Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TGn Liaison Report] Date Submitted: [20 June 2006] Source: [Marco Naeve, Phil Beecher] Company [Eaton Corporation, Integration Associates] Address [4201 North 27th Street, Milwaukee, WI 53216] Voice:[+1 414-449-7270], FAX: [+1 414-449-6131], E-Mail:[MarcoNaeve@eaton.com, pbeecher@integration.com] Re: [15-06-0273-01-0000-tgn-liaison-report-may06.ppt by John Barr] Abstract: [Liaison report to inform 802.15 WG of actions taken by 802.11n.] Purpose: [Information Exchange] Notice: This document has been prepared to assist the IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by 802.15. July 2004 doc.: IEEE 802.15-04/0395r0 Marco Naeve, Eaton Corp John Barr, Motorola
July 2004 doc.: IEEE 802.15-04/0395r0 Summary P802.11n Draft 1.0 balloted in March for WG Letter Ballot - FAILED: (only 352 voters) YES: 149 (46.5%) NO: 171 ABSTAIN: 32 Largest number of comments EVER! Total 12277 Unique 7585 Editorial 4130 Hard Editorial 26 Technical 3429 1632 Technical (solution provided with consensus) 749 Submission Technical (submission required for solution) 1048 Disputed Technical (no consensus on proposed solution) Marco Naeve, Eaton Corp John Barr, Motorola
Status Started comment resolution at May interim. Held ad-hoc meeting from May 31st to June 1st in Santa Clara to resolve more comments. Held ad-hoc meeting from July 12th to 14th in La Jolla to resolve even more comments. Resolving comments from July 17th to the 21st at the 802 plenary meeting. Finished 100% of editorial comments Finished 43% of technical comments Marco Naeve, Eaton Corp
Plan Ad-hoc meeting between July plenary and September interim: Resolve more comments September interim meeting: Recirculate draft Form sponsor ballot pool Marco Naeve, Eaton Corp