Alignment Engineering Group

Slides:



Advertisements
Similar presentations
Cellular Networks.
Advertisements

USC Viterbi School of Engineering. Automated Imbedding of Steel Reinforcement Mesh.
The B.U.G. Rating System Klaus Bollmann
3 rd Harmonic He Vessel Welding Helium Vessel-to-Cavity No June 2008.
Deviations from fiducial locations are unacceptable in areas despite high accuracy at alignment points.
Web Concept The idea I used for my shop was based on the formation of a spider’s web, and the dew drops that form on it in the early morning. I decided.
Characterization of the Engineering Test Reactor at the INL for Final Disposition TRTR 2007 J. R. Parry Irradiation Test Programs INL.
ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June
Physics for Scientists and Engineers II, Summer Semester Lecture 7: June 3 rd 2009 Physics for Scientists and Engineers II.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Strikes & Spares.
Transnational Forum on Best Practices in Communication INFORM, Community network of Regional Policy communication officers 3 rd meeting, Brussels 14-16/06/2009.
Wave Form ”/132 cm Titanium fan finish Titanium ABS blades Single light fixture with opal frosted glass 1 x 80 W, R7 (included) Includes remote.
SIG3.2 Engineering and Manufacturing Borzoo Pourabdollahian Politecnico di Milano First GaLA Alignment school
IFR End Door Enhancement Mechanical Engineering Status & Installation Issues H. James Krebs June 23, 2001.
4th Grade Math Common Core Pacing Resources: Common Core Standards
This project is Funded by European Union Additive Technologies for the SMEs Aditivne tehnologije za mala i srednja velika poduzeća.
Neutronics Analysis for K-DEMO Blanket Module with Helium coolant June 26, 2013 Presented by Kihak IM Prepared by Y.S. Lee Fusion Engineering Center DEMO.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
1.  YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. ( Dim. inspection 680 mm (0,-0.5)  Fasteners =
The Mission: In order to produce luminosities appropriate for Run II levels, a better understanding of the Tevatron’s orbit would be required. To do that,
Using Stress Analyzer for Tensile Testing © 2012 Project Lead The Way, Inc.Principles Of Engineering.
Mobera – Understanding Your Requirements. Target – A Case Study Value (£m Revenue) Fixed Line10,139,479,259,068,93 Mobile / Cellular.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
RAFT FOUNDATIONS MAT FOUNDATION.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Ken Bloemer, Ph.D. Director Visioneering Center KEEN Co-PI.
3rd Annual Conference on Public Procurement Athens, 20 June 2014 Bruno CARRIERE General Director UniHA 1June 20 th 2014Bruno CARRIERE - UniHA A federative.
MTA Installation Meeting March 7, 2007 Agenda 1)Progress report (Fernanda) 2)Water skid discussion (Maurice) 3)Alignment needs (O’Sheg + all) 4)AOB Key.
CM focuses on controlling outcomes. CM controls change, making sure that its impact is assessed and that every effort is made to prevent erosion of functionality.
The Yale TRT Effort Paul Tipton, Yale University TRT 20 th Anniversary, June 26, TRT 2013 It’s all Brig’s Fault.
Engine Disassembly manual. Oil plugs/ 10 mm wrench.
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
House of Quality High relationship  Medium relationship  Low Relationship Customer Requirements Customer Importance Target Values.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Procurement & Contract Process. The Contract - Principles  Outcome focused  Evidence based  Balance between universal and targeted services  Flexible.
© Oxford University Press How are the plates moving?
Marketing Science Conference, May 1999 – 1 Future Plans Gary L. Lilien Arvind Rangaswamy Penn State University Marketing Science conference, May 1999.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Current Use of GIS Technology by the Redevelopment Agency Presented by: Drew Gidlof Mike Luken Katie Yancey.
Stefan Mozar IEEE Sections Congress 2017 – Sydney 11 August 2017
CERN – Zanon discussions
M. Sullivan SuperB XIII June 1-4, 2010 Elba, Italy
SPARC Review Committee Meeting
New Design for Beam Test Structure
Chemical Engineering for 3rd Graders
4.2 Estimating Sums & Differences
Scientific Assembly Of Industrial Engineering
Using Stress Analyzer for Tensile Testing
Strikes & Spares.
What is collaboration? Turf Trust Compet e Co-exist Communicate
Overview of Alignment Engineering Group Downtime Activities
Before: December 4, 2017 Solve each system by substitution. Steps:
Liz Gorman, Tollway Executive Director June 14, 2018
Investments 4/8/2019 Technology Industries of Finland.
STEEL PLATES.
Electric Forces and Electric Fields
3rd International Scientific Conference - Conference Announcement and Call for Abstracts 3rd International Scientific Conference: Research as a Driver.
Senad Kudumovic Design engineer
Engine Part ID Part 1.
Engine Part ID Part 2.
Engine Part ID Part 2.
Helen Ewles Senior Policy Advisor – Research and Innovation
End of the Year 4TH GradeData Review
3rd Annual Conference on Public Procurement Athens, 20 June 2014
GEn-RP engineering & design Status
Presentation transcript:

Alignment Engineering Group Sector 20 Shielding Wall ROD June 3rd, 2004 06-08-04 Alignment Engineering Group

Q901 Origin of Sector 20 Network 06-08-04 Alignment Engineering Group

Setting Fixture to JackPoint 21-1 06-08-04 Alignment Engineering Group

Fixture Set => Point JP211ARM 06-08-04 Alignment Engineering Group

Alignment Engineering Group Target on JP208ARM 06-08-04 Alignment Engineering Group

Alignment Engineering Group Quad Q801 06-08-04 Alignment Engineering Group

Alignment Engineering Group Brass Plate Sector 21 06-08-04 Alignment Engineering Group

Alignment Engineering Group New 3D Monumentation 06-08-04 Alignment Engineering Group

Alignment Engineering Group 06-08-04 Alignment Engineering Group