Chris Warner Network Code Manager

Slides:



Advertisements
Similar presentations
DRAFT Shipperless and Unregistered sites 3 November 2010.
Advertisements

AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
Project Nexus Workgroup Unique Sites 4 th November 2014.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Xoserve sense checks & validation Reasonable Endeavours Claims.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Nexus Workgroup CSEP Transition Topic June
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
1 Modification Proposal 0199: Clarification around the application of the UNC Dispute Resolution Process Alison Chamberlain National Grid Distribution.
Customer Charge On behalf of all DNs 25 October 2010.
Current and New process Current Process New Process Response: Does not want service but live supply -Passed into Orphaned Report Intends to confirm – Remains.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.
© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
UNC Modification Proposal 0192 National Grid Distribution Proposal 0182: “ Introduction of DNO obligations to facilitate resolution of unresolved USRVs”
Connected System Exit Points Options for strategic regime change Chris Warner.
IGT and Shipper Workgroup meeting 28 th February 2011.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transmission Workstream 6 January 2011
Supply Point Capacity BSSOQ and Supply Point ratchets
David Addison / Steve Deery
Wales & West Utilities Entry – Standard Special Condition D12
UNC Modification Proposal 0202 National Grid Distribution
Gas Act Schedule 2B “Gas Code”
Transmission Workstream 4th July 2007
UNC Modification 0663S Extending the data comprised under the definition of Supply Point Premises Data (TPD V5.18.1) and iUNC Modification 114 Extending.
Revised registration for unregistered sites
Must Read Process Guide For Shippers
Modification Proposal 0192 – Draft Business Rules.
Chris Warner Network Code Manager
Confirmation Notice Period for Certain ‘Unique’ Sites
Amendment to NEA & NExA Measurement Provisions Change Process
Reduction of Exit Capacity at DM Supply Points
The Necessary Criteria for a UNC Modification Proposal
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Joint Office Presentation for Modification 0678
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
UNC Modification Proposal 0172 National Grid Distribution
UNC Modification Proposal 0362
Supply Point Capacity BSSOQ and Supply Point ratchets
Industry Shipperless & Unregistered Working Group
DN Interruption & Charging
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
Proposed Transitional Gas Exit Arrangements
Transmission Workstream 2nd December 2010
Options for the Development of a Demand Side Response Mechanism
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Deferral of Retrospective Updates Functionality
Lessons Learnt UKLC - November 2015
Theft: Shipperless Arrangements
Shipperless/Unregistered Sites
DN Interruption Phase II
Implementation Approach Distribution Workgroup – June 2014
Annual Quantity (AQ) 45.
Joint Office UNC Elections
Joint Office UNC Elections
Industry Shipperless & Unregistered Working Group
Joint Office UNC Elections
Presentation transcript:

Chris Warner Network Code Manager UNC Modification Proposal 0369 Re-establishment of Supply Meter Points – measures to address shipperless sites Chris Warner Network Code Manager

Overview of Issue The Network Code ‘Supply Point Withdrawal and Isolation’ provisions were comprehensively reviewed as part of Ofgem’s ‘Review of Gas Metering Arrangements’ (RGMA) programme in 2004. Significant amendments were made within the remit of Network Code Modification 0675 (implemented 2004). No changes have been made to the provisions in UNC TPD Section G3 since then. The purpose of Modification Proposal 0369 is to: Render an increased level of rigour in the relevant UNC provisions to: Lessen the likelihood of ‘shipperless sites’ occurring (Unregistered Supply Points which are flowing gas or capable of flowing gas) Provide a mechanism whereby such sites are registered at the earliest opportunity Reduce the User community’s exposure to the consequences of ‘unidentified gas’

The case for change Re-establishment (UNC TPD 3.7) Re-establishment is the setting of a previously Isolated Supply Meter Point back to a status of ‘live’ If Transporters become aware that gas is capable of being offtaken at an Isolated SMP, the Transporter will: Notify the Registered User The Registered User will Re-establish the SMP Provided the Supply Meter was not disconnected from the Transporter’s system at the point of Isolation, the Registered User will be liable for all relevant charges: In this case given that no Effective Withdrawal has occurred retrospective charges levied will be limited to Transportation Commodity.

The case for change (continued) If an Effective Supply Point Withdrawal has occurred i.e. in addition to the Isolation of the SMP, the Registered User has Withdrawn from Supply Point ownership, provided the Supply Meter was not disconnected from the Transporter’s system at the point of Isolation: If gas has subsequently been offtaken, the previous Registered User is liable for all charges as if the Effective Supply Point Withdrawal has not occurred If gas has not been offtaken but is capable of being offtaken the previous Registered User will be responsible for Capacity and Customer charges as if the Effective Supply Point Withdrawal has not occurred

The case for change (continued) Limitations of Re-establishment terms Applies where: The Supply Meter remains connected to Transporters system. Retrospective charges will continue to be applied until the previous Registered User either undertakes physical works or re-establishes the SMP However: Retrospective charging provisions do not apply where the Supply Meter has been disconnected from the Transporters system

The case for change (continued) In the case of a Supply Point where an Effective Withdrawal has occurred and the previous Registered User has advised that it has disconnected the Supply Meter, circumstances may arise where: The Registered User has not correctly undertaken physical works to ensure that the Supply Meter has been disconnected from the Transporters’ system despite notifying the Transporter that such works have occurred The Supply Meter has been reconnected to the Transporters system but the Supply Point remains ‘shipperless’. Where this occurs there is no recourse to: Seek to levy retrospective charges from the previous Registered User Ensure that the Supply Point is re-registered (does not remain ‘shipperless’) (notwithstanding that TPD G3.7.6 identifies that a “Relevant Registered User” is the Registered User for the period commencing on the date of Isolation and ending on the next Supply Point Registration Date)

Solution components Isolated and Withdrawn Supply Points Where the Supply Meter which was installed at the time of an Effective Withdrawal is found to be offtaking gas or capable of offtaking gas, the Transporter will: Notify the previous Registered User Require that the previous Registered User registers the relevant Supply Point into its ownership If a Supply Point Confirmation is not submitted within one calendar month of such notification the Transporter will register the Supply Point on behalf of the previous Registered User (using the data attributes pertinent to the relevant Supply Point as at the point of Effective Supply Point Withdrawal).

Solution components (continued) Isolated and Withdrawn Supply Points Where the Supply Meter has been notified to the Transporter as disconnected from the Transporters system but that gas is identified as being offtaken through the Supply Meter installed at the point of Effective Withdrawal, the Previous Registered User will be liable for all charges associated with the Supply Point as if it had not been subjected to an Effective Withdrawal. Isolated only Supply Meter Points Where the Supply Meter has been disconnected from the Transporters system and gas identified as being offtaken through the Supply Meter installed at the point of Effective Withdrawal, the Registered User will be liable for all charges associated with the SMP as if it had not been Isolated.

Solution components (continued) Where the Transporter has visited a Supply Point premises for the purposes of undertaking a disconnection of the service pipe in accordance with the Gas Safety (Installation and Use) Regulations 1998 (GSIU) but upon visiting the relevant premises finds that the Supply Meter (installed at the point of Isolation and/or Effective Withdrawal) remains connected to the Transporters network and may or may not be capable of flowing gas, the Transporter will: Levy an appropriate charge to the previous Registered User in accordance with its Siteworks Terms and Procedures (UNC TPD G7)

Deemed Supply Contracts The proposed UNC Legal Text would reflect that in cases where the previous Registered User has procured an Effective Supply Point Withdrawal, but the Supply Meter (installed at the point of Effective Withdrawal) is found to be offtaking gas or capable of offtaking gas, the User Registration will be deemed not have ceased (up to and at the point of the next Supply Point Registration date or next Effective Withdrawal). In these circumstances a Deemed Supply Contract will exist in accordance with the Gas Act Schedule 2B Para 8(2)(a). In accordance with Condition 7 Paragraph 4(c) the Supplier (subject to the relevant licence provisions) may have recourse to recover from the consumer the charges to which it is entitled.

Supporting statistical information The current volume for Shipperless - PTS (February 2011) 1,176 (Same meter on site) AQ Profile 1 – 73,200 = 1,080 73,201 > = 96 Age since withdrawal < 1 year = 93 1-2 yrs = 329 3-4yrs = 244 > 4yrs = 510