Ofcom 5 GHz Consultations Questions and Answers

Slides:



Advertisements
Similar presentations
ITU Regional Development Forum - Warsaw 7 May The Radio Spectrum Policy Programme & the Spectrum Inventory Pearse ODonohue Head of Radio Spectrum.
Advertisements

UK Spectrum Management Strategy: tomorrow’s challenges today Chris Woolford Director, International Spectrum Policy Radcomms 2014.
Doc.: IEEE /0023r1 Submission March 2010 Rich Kennedy, Research In MotionSlide 1 Ofcom 600 MHz Consultation Questions Date: Authors:
Doc.: IEEE /0498r0 Submission April 2008 Eldad Perahia, Intel CorporationSlide 1 Modifications to the 60GHz PAR & 5 C’s Proposal Date:
Doc.: IEEE /0294r0 Submission March 2015 Rich Kennedy, MediaTekSlide 1 DSRC Coexistence Tiger Team Report Date: Authors:
Doc.: IEEE /1537r1 Submission January 2016 Rich Kennedy, Unlicensed Spectrum Advocates, LLCSlide 1 IEEE Regulatory State of Affairs Date:
Doc.: IEEE /??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 0 Ultra Wideband in Europe The EC Decision January 2007.
Doc.: IEEE /0778r0 Submission Zhendong Luo, CATR July MHz PHY Transmission Date: Authors: Slide 1.
Gi-Fi Technology.
Operation of Radar Services in 76 – 81 GHz band
Updates on the digital dividend and UWB in the UK and Europe
IEEE RR-TAG Berlin Opening Report
IEEE ac/af and Spectrum Sharing
Status On Current DFS CEPT/ECC Civil/Military Meeting, November 2016, Prague Thomas Weber, ECO, Spectrum Management
Andy Gowans – OFCOM (UK) 14 January 2017
IEEE ac/af and Spectrum Sharing
IEEE af and Spectrum Sharing
IEEE Regulatory Ad Hoc Committee Closing Report
Andy Gowans – OFCOM (UK) 14 January 2018
IEEE Regulatory AHC Draft Teleconference Plan
April 2009 doc.: IEEE /xxxxr0 May 2014
RR-TAG (802.18) Liaison Report
IEEE Regulatory SC Waikoloa Closing Report
VHT SG Report to EC Date: Authors: July 2008 April 2007
Ofcom 5 GHz Consultations Questions and Answers
TV White Spaces: Other Considerations
View on EHT Candidate Features
EU-US-JP ITS Steering Group Annual Meeting 2018
IEEE af and Spectrum Sharing
IEEE Regulatory SC Palm Springs DRAFT Meeting Plan and Agenda
IEEE (RR-TAG) Liaison Report
April 2009 doc.: IEEE /xxxxr0 May 2014
Ofcom 5 GHz Consultations Questions and Answers
Ofcom 5 GHz Consultations Questions and Answers
FCC Spectrum Sharing in the 3.5GHz Band Comments Approval
Functional Requirements for EHT Specification Framework
IEEE Radio Regulatory TAG Waikoloa Meeting Plan and Agenda
April 2009 doc.: IEEE /xxxxr0 January 2018
<month year> doc.: IEEE < e> January 2012
VHT in Below 6 GHz Frequency Bands
VHT in Below 6 GHz Frequency Bands
IEEE RR-TAG Response to IEEE-BTS Reply Comments
Ofcom 5 GHz Consultations Questions and Answers
IEEE Regulatory Update Palm Springs 2012
IEEE /15 Regulatory SC San Diego Meeting Plan and Agenda
April 2009 doc.: IEEE /xxxxr0 January 2018
April 2009 doc.: IEEE /xxxxr0 January 2018
Ofcom 5 GHz Consultations Questions and Answers
IEEE RR-TAG Teleconference Plan and Agenda
RR-TAG Liaison Report May 2009 IEEE
IEEE Regulatory SC Teleconference Plan and Agenda
DSRC Coexistence Tiger Team Report
FCC FNPRM Responses Date: Authors: August 2016
IEEE RR-TAG Teleconference Plan and Agenda
April 2009 doc.: IEEE /xxxxr0 January 2018
Ofcom 5 GHz Consultations Questions and Answers
120 MHz PHY Transmission Date: Authors: January 2010
IEEE RR-TAG Teleconference Plan and Agenda
February 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Initiative to enable to operate.
RR-TAG (802.18) Liaison Report
IEEE Regulatory Updates
IEEE Regulatory SC DRAFT Teleconference Plan and Agenda
<month year> doc.: IEEE < e> January 2012
RR-TAG (802.18) Closing Report
The Case for Broadband Satellite 28 GHz
ECC actions on interference from 5 GHz RLAN into meteorological radars
FCC FNPRM Responses Date: Authors: August 2016
Functional Requirements for EHT Specification Framework
IEEE Regulatory SC Atlanta Closing Report
Ofcom 5 GHz Consultations Questions and Answers
Presentation transcript:

Ofcom 5 GHz Consultations Questions and Answers April 2009 doc.: IEEE 802.19-09/xxxxr0 May 2016 Ofcom 5 GHz Consultations Questions and Answers Date: 2016-05-25 Authors: Rich Kennedy, HP Enterprise Rich Kennedy, Research In Motion

April 2009 doc.: IEEE 802.19-09/xxxxr0 May 2016 Abstract This presentation is intended to be the collection point for answers to the Ofcom 5 GHz consultation questions. Rich Kennedy, HP Enterprise Rich Kennedy, Research In Motion

Ofcom 5 GHz Consultation https://mentor.ieee.org/802.18/dcn/16/18-16-0032-00-0000-ofcom-5-ghz-consultation.pdf Opening more of the 5 GHz band Short term 5725-5850 MHz Medium term 5150-5350 changes Long term 5350-5470 MHz This is the most important proceeding this year (at least) Deadline for comments: July 22, 2016

Consultation Goals This consultation sets out our proposals for increasing the amount of radio spectrum available for Wi-Fi in the 5 GHz band to deliver high speed wireless broadband for consumers. Wi-Fi is one of the UK’s most important vehicles for communications, commerce and entertainment. 85% of the UK’s 27 million households have a broadband connection. Virtually all of these households use Wi-Fi to provide the final link between their home broadband router and the various wireless devices in their homes. We have a specific short-term focus on the 5725-5850 MHz band… Re-examining the technical requirements for Wi-Fi Removing outdoor restrictions on Wi-Fi access to the 5150-5350 MHz range Retaining the longer term objective of opening up spectrum if possible at 5350-5470 MHz and 5850-5925 MHz

Consultation Question 1 Question 1: Do you agree with our proposal to prioritise consideration of the 5725-5850 MHz frequencies for Wi-Fi, subject to appropriate protections to other users, in particular satellite services? With hundreds of millions of people depending on Wi-Fi every day of their lives, we understand the need for maintaining sufficient spectrum to protect against network congestion and connection failures. As such, any decision that expedites the process of keeping up with the needs. We believe that Ofcom clearly understands and articulates the reasons for moving first on the 5725-5850 MHz band, and agrees with this choice. It should be noted, that this band is already open for RLAN use, many regions of the world and large markets.

Consultation Question 2 Question 2: Do you agree with our proposal to re-examine the requirement for DFS across the 5 GHz band, subject to appropriate protections to other users? Yes, however we believe that this should be a path to revising the technologies and not establishing new restrictions.

Consultation Question 3 Question 3: Do you think we should pursue the other options we have identified: opening up 5850-5925 MHz; outdoor Wi-Fi use at 5150-5350 MHz; and opening up the ‘centre gap’ at 5350-5470? Our answer to question 1. makes our opinion clear on the need for additional spectrum. These bands would enable not only improvement in the quality of connections, but also providing more wider channels, needed to support the demand for the higher throughput applications of the next five to ten years. Need to address/suggest the timing for the different ranges.

Consultation Question 4 Question 4: What are your views on the future growth in demand for Wi-Fi? In which use scenarios do you expect to see the greatest pressure for delivery of high quality Wi-Fi access? What evidence do you have to support your views? One future growth is streaming into vehicles; ships, planes, trains and automobiles. Using the our mobile phones will be more prevalent. Peak hours of use will be when people or home, e.g. streaming videos, etc.

Consultation Question 5 Question 5: Do you think technology improvements and densification of access points will be sufficient to meet demand or will there also be a need for more spectrum beyond that which we propose to make available? What evidence do you have to link between demand for data and demand for additional spectrum? Not sure this is one for 18 to answer?

Consultation Question 6 Question 6: What real life speed and quality of experience can consumers expect in practice from devices using the 5GHz spectrum as authorised in the UK now? What changes can we expect as the number of devices increases and technology improves? What difference in speeds and quality of experience would additional spectrum make? Bandwidth/speed to the home will increase over time. 11ax will help with access performance. Don’t list them all, just some benchmarks.

Consultation Question 7 Question 7: How important is contiguous spectrum? How wide should channels be to support future demand? Certainly, in the next five to ten years, wider channels to support the new applications, some of which we may not even anticipate today, will be necessary. However, in order to keep the 5 GHz band usable for the growing numbers of users, we believe the mmWave bands are better suited for this expansion. Opening gigahertz - wide channels in these bands is a better choice for the long term than doubling the 160 MHz wide 5 GHz channels.

Consultation Question 8 Question 8: Do you believe we have correctly identified the incumbent services in 5150-5925 MHz which need to be taken into account in considering opening up more 5 GHz spectrum for Wi-Fi? Are there any other services which will need to be taken into account in future studies? [We should pass on this question.]

Consultation Question 9 Question 9: What coexistence studies, measurement campaigns and mitigation techniques do you believe would be most effective for demonstrating coexistence between Wi-Fi and incumbent users? Will come back with more on this later.

Consultation Question 10 Question 10: Do you intend to participate and provide technical material into the ITU and CEPT work? In what way? We are planning better coordination of the RLAN community, commensurate with the size of the industry and the greater Wi-Fi ecosystem.

Consultation Other We can also answer questions Ofcom has not asked