Photo explaining what was done wrong

Slides:



Advertisements
Similar presentations
Always start a vehicle correctly
Advertisements

Always use the correct lifting equipment
PDO Second Alert What happened? Your learning from this incident..
Always use mechanical handling aids when carrying out a heavy lift
Always ensure travelling block is stationary during DM changeover
No Removal of cellar frames by hands
Always use mechanical handling aids when carrying out a heavy lift
Always use 3 points of contact when using ladders
Always ensure the right tools are used for the task
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
PDO Second Alert What happened? Ensure you are out of the danger zone
PDO Second Alert Valves open Valve closed Valves open Valve open
Don’t pull a twisted sling
Never place yourself in line of fire
Ensure all safety covers and guards are secured and in place
Maintain 3 point contact when you climb Ladder
PDO Second Alert Date: Incident title: Fall from Height
PDO Second Alert Stay out of the line of fire What happened:
Drive with appropriate speed to road conditions
Use right tools for the job and use them correctly
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Always ensure a stable position when working at height!
Always wear fall protection equipment when working at height
Ensure to use the right tools and equipment for the activity
Follow Management of Change for an activity which is not in permit
Keep away from “Line of Fire”
Always use the right equipment for the task !!!!
Ensure 3 point contact maintained whilst using ladder
No hands on elevator while delivering pipe
PDO Second Alert What happened? Your learning from this incident..
Never put your Hands in line of fire
PDO Second Alert What happened? Your learning from this incident..
Ensure cat line are under tension before removing elevator bolts
PDO Second Alert Date: Incident title: LTI What happened?
Beware of Fall hazards while working at edge of trailer
PDO Second Alert Photo explaining what was done wrong
If in doubt – stop the job
Pay attention to your footing
Unsecured pup joint falling
PDO Incident First Alert – Ensign
Always report Near Misses
Do not stand in the LINE OF FIRE
Always use secondary retention
Never place yourself in “line of fire”
Always use your hands to set the slips
Always assess the risks, Stop and think.
Ensure that all Rig moves are carried out by competent personnel
When operating the Tongs under tension, make sure all crew keep clear
PDO Second Alert Date: Incident title: HiPo What happened?
Your health is your responsibility
Always ensure “no go” zone are in place
Check equipment prior to start the job
PDO Second Alert Photo explaining what was done wrong
Do not move into the Line of Fire
Always be vigilant while moving across well site location
Seek assistance of Banksman while reversing the vehicle
PLAN AND DOCUMENT CHANGES TO THE OPERATION
Always keep your hands and fingers away from the Line of Fire
Always keep your equipment maintained
Always isolate equipment before beginning maintenance tasks
Check Level Setup prior Lifting & Lowering Operation
Keep away from “Line of Fire”
Carillion Alawi LLC, Incident Type LTI No, 16/12/18
Keep away from the line of fire
Confidential - Not to be shared outside of PDO/PDO contractors
Beware of raised edges of walk ways.
Keep hands out of the line of fire
Use hands-off where possible
Presentation transcript:

Photo explaining what was done wrong PDO Second Alert Date: 13.02.16 LTI Rig 60 What happened? An electrician was climbing a ladder secured at the top by electrical tie wraps to the lowered rig floor (rig move / rigging down), when the tie wrap snapped causing him to fall approximately 1.5 m (height from his foot on the ladder to the ground) resulting in a cut to the inside of his right ankle and a fractured heel requiring surgical intervention. Your learning from this incident.. Ladders are to be used when complete (all sections together), properly secured and for short term use only. Use of light weight tower scaffold, stairs or mobile elevating working platforms to be used for longer term jobs. Ladder to be secured by either a person who remains footing the ladder or by correctly lashing the head / top of the ladder. Photo explaining what was done wrong Ensure your ladder is properly secured

Management self audit Date: 13.02.16 LTI Rig 60 As a learning from this incident and to ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do you ensure safe egress/access to the rig floor during rig move operations? Do you ensure your workforce are supplied with the right tools to work at height? Do supervisors ensure the correct procedures are implemented and followed? Do you have hazard hunts during rigging up and rigging down operations? Do allow the use of split parts of extension ladders? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.