Tuesday 17/5 10: TeV - colliding. Start roman pot alignment ...

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
From yesterday LHC status Wednesday 26 th Welcome Verena back on shift 07:08 Access in PM85 for piquet EPC (O.Fournier).  Fuse on RD2.R8 circuit.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
SPS extraction, transfer lines, injection
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Monday 21st January & night
Monday 14th March Second fill with pilot + 3 nominal bunches
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Saturday 30th June - Sunday: Rocky !
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 13 G. Arduini, B. Holzer
LHC commissioning Week 38
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Wed :40 Lost S78 - QPS controller.
Thursday 10th May - morning
Saturday 2/4/ :00-09:00 Problems with SPS:
Monday February 28th 8h00: Injection
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Thursday :00: Physics fill from the night shift
Wire almost entirely through beam before BLM triggers dump
Tuesday 9th November 10:02 Fill beams dumped
Thu 15/9 – Fri 16/9 09:30 Controls network problem fixed The network problems have been fixed since 9:30am when the network switch for the Service IP57.
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Yesterday morning Held 1647 for a while – SPS kicker problem
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Saturday 7th May Sat – Sun night
Programme for Saturday 10 July
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Monday – Morning Fill 3265 stable beams since 1:31
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
LHC Morning Meeting - G. Arduini
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Thursday – Morning Energy matching at injection with H CODs
Programme for Friday 9 July
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
07/08/2010 Fill #1264 dump at 02:14:38.
MD Planning Fri – Sat (1. – 2.7.)
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 24 September 2011.
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Wednesday 14:30 Fill 2011 dumped.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Tuesday
Monday 5 July Morning: Continued with the Physics fill, 7b x 7b, 1e11/bunch Stable beams from 2:30 am to 13:30 : 11 hours.
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Presentation transcript:

Tuesday 17/5 10:00 3.5 TeV - colliding. Start roman pot alignment ... 10:54 beam dump due to roman pot movement 11:50 sector 81 & 12 tripped during cycle (SPS em noise ?) 13:06 end of pre-cycle, trip of sector 78 13:00 - 18:00 Investigations on the trips of Sector 78 main quadrupoles. 18:30 finally successful pre-cycle after restoring threshold on nQPS (B11). No injection permit from CMS 19:00 Injection of beam 2 only. TI2 Power converter problem on RBIH.610337 19:30-01:00 Injection setting-up up to 144 bunches 01:00-06:30 Fill #1787 – 480 bunches with 72 bunches/train – 4.4x1032 cm-2s-1 initial luminosity – 3.4 pb-1 in 2.3 hours. End of fill test of measurement of transient beam loading when switching off a cavity. 06:30 – now: ALPHA/TOTEM roman pot beam based alignment

ALPHA/TOTEM Roman pot Started at 9 AM 9 pilots + 1 nominal - 8 x1010 p/bunch: Emittance for the “nominal” bunch on the low side (2.5 mm instead of 3.5 mm) Dumped by BLMs at 10:54 by error in the trim value sent for the roman pot position (100 mm step instead of 10 mm step)  problem fixed afterwards Decided to stop and move to injection setting-up

Sector 81/12 trips Un-notified test of one main quadrupole power supply chain in the SPS  transformer effect in this case SPS is the primary and LHC is the secondary at the origin of the oscillation Same as on 30/3/2010 QF QD

Sector 81/12 trips

Sector 78 trip No blow-up along the trains

Sector 78 trips (Z. Charifoulline, K. Dahlerup, J. Steckert) Circuit tripped always at the end of a precycle at around 1400A. This happened only if all the circuits are pre-cycled together. If only RQ is cycled no trips occur. RQ + RB don't trip either but BS-board signal show an slight increase. It was found that the BS board B11L8_3 was set to an increased threshold of 600uV in march 2010. In April 3 2011 this crate was power cycled and the board was probably switched back to its default value of 500uV. For some reason this circuit didn't trip until today. We set the threshold back to 600uV and wrote it to flash. A precyle with all circuits was successfully completed without the BS board triggering. The maximal splice voltage was ~490uV. This could explain why the precycle sometimes work and sometimes not... We're just pretty close to the threshold. Further tests are required to find out which circuits causes the xtalk on the B11L8_8 card.

Injection setting-up (W. Bartmann, C. Bracco) Injection of 36 bunches showed losses-to-dump ratio of 36% for Beam 1 and 11% for Beam 2 Trajectory in TI 2 transfer line was steered in both planes Injection was then extremly clean: losses-to-dump thresholds 1% Emittance in the SPS was about 3 um for 72 bunches We tried to inject with a more relaxed setting of the SPS scraper but losses-to-dump ratio reached 85% for beam 1 Nominal scraping was used (as for 2-2.5um emittance) but this induced high losses and all SPS BLM had to be masked With this setting losses were always smaller than 25% for Beam 2 and 10% for Beam 1 Emittance in the SPS back to ~2um for 108 bunches, trajectories and injection oscillations were very good and injection extremely clean. First injection of 144 bunches worked fine for both beams with losses smaller than 50%, emittance is now 2.6 um Second injection of Beam 1 dumped the beam We tried again and we managed to inject 3 times 144 bunches (85% losses for B1 and ~40% for B2) we are satisfied and we stop here: mission accomplished! New TI 2 settings copied to all the other users

Injection setting-up (W. Bartmann, C. Bracco)

Pending TI2 – TCDI alignment? Needed for 144 bunches Abort Gap Keeper: need another fine adjustment (1 Hour). It might imply limiting the last injection bucket 31171? Loss maps at injection: Vertical and off-momentum for B1 Change acceleration rate for RF frequency trims to minimize transients for high intensity Update of the OFSU (need a test ramp afterwards)  not urgent

Plan Day: Evening: Night: Tomorrow: TOTEM/ALPHA roman pot beam based alignment Evening: Change acceleration rate for RF frequency trims to minimize transients for high intensity Loss maps at 450 GeV Night: Fill for physics with 768 bunches (trains of 72 bunches) Tomorrow: TCDI alignment AGK fine adjustment RE-visit injection of 108-144 bunches and inject up 1200 – 1380 bunches