Progress on EXPreS at JBO Ralph Spencer

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Progress With iBOBs at Jodrell Bits & Bytes Meeting, JBO, th Dec 2007 Jonathan Hargreaves Electronic Engineer, Jodrell Bank Observatory.
EXTERNAL COMMUNICATIONS DESIGNING AN EXTERNAL 3 BYTE INTERFACE Mark Neil - Microprocessor Course 1 External Memory & I/O.
The CVN Real Time Correlator Zhang Xiuzhong, Chen Zhong Shanghai Astronomical Observatory China 4th e-VLBI Workshop Sydney
Software Defined Radio Testbed Team may11-18 Members: Alex Dolan, Mohammad Khan, Ahmet Unsal Adviser: Dr. Aditya Ramamoorthy.
Motor Control Lab Using Altera Nano FPGA
Super Fast Camera System Performed by: Tokman Niv Levenbroun Guy Supervised by: Leonid Boudniak.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Ongoing e-VLBI Developments with K5 VLBI System Hiroshi Takeuchi, Tetsuro Kondo, Yasuhiro Koyama, and Moritaka Kimura Kashima Space Research Center/NICT.
 Chasis / System cabinet  A plastic enclosure that contains most of the components of a computer (usually excluding the display, keyboard and mouse)
Station Board EVLA F2F Meeting: December Dave FortEVLA F2F Meeting: 11/12 December Outline Station Board Review Station Board Status Delay.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
IVS-4th General Meeting, Concepción- Chile, Jan 2006 DBBC - A Flexible Platform for VLBI Data Process G. Tuccari, S. Buttaccio, G. Nicotra - Istituto di.
High Data Rate Transfer for HEP and VLBI Ralph Spencer, Richard Hughes-Jones and Simon Casey The University of Manchester Netwrokshop33 March 2005.
High Bandwidth Data Acquisition and Network Streaming in VLBI Jan Wagner, Guifré Molera et al. TKK / Metsähovi Radio Observatory.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
Introduction VLBI_UDP is an application being developed to transfer VLBI data using the UDP protocol. Initially developed by Richard Hughes- Jones for.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Connect. Communicate. Collaborate 4 Gigabit Onsala - Jodrell Lightpath for e-VLBI The iNetTest Unit Development of Real Time eVLBI at Jodrell Bank Observatory.
Testing of ABC  Not to scale! 100nF Edge Sensor wired to A9, A10 ? ABC nF NB graphic is not an exact match with “ABC_Pads_V5.2.pdf”
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
18-19 July, 2002Correlator Backend System OverviewTom Morgan 1 Correlator Backend System Overview Tom Morgan, NRAO.
Configuration Mapper Sonja Vrcic Socorro,
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
High Speed Digital Systems Lab Spring/Winter 2010 Project definition Instructor: Rolf Hilgendorf Students: Elad Mor, Ilya Zavolsky Integration of an A/D.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
1 eVLBI Developments at Jodrell Bank Observatory Ralph Spencer, Richard Hughes- Jones, Simon Casey, Paul Burgess, The University of Manchester.
Data delayed Real Time Data Transfer for Very Long Baseline Interferometry Simon Casey, Richard Hughes-Jones, Stephen Kershaw, Ralph Spencer, Matt Strong.
Broadband Interfacing eMerlin-JIVE (1-10Gbps) Onsala-Jodrell Bank (
NEXPReS Period 3 Overview The hunt for 4Gbps fringes Or, may the fringe be with you Or, nothing like living on the edge Arpad Szomoru, JIVE.
FABRIC WP1.2 Broadband Data Path: Protocols and Processor Interface Bonn 20/09/07 Ralph Spencer The University of Manchester.
Title FABRIC Progress - Mark, Huib etc. T. Charles Yun Project Manager EXPReS/JIVE.
What is FABRIC? Future Arrays of Broadband Radio-telescopes on Internet Computing Huib Jan van Langevelde, JIVE Dwingeloo.
A Wide-Band VLBI Digital Backend System Alan Whitney Shep Doeleman Brian Fanous Hans Hinteregger Alan Rogers MIT Haystack Observatory 10 Jan 2006 IVS General.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
Progress on EXPReS at JBO
Chapter 2 PHYSICAL LAYER.
Fan Assembly Driven by Magnetic Fields
JIVE UniBoard Correlator External Review
SA1: overview, first results
Overview of 4Gbps connectivity for Nordic-MERLIN fringe tests
Status of NA62 straw readout
Mark 5 / VLBA Correlator Topics
EXPReS, NEXPReS, UniBoard
Concepts for a Next-Generation VLBA
The UniBoard Generic Hardware for Radio Astronomy Signal Processing
Multifunctional Digital Backend (MDBE) for "Quasar" VLBI-network
Hubs Hubs are essentially physical-layer repeaters:
JIVE UniBoard Correlator (JUC) Firmware
Hubs Hubs are essentially physical-layer repeaters:
EVLA Correlator F2F Meeting Dec , 2007
J D Romney, W F Brisken, S J Durand
UK ECAL Hardware Status
Dynamic Packet-filtering in High-speed Networks Using NetFPGAs
Protocol layering and data
John Conway Bonn, Sept 20th, 2007
SA1: third year overview
The e-EVN Arpad Szomoru, JIVE.
Correlator Growth Path
Protocol layering and data
DBBC Stutus Report November 2007
The QUIET ADC Implementation
Error Checking continued
Transport Layer 9/22/2019.
SKAMP Square Kilometre Array Molonglo Prototype
Presentation transcript:

Progress on EXPreS at JBO Ralph Spencer SA: eMERLIN out Fabric: Protocols, Onsala-eMERLIN in

Personnel changes: Jan 08 Richard Hughes-Jones left to join DANTE (but Visiting Fellow at The University of Manchester) Jan 08 Simon Casey joined Onsala (gained PhD in Dec 2008) Stephen Kershaw left July 2008 (joined HorNet university Halls Of Residence Network, writing up for an MPhil) Tony Rushton will join EXPReS for a short period on submission of his PhD – subject to board approval?? January 2009 Expres update 01/2009

E-MERLIN Out (SA) Progress with e-MERLIN (JH, STG): Correlator racks arrived and powered up Station board arrived – firmware being implemented Correlator boards expected and remaining station boards expected ~April Digital links being implemented on local telescopes January 2009 Expres update 01/2009

E-MERLIN progress Expect further station boards and one baseline board this week Expect full system by spring/early summer. Correlator passed CDR at NRAO – no further debuggung required January 2009 Expres update 01/2009

E-MERLIN Out (SA) contd Alternative multi-telescope connection to JIVE (PB) Using existing analogue links and VLBI equipment One wideband (<=1Gbps) Station (local telescopes) One Outstation Terminal ('VLBA DAR') Outstations use only 128mbps max Therefore can add extra stations to VLBA DAR Suitable for recording or fibre transmission JIVE Correlator Network duplicates data stream Some logistical/connection constraints, uses 2x1 Gbps external links January 2009 Expres update 01/2009

Haystack Recording Experiment Record entire Merlin set on one Mark5 Disk Use just one polarization, and above methods Four telescopes into VLBA system, one per IF Two telescopes into Local system, one per IF (only two IF ip's available on local system) Needed for multiple correlations with different field centres for wide field observations (Lonsdale, M31)

FABRIC: Protocols Final report on protocol performance nearly ready Written by Stephen Kershaw, being revised by RES and RHJ Need comments and a few words from Arpad re multi-tasking. (b) 160 Mbyte (180x BDP) buffer (a) 0.9 Mbyte (BDP) buffer January 2009 Expres update 01/2009

Progress Testing 10Gb Links ----(1) eMERLIN IN: Onsala to Jodrell Tests in December 2008: link from Onsala to Jodrell is working well at up to 4.1Gbps There is no packet loss up to 4123Mbps Tests are continuing to characterise the link in both directions: transit times and ‘bunching’. A 16 packet high speed buffer has been added to the receive iBOB design to reduce packet loss due to bunching Packet loss for one million 8192 byte packets: iBOB at Onsala to iBOB atJBO January 2009 Expres update 01/2009

Progress Testing 10Gb Links ----(2) eMERLIN OUT: Jodrell to JIVE Standardize on the proposed VDIF application header, preceded by a 63 bit packet sequence number Conversion to Mk V frames done in software at JIVE iBOB set up to store a test pattern or snapshot of data in SRAM and spool it out at 1Gbps; to be used to test the link from Jodrell to JIVE while the eMERLIN correlator is being commissioned January 2009 Expres update 01/2009

Progress integrating with eMERLIN The correlator backplane I/O standard is eight row 2mm hard metric (HM) connectors (Top photo shows the back of the SB rack) Meritec cables used, connecting to Meritec ‘wafers’, rather than ribbon cable as orginally planned on flexibility grounds Inputs and outputs from different station boards can now be mixed on one iBOB ZDOK connector, one iBOB can process the data from two station boards A PCB to interface the 2mm HM backplane connector to the ZDOK is currently being fabricated. A mounting plate has been designed to support the iBOB and converter boards in the rack January 2009 Expres update 01/2009

FPGA Firmware Development A Finite Impulse Response (FIR) filter has been designed to take a 64MHz, 8 bit, or 128MHz, 4 bit signal from a filter chip and produce 8 or 16 VLBI compatible output bands. Simulation indicates that the filter will fit in the VSI chip, along with code to remove the eMerlin delay and station frequency offset A test configuration for the VSI chip has been coded in VHDL. One of the 18 filter bank chip outputs can be selected. Data from this chip are assembled into 32 bit words and sent to an iBOB. The iBOB will capture a snapshot of data from one or both polarizations in SRAM, which can be used to verify operation of the station board Graphical interface panels for the VSI chip configurations (export, import, and test) have been derived from the existing station board GUI java code. These may be used to select data source, frequency band etc., and monitor the data flowing through the VSI chip January 2009 Expres update 01/2009

Conclusion Good progress in implementing hardware and software, with most deliverables met Good prospect of astronomical tests at 4 Gbps between Onsala and JBO before end of August - depends on delivery of a correlator board Need the 4.1 Gbps link until at least then. January 2009 Expres update 01/2009