EGEA Report on WG 9 Activities

Slides:



Advertisements
Similar presentations
COMPLAINTS POLICY JULY COMPLAINTS POLICY Why do we have this Policy? We are committed to delivering high quality services to all of our customers.
Advertisements

Continuing Competence For North Carolina Nurses
Warren County Schools Academically and Intellectually Gifted (AIG) Plan AIG Plan Presented to the Warren County Board of Education June 11, 2013.
Academic Selectors can log in using the same web links as applicants. Note that the screens are regularly reviewed and enhanced. The initial log on screen.
HAAGA-HELIA’s accreditation process stages for AACSB Fall 2010Spring 2011Fall The applicant school establishes AACSB International membership.
The trials and tribulations of setting up a student pre-arrival portal Florencia Franceschina Manchester Metropolitan University
Doc.: IEEE /0095r1 Submission Jan 2005 Gregg Rasor, FreescaleSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
Ashley DiBlasi Certification Manager
Working Group on Quality Reviews of Energy Data
Understanding Standards: Nominee Training Event
Closing (and Final) Report to 802 EC Friday July 22, 2011
November Plenary Closing Report
IEEE WG Closing Report – July 2006
doc.: IEEE /479r0 Mika Kasslin TGh chair
Come and be a member of our website.
as of today 123 registered participants
Interested to become an EOQ Member?
Sept 2018 Sub 1 GHz Interest Group
TGaf Waikoloa Closing Report
Liaison report from the Wi-Fi Alliance to WG
IEEE WG Closing Report – July 2006
Alignment of Part 4B with ISAE 3000
March Plenary Opening Report
Submission Title: TG4m 4TV Closing Report for January 2013
STRATEGIC PLANNING Auburn University A/P Assembly Update June 22, 2005
IEEE 802 IMT-Advanced Technology Proposal Process
NWWAC Working Group 4 Irish Sea Ghent, 4 July 2018.
Initial Thoughts on GAC Operating Principles Evolution
Follow-up actions to the June 2017 Standards Working Group meeting
TGaf Geneva Closing Report
IEEE March 2014 Nominee Statement
doc.: IEEE <doc#>
IEEE ah Timeline Projection
Postgraduate Academic Selector Portal
Jul 15, /15/10 07/15/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report.
TGaf San Francisco Closing Report
TGad July 2010 Editor Report
Postgraduate Academic Selector Portal
On-Line Certificate System
March Plenary Opening Report
IEEE 802 IMT-Advanced Technology Proposal Process
November Plenary Opening Report
TGaf Waikoloa Closing Report
Guidelines for the implementation of Regulation (EC) No 91/2003 of the European Parliament and of the Council on Rail transport statistics version 6.0.
March Plenary Opening Report
TGaj Editor Report for CC22
November Plenary Opening Report
March Plenary Closing Report
Background Paper for GISFI Spectrum Group
November Plenary Opening Report
July Plenary Opening Report
TGn Editor Report Sept 2008 Date: Authors:
[RR-TAG Liaison Report to ]
[RR-TAG Liaison Report to ]
Nov 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for TG4j (MBAN) Task Group, Nov.
TGmb Editor Report - May 2010
TGaf Orlando Closing Report
IEEE 802 IMT-Advanced Technology Proposal Process
Matching Gift Roadmap Jump-start your matching gift efforts.
Report of the Technical Subcommittee
Follow-up of the 2015 meeting Items 2 & 3 of the agenda
Scholarship Program NEXT.
IEEE White Space Radio Status Report
Report on Date: Authors: July 2017 July 2013
WG2 ADAS report – May Marseille
IEEE 802 IMT-Advanced Technology Proposal Process
Presentation transcript:

EGEA Report on WG 9 Activities EGEA General Assembly, 14th June 2013, Oslo

Activities for the HFO R1234yf Service Station WG9 has met 3 times since the last EGEA General assembly WG 9 has now completed the specification for MAC Service Station for use with HFO1234yf. ..\..\EGEA WG9 MAC\Mtg 07_05_2013\Docs for Dist\EGEA WG9 Draft AC Equipment spec_07052013_Vers 011.doc A decision is sought from the EGEA boatd if we should now seek a recognised standard such as a PAS. The basis for an EGEA certification has been determined to assure quality and adherence to the specification by manufacturers. Acceptance of the issuing of an EGEA approved certificate or ‘stamp’ is now sought from the EGEA Board and members.

Other activities and next steps The ‘Best Practise’ document is progressing and the next meeting an initial draft will be produced with input from all WG members. Activities regarding the issue of HFO 1234yf and the implementation of 2006/40/EC. Letter to member states via associations asking about local implementation. Suggestions for including a web page on the EGEA Website for the downloading of various documents and application for a MAC approval Investigation on other equipment to be considered for the same process of specification. Next Meeting is planned for 24th July 2013.

Thank you! I would also like to take this opportunity to thank my fellow colleagues of WG9 foir the time and effort spent so far and l look forward to continuing this worthwhile work with you. 4