Introduction and Requirements

Slides:



Advertisements
Similar presentations
R. Bruce, M. Giovannozzi, S. Redaelli With essential input from G. Arduini, R. De Maria, S. Fartoukh, M. Fitterer, R. Tomas, J. Wenninger, aperture team.
Advertisements

Collimation with retracted TCSGs R. Bruce, R. Kwee, S. Redaelli.
CLIC collimator survival IWLC 2010 J.L. Fernández-Hernando – ASTeC/Cockcroft Institute (Daresbury Lab.) 21/10/2010 J.L. Fernández-HernandoASTeC/CI21/10/2010.
Collimation MDs LHC Study Working Group Daniel Wollmann for the Collimation-Team, BLM-Team, Impedance-Team, … LHC Study Working Group,
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
1 Luminosity monitor and LHC operation H. Burkhardt AB/ABP, TAN integration workshop, 10/3/2006 Thanks for discussions and input from Enrico Bravin, Ralph.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
Concept of a Collimation System with Enhanced Operational Stability and Performance.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
Work required to have a proposal in June (for discussion) RA, CPM, 15/4/03.
RA CPM 21/2/03 1 Present Approach and Status R. Assmann for the LHC Collimation Team Problem: Al/Cu system would not resist irregular dumps (pre-trigger.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
RWA, 4/11/2005 Review Movement & Motorization November 4 th, 2005 Program Introduction & Charge – R. Assmann Mechanical design & SPS results – O. Aberle.
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
Review of FCC-hh optics & beam dynamics IPNO, Orsay, Paris November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Heat Deposition Pre-Evaluation In the context of the new cryo-collimator and 11-T dipole projects we present a review of the power deposition studies on.
Frank Zimmermann, material for LTC coherent tune shift due to collimator impedance - its dependence on gap size, bunch length, chromaticity, beta function,
Collimator settings for 2012 R. Bruce, R. Assmann for the collimation team
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Overview of Wire Compensation for the LHC Jean-Pierre Koutchouk CARE-HHH Meeting on beam-beam effects and beam-beam compensation CERN 08/28/2008.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
How low can we go? Getting below β*=3.5m R. Bruce, R.W. Assmann Acknowledgment: T. Baer, W. Bartmann, C. Bracco, S. Fartoukh, M. Giovannozzi, B. Goddard,W.
R. Assmann Collimator Functionality, Performance and First View on Set-up and Optimization R. Assmann AB/ABP, CERN External Review of the LHC Collimation.
R. Bruce, M. Giovannozzi, S. Redaelli With essential input from G. Arduini, R. De Maria, S. Fartoukh, M. Fitterer, R. Tomas, J. Wenninger, aperture team.
Halo Collimation of Protons and Heavy Ions in SIS-100.
C. Bracco, R. Bruce, B. Goddard, C. Wiesner, A. Lechner, M. Frankl
Layout Daniel Schulte for the FCC-hh teams ALBA, November 2016.
News and Introduction from CERN June 15th, 2005
Luminosity monitor and LHC operation
ICE SECTION The coolest place to be! Elias Métral
Ion Commissioning: Thursday & Friday
Impact of running with LHCf and early Totem 90 m optics
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Introduction: FCC beam dumping system
Machine-Experiment Interface
CLIC Klystron-based Design
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Upgrade Strategy for the Experimental Vacuum Systems
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
Beam collimation for SPPC
Intensity Evolution Estimate for LHC
CERN, Geneva, Switzerland PAC 2003 – Portland, Oregon, USA
Limits on damping times
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LHC Collimation Requirements
Interaction Region Design Options e+e- Factories Workshop
The LHC Collimation Project Implementation of a Phased Approach
Collimation after LS1: cleaning and β* reach
LHC Beam Operations Past, Present and Future
Collimation margins and *
Luminometer Integration at IR2
Machine Tolerances in Cleaning Insertions
HL-LHC operations with LHCb at high luminosity
Collimators: Operations - Baseline Assumptions
LHC External Collimation Review
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Large emittance scenario for the Phase II Upgrade of the LHC
What systems request a beam dump? And when do we need them?
Presentation transcript:

Introduction and Requirements R. Assmann for the collimation team

Basic constraints Have a collimation system produced and installed for 2007, with a reasonable cost. The system must be a robust and flexible tool for operation. Nominal performance must be achievable. The layout of cleaning insertions must be finalized by the end of 2003.

Collimation project Started in last October. Team and individual responsibilities set up by January. Half a year of intense work to arrive at a coherent proposal. Final consensus was built in the collimation team over the last month (collimation WG, collimator project meeting, ABP+ATB meetings). Proposal is presented now, as we must enter into the detailed engineering phase.

Ideas/comments/work by many different people E.g. 23 persons presented their work at the CWG or CPM in 2003 (see web). Strong support from AB/ABP, AB/ATB, AB/BDI, AB/BT, AB/CO, AB/OP, AB/RF, AT/MTM, AT/VAC, EST/ME, MPWG, TIS/RP + collaborators at IHEP and TRIUMF. Thanks for the support! Proposal refers to work mostly done in AB/ABP, AB/ATB, AB/BT, AT/VAC, TIS/RP groups (1000’s of CPU and “man” hours). Not one revolutionary idea but many ideas in an evolutionary process. The result has been achieved by the whole team and would not have been possible without relying on the past work.

Driving beam impact requirements 450 GeV: 1 full p batch (4 PS batches) on 1.2 mm × 1.2 mm. 7 TeV: 8 p bunches over 1 mm × 0.2 mm (irregular dump after factor 2.5 improvement due to AB/BT efforts). Severe: 2 full Tevatron beams. 4×1011 p/s for 10 s, 8×1010 p/s continuously in 200 nm surface. 10 times less for secondary collimators. (slow case) Note: Only one failure at a time is assumed. Almost any jaw can be hit (keep flexibility for the LHC tune). Transfer line collimation protects the LHC arcs but not always the LHC collimators. Corresponding requirements defined for ions. Collimators should withstand these impact scenarios (expected problems, not worst-case: collimators will be destroyed in worst case: dump failure). Choice of appropriate materials/cooling! (V. Vlachoudis + O. Aberle + N. Hilleret).

Other requirements Mechanical tolerances can be met (~ 25 mm surface flatness, …) Collimator opening gap can be guaranteed at all times (error < 50 mm) Collimators can be moved by small steps (~ mm, ~mrad) Settings must be reproducible to < 20 mm Vacuum is manageable (for C: T<50˚C, small surface, good outbaking) Local e-cloud is manageable (installing clearing electrodes, solenoids?) Collimators can be serviced and exchanged in high-radiation area Downstream equipment is OK for considered cases Reliability must be sufficiently good Impedance is manageable (~ 110 MΩ/m) for the overall system Operational tolerances (orbit/beta beat) are manageable Cleaning efficiency is sufficient Loss rates are acceptable (no quenches, acceptable background) Choice of appropriate technology (O. Aberle) and impedance (F. Ruggiero).

Presentations Several 10 min presentations on particular aspects of LHC collimation followed by the proposal: Energy desposition in different materials (V. Vlachoudis) Mechanical robustness, choice of material, and mechanical design (O. Aberle) Vacuum issues for the collimator jaws (N. Hilleret) Impedance issues (F. Ruggiero) Proposal (R. Assmann)

R. Assmann for the Collimation Team Proposal R. Assmann for the Collimation Team

Basic constraints Have a collimation system produced and installed for 2007, with a reasonable cost. The system must be a robust and flexible tool for operation. Nominal performance must be achievable. The layout of cleaning insertions must be finalized by the end of 2003.

Guiding principles Most rapid advancement by… …pursuing most simple solutions. …avoiding additional concerns like toxic materials (at least for initial installation). …minimizing changes with respect to V6.4 collimation system. …selecting designs where we have experience at CERN (e.g. LEP). …introducing flexibility into the design (solve some problems later).

How to achieve this? Specialized sub-systems targeted at specific purposes instead of one general purpose system. Stage collimation system over 4 more years (R&D, production, installation, cost, …). Minimum cost, maximum robustness start-up systems with placeholders for upgrades (fewer components). Additional upgrade phases for nominal performance (more components).

Imagine collimation as a game of golf… You can do it with one club only. However, if you want to win you better have more than one club: Best chances to win the “collimation game” with specially adapted, specialized sub-systems. More effort to understand what “club” to use for what. However, easier and better “playing” (operation) though there are more collimators.

The collimation “clubs” Maximum robustness, minimum cost IR3/IR7 collimation system (C) for injection&ramping, commissioning, early physics (running at impedance limit). Thin metallic coating for going further (survival of coating unclear). “Tertiary” collimators in IR1, IR2, IR5, IR7 for local protection and cleaning at the triplets. Thin targets for beam scraping. Metallic “hybrid” secondary collimators in IR7 for nominal performance, used only at end of squeeze and stable physics. Additional placeholders for upgrading to maximum cleaning efficiency. Phase 1 Phase 2 Phase x

Phase 1: The robust 3-stage system for injection/ramp and early physics TCDQ inj, 7 TeV (squeezed) Primaries at inj, 7 TeV (squeezed) Secondaries at 0.45 – 7 TeV (unsqueezed) Secondaries at 7 TeV (squeezed) Tertiaries at 7 TeV (squeezed) Cu C C C C Triplet 13.5 s 10 s ± 13 stop ± 6 s ± 8 mm (7 sinj) ± 2 mm (10.5 stop) ± 13.5 stop - 10 s C - 13.5 s C C C Cu Triplet 100 cm 10 m 20 cm 100 cm 100-150 cm Primaries very robust, robust low-Z secondaries, relaxed tolerances: mechanical and for orbit/beta beat, good efficiency. Space allocations for phase 2 upgrade. Triplet protection (possible later local cleaning at triplets).

Phase 2: The robust 3-stage system plus low impedance hybrids TCDQ inj, 7 TeV (squeezed) Primaries at inj, 7 TeV (squeezed) Secondaries at 0.45 – 7 TeV (unsqueezed) Secondaries at 7 TeV (squeezed) Tertiaries at 7 TeV (squeezed) Metal Metal Cu C C C C Triplet 13.5 s 10 s ± 1.5 mm* (7 stop) ± 10 stop ± 6 s ± 8 mm (7 sinj) ± 10 stop ± 8 mm (7 sinj) - 10 s Metal C - 13.5 s C C C Triplet Cu Metal 10 m 20 cm 100 cm ≤ 100 cm 100 cm ≤ 100 cm 100-150 cm *A few hybrid collimators (1-2) might be retracted to 10.5 s (into shadow of TCDQ). Take into account known phase advances for any given configuration. Hybrid secondaries with metallic surface, only used towards end of squeeze and in stable physics (only dump failure relevant for H collimators in phase). Rely on local triplet cleaning for these few collimators.

Efficiency for different solutions: Efficiency at 10 sigma (7 TeV) roughly the same as with the Al/Cu system! Larger impact parameters (results in larger tolerances).

Required lengths of low Z jaws: Keep secondaries (0.5 m Cu) and vary material and length of primary collimators! Choose 0.2 m C for primary collimators and vary material and length of secondary collimators! Observations: Win factor two for 0.2 m graphite (C)! Stay with 0.2 m length for primary Observations: Secondary C collimators of 1 m length will restore the cleaning efficiency of the old system. C system: 0.2 m and 1.0 m jaws! R. Assmann, J.B. Jeanneret

Why running at the impedance limit? We must choose: Maximum robustness, e.g. C run at impedance limit limit beta* If limit is violated: Dump of unstable beam Low impedance, e.g. Be run at robustness limit limit beam intensity If limit is violated: Damage to Be jaw, possible contamination or Our solution: Choose a maximum robustness system (reliable and robust tool). It will last. Complement with metallic triplet collimators (protection and local cleaning). Complement with thin metallic coating. Upgrade with “hybrid” metallic secondary jaws, only used in stable conditions.

System summary Minimum beta* = 0.85 m. (loose factor 0.85/0.55 ≈ 1.6) Phase 1 (2007-2008) Injection optics: Settings 6/7 s. Squeezed optics: Settings 7/10.5 s. Tightest tolerances at collimators relaxed by a factor ~3. Impedance OK for 50% nominal intensity. Minimum beta* = 0.85 m. (loose factor 0.85/0.55 ≈ 1.6) Maximum luminosity reach: 16% (25 ns) (with factor 4 from half bunch intensity) Hope to gain further on impedance: Modified optics. Options to go beyond Use 10 mm Cu coating if still existing (gain factor 5 in impedance, go to nominal 6/7 s settings). Problem: Coating might not survive (further studies)! Use local cleaning at triplets for smaller beta*. Problem: Generation of background in the experiments. Use metallic hybrid collimators of phase 2. Likely need to rely on this. Far future, if required Upgrade for best possible cleaning efficiency, using placeholders in optics.

Our proposal Consider phase 1 collimation as new baseline for all further work. Start detailed engineering of Phase 1 and finalization of LHC optics and layout now. Rely on LEP experience for the mechanical design choices. Start detailed studies on efficiency, machine protection, beam loss, radiation, operational studies for the new baseline in September 2003. Authorize R&D for phase 2 collimation to support a later decision on implementations beyond Phase 1.

Questions Is this staging concept reasonable and should be pursued? Are all the components for phase 1 accepted (IR3/IR7 collimation, tertiary collimators, scrapers)? Is the reduction in number of components in IR7 accepted, reducing the cleaning efficiency to that of V6.4 collimation? Are the imposed limitations acceptable for the LHC commissioning and early running? Can we start the further work with the proposed schedule?