: x=L, h=h2

Find: hmax [m] + - - + L x w - = i K w hmax - = h h1 h2 K = K w*x2 (h1 - h2 ) * x 2 2 *(L-x) * x h = h1- + [m/day] 2 K L w - = i K w δ2h2 δ2h2 1 hmax - = + h h1 * h2 K 2 δx2 δy2 as a function of x equals the square root of the quadratic, shown here. [pause] From the given data, --- 2*w d2(h2) - L = K δx2 x w*x2 BC#1: x=0, h=h1 - h2= +c1*x + c2 K BC#2: x=L, h=h2

Find: hmax [m] + - - + L x w - = i K w hmax - = h h1 h2 K = K w*x2 K w (h1 - h2 ) * x 2 2 *(L-x) * x h = h1- + [m/day] 2 K L w - = i K w δ2h2 δ2h2 1 hmax - = + h h1 * h2 K 2 δx2 δy2 we know h1, h2, the recharge w, the hydraulic conductivity K, and the length L, --- 2*w d2(h2) - L = K δx2 x L = 525 [m] w*x2 m day - h1=17.6 [m] h2= +c1*x + c2 K=14.5 K h2=15.3 [m]

Find: hmax [m] ? ? ? + L x hmax h h1 h2 w (h1 - h2 ) * x 2 2 h = h1- 2 *(L-x) * x h = h1- + [m/day] 2 K L ? ? ? hmax h h1 h2 but the value of x is unknown. [pause] Since the problem asks to find the maximum height of the groundwater table, L x L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] ? ? ? + L x hmax h h1 h2 w (h1 - h2 ) * x 2 2 h = h1- 2 *(L-x) * x h = h1- + [m/day] 2 K L ? ? ? hmax h h1 h2 we need to find the value of x which corresponds to this maximum height. L x L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] ? ? ? + L x hmax h h1 h2 w (h1 - h2 ) * x 2 2 h = h1- 2 *(L-x) * x h = h1- + [m/day] 2 K L ? ? ? dh =0 dx hmax h h1 h2 At the groundwater divide, the slope of the groundwater table is zero, therefore, we can --- L x L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] + L x hmax h h1 h2 w (h1 - h2 ) * x 2 2 h = h1- 2 K L *(L-x) * x h = h1- + [m/day] 2 K L dh =0 dx d hmax h h1 h2 dx differentiate our equation for the height of the groundwater table, with respect to x, --- L x L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] + L x hmax h h1 h2 w (h1 - h2 ) * x 2 2 h = h1- 2 K L *(L-x) * x h = h1- + [m/day] 2 K L dh =0 dx d =0 hmax h h1 h2 dx set that value equal to zero, and solve for x. Doing so will calculate --- L x L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] - + L x hmax h h1 h2 w (h1 - h2 ) * x 2 2 h = h1- 2 K L *(L-x) * x h = h1- + [m/day] 2 K L dh =0 dx d =0 hmax h h1 h2 dx the value of x, corresponding to the maximum groundwater height, h max. L K (h1 - h2 ) 2 2 - L xhmax= * w 2 2*L x L = 525 [m] m day h1=17.6 [m] K=14.5 h2=15.3 [m]

Find: hmax [m] - + L x hmax h h1 h2 w (h1 - h2 ) * x 2 2 h = h1- 2 K L *(L-x) * x h = h1- + [m/day] 2 K L dh =0 dx d =0 hmax h h1 h2 dx The known values of L, K, w, h1 and h2 are plugged in, and we compute the horizontal distance to from the left bank --- L K (h1 - h2 ) 2 2 - L xhmax= * w 2 2*L x L = 525 [m] m h1=17.6 [m] K=14.5 day h2=15.3 [m]

Find: hmax [m] - + L x hmax h h1 h2 w (h1 - h2 ) * x 2 2 h = h1- 2 K L *(L-x) * x h = h1- + [m/day] 2 K L dh =0 dx d =0 hmax h h1 h2 dx to the groundwater divide, to be 113.2 meters. [pause] Now that we know the appropriate value for x, --- L K (h1 - h2 ) 2 2 - L * w 2 2*L x L = 525 [m] m xhmax=113.2 [m] h1=17.6 [m] K=14.5 day h2=15.3 [m]

Find: hmax [m] - + L x hmax h h1 h2 w (h1 - h2 ) * x 2 2 h = h1- 2 K L *(L-x) * x h = h1- + [m/day] 2 K L dh =0 dx d =0 hmax h h1 h2 dx it can be plugged into the equation for the height of the groundwater table, --- L K (h1 - h2 ) 2 2 - L * w 2 2*L x L = 525 [m] m xhmax=113.2 [m] h1=17.6 [m] K=14.5 day h2=15.3 [m]

Find: hmax [m] - + L x hmax h h1 h2 w (h1 - h2 ) * x 2 2 h = h1- 2 K L *(L-x) * x h = h1- + [m/day] 2 K L dh =0 dx d =0 hmax h h1 h2 dx in addition to the other known variables, and the maximum groundwater height --- L K (h1 - h2 ) 2 2 - L * w 2 2*L x L = 525 [m] m xhmax=113.2 [m] h1=17.6 [m] K=14.5 day h2=15.3 [m]

Find: hmax [m] - + L x hmax=17.78 [m] h1 h2 w (h1 - h2 ) * x 2 2 *(L-x) * x h = h1- + [m/day] 2 K L d =0 hmax=17.78 [m] h1 h2 dx equals 17.78 meters. [pause] L K (h1 - h2 ) 2 2 - L * w 2 2*L x L = 525 [m] m xhmax=113.2 [m] h1=17.6 [m] K=14.5 day h2=15.3 [m]

Find: hmax [m] - + L x 17.6 17.8 18.0 hmax=17.78 [m] 18.2 h1 h2 w (h1 - h2 ) * x 2 2 *(L-x) * x h = h1- + [m/day] 2 K L 17.6 17.8 18.0 18.2 d =0 hmax=17.78 [m] h1 h2 dx Looking back at the possible solutions, L K (h1 - h2 ) 2 2 - L * w 2 2*L x L = 525 [m] m xhmax=113.2 [m] h1=17.6 [m] K=14.5 day h2=15.3 [m]

Find: hmax [m] - + AnswerB L x 17.6 17.8 18.0 hmax=17.78 [m] 18.2 h1 (h1 - h2 ) * x 2 2 *(L-x) * x h = h1- + [m/day] 2 K L 17.6 17.8 18.0 18.2 d =0 hmax=17.78 [m] h1 h2 dx AnswerB the answer is B. L K (h1 - h2 ) 2 2 - L * w 2 2*L x L = 525 [m] m xhmax=113.2 [m] h1=17.6 [m] K=14.5 day h2=15.3 [m]

? Index σ’v = Σ γ d γT=100 [lb/ft3] +γclay dclay 1 Find: σ’v at d = 30 feet (1+wc)*γw wc+(1/SG) σ’v = Σ γ d d Sand 10 ft γT=100 [lb/ft3] 100 [lb/ft3] 10 [ft] 20 ft Clay = γsand dsand +γclay dclay A W S V [ft3] W [lb] 40 ft text wc = 37% ? Δh 20 [ft] (5 [cm])2 * π/4