EPN FDG Rollout Open FDG zones in 2018 FDG zones in Q1 2019

Slides:



Advertisements
Similar presentations
Biomethane connections – current developments Biomaster Network Meeting Norwich 11 th November 2011 David Pickering.
Advertisements

Completing the EU internal energy market IFIEC, 22 November 2011
Investment planning David van Kesteren System Design.
1 Optimising grids Understanding capacity needs to make networks more efficient Mike Kay Networks Strategy and Technical Support Director 23 September.
Going for growth in Hertfordshire John Gourd Chairman Hertfordshire Local Enterprise Partnership.
Completing the EU internal energy market
The Governance of Urban Energy System Transition: the Case of Smart Grids Amin Dehdarian École Polytechnique Fédérale de Lausanne (EPFL) / Switzerland.
Map Skills Chapter 4 – Grid References. Grid Squares If you look at a map you will notice that it is covered in squares. These squares make up a grid.
MID WEST DATACENTRE National Technology Park, Plassey, Limerick High Specification Facility totalling c.6,267 m² on c.1.2 hectares Ready to go site and.
Delivering Better Broadband. Broadband Programme Update Broader Picture – Why is broadband important nationally? BDUK and DEFRA explained The Picture.
Multiplication Table Grid
The Centre For S USTAINABLE E LECTRICITY & D ISTRIBUTED G ENERATION Creation of SEDG The Centre for Sustainable Electricity and Distributed Generation,
WPD Connections Overview
Book Reference : Pages To understand how electricity is distributed in the UK via the National Grid 2.To understand how transformers are used.
Working together to deliver results Tony Wilson Policy Director Centre for Economic and Social Inclusion.
Mrs. Emily W. Pleasants. Geography Geography is concerned with the distribution of people and things and the location of places on the earth's surface,
Distributed generation and non-conventional fuels Akanksha Chaurey India Electricity 2006 May 11-13,2006 Pragati Maidan, New Delhi.
Frankfurt (Germany), 6-9 June 2011 Steven Inglis – United Kingdom – RIF Session 5 – Paper 0434 Multi-Objective Network Planning tool for the optimal integration.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Dave Openshaw UK Alpha 6 – Block 3 Barcelona May Network Asset Management as a Contracted Service Provision based on paper TFS_Openshaw_C1.
A National Grid Fit For The Future Chris J Murray. Newton Institute - 26 th May 2010.
Transmission Issues & Renewables Perspectives of a Wind Developer.
Presented by Edward VanHoose Association of Illinois Electric Cooperatives.
The Energy Community C hrissa Argyriou – European Commission – DG Transport and Energy Electricity and Gas
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
Uncontrolled copy not subject to amendment Navigation on Land Using Map and Compass Learning Outcome 1 Part 1: Be able to show the different types of North.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Frankfurt (Germany), 6-9 June 2011 Marcus R. Carvalho – Brazil – RIF Session 5 – Paper ID 0728 LONG TERM PLANNING BASED ON THE PREDICTION AND ANALYSIS.
Multiplication Table Grid
Sectionalism Map Assignment
GCSE Science A Physics 1 Transmission of Electricity Learning Outcomes Understand the need for an electrical distribution system Describe the national.
Electrical Fuses Market Research Report: Global Analysis
Connecting Low Carbon Generation Clive Goodman Primary System Design Engineer.
S&C Electric Company Princess House, Princess Way, Swansea. SA1 3LW
1: Parts of a compass 2: Magnetic Variation 3: GMA (Grid, Magnetic, Actual) 4: How to convert between magnetic & grid 5: World magnetic zones COMPASSES.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Grid Code - Real-time data exchange with DNOs
Electricity is produced at the power station.
Nicholas Albrecht Government Relations Manager - Vector
Network Innovation Allowance Project: South East Smart Grid
SKILL- Direction North West East South North- West North- East
Overview on Renewable energy in Bulgaria
Statement of Works (SoW)
Statement of Works Focus Group
Power Potential: A New Market for Reactive Power
LPN FDG Rollout FDG zones in Q Brimsdown Acton Lane 22kV
Sellindge & Canterbury North
DG Mapping Tool Workshop UK Power Networks
FE College Open Days 2015 Check actual times from the college websites
Label Name Label Name Label Name Label Name Label Name Label Name
Technical support to EaP-Transport Panel
Chapter 2 – Mapping Our World
Planning Committee- Map
5 × 7 = × 7 = 70 9 × 7 = CONNECTIONS IN 7 × TABLE
5 × 8 = 40 4 × 8 = 32 9 × 8 = CONNECTIONS IN 8 × TABLE
Republic of Poland Office of Electronic Communications
4 × 6 = 24 8 × 6 = 48 7 × 6 = CONNECTIONS IN 6 × TABLE
5 × 6 = 30 2 × 6 = 12 7 × 6 = CONNECTIONS IN 6 × TABLE
Electricity Registration
Data Management for Sustainable Electrification
10 × 8 = 80 5 × 8 = 40 6 × 8 = CONNECTIONS IN 8 × TABLE MULTIPLICATION.
3 × 12 = 36 6 × 12 = 72 7 × 12 = CONNECTIONS IN 12 × TABLE
Record your QUESTIONS as your read.
5 × 12 = × 12 = × 12 = CONNECTIONS IN 12 × TABLE MULTIPLICATION.
5 × 9 = 45 6 × 9 = 54 7 × 9 = CONNECTIONS IN 9 × TABLE
© 2016 Global Market Insights. All Rights Reserved Capacitor Banks Market trends research and projections for 2019 – 2025.
© 2016 Global Market Insights. All Rights Reserved Nuclear Battery Market trends research and projections for 2019 – 2025.
3 × 7 = 21 6 × 7 = 42 7 × 7 = CONNECTIONS IN 7 × TABLE
IWEA Offshore Wind Conference 2019 – Developer Led ‘v’ Centralised Grid Connections 12th September 2019.
Main needs of electricity system of the Czech Republic
Presentation transcript:

EPN FDG Rollout Open FDG zones in 2018 FDG zones in Q1 2019 Map Label Grid Supply Point (GSP) 1 Barking West 2 Barking 132 3 Rye House 4 Tottenham 5 Mill Hill 6 Elstree Stanmore 7 Willesden 8 Brimsdown 9 Elstree 10 Watford South Open FDG zones in 2018 FDG zones in Q1 2019 FDG zones in Q2 2019 FDG zones in Q3 2019 FDG zones in Q4 2019 FDG Open Walpole FDG Open Norwich Q4 2019 Eaton Socon Q1 2019 Bramford FDG Open Burwell Table 1 – GSP Names 2018 Wymondley Indicative dates for FDG rollout in EPN, subject to review by UK Power Networks and dependant on the uptake of DG in the area and completion of network investments; UK Power Networks is deploying Active Network Management in 2019 which will facilitate the rollout of FDG connections; UK Power Networks will offer FDG connections if technically and economically feasible; Zones are indicated by Grid Supply Point (GSP) which is “any point at which electricity is delivered from the National Electricity Transmission System to the DNO’s Distribution System” (Distribuion Code). 2018 Pelham Q2 2019 Sundon Q2 2019 Braintree 3 9 Q4 2019 Rayleigh 10 8 Q3 2019 Amersham 6 4 2 7 5 Q4 2019 GSP names as per Table 1 1 Q3 2019 West Thurrock Q3 2019 Warley Q4 2019 Tilbury