Source: Boniface, Duane “Risk-Based Decision Making

Slides:



Advertisements
Similar presentations
© Nigel Slack and Michael Lewis 2003 Level 1 - Fit This chapter examines the third level of the operations strategy process – risk Level 2 - Sustainability.
Advertisements

University of Nebraska  Lincoln R School of Natural Resources Breaking the Hydro-illogical Cycle: Are we making progress? Donald A. Wilhite, Director.
Coping with earthquakes and eruptions. This lesson, we’ll learn how to cope with earthquakes are eruptions – and why some countries find it harder than.
Margo Beth Crouppen Acquisitions Editor, Organizational Studies and Economics Stanford University Press.
Comprehensive Crisis Management with special emphasis on HUMAN-CAUSED CRISES HUMAN-CAUSED CRISES Ian I. Mitroff © 2006.
 Formed in individual or prospective customer’s minds, based on all of their impressions of the organization  Derives from how the organization interacts.
ROPES & GRAY LLP BOSTON NEW YORK PALO ALTO SAN FRANCISCO WASHINGTON, DC Preparing for Foreseeable Risks: Corporate and Contract Law Issues Presented by.
Crisis Management Chapter 12
By: Wei-Tsong Wang ( 王維聰 ) Ph.D., Information Science, College of Computing and Information, State University of New York at Albany.
Business Crisis and Continuity Management (BCCM) Class Session
Passenger Vessel Safety Specialist Paul Culver Seventh Coast Guard District.
NETSS Sources and Limitations of Data Sexually Transmitted Disease Surveillance 1998 Division of STD Prevention.
Thursday, January 23, :00 am – 11:30 am. Agenda  Cyber Security Center of Excellence  Project Phase  Implementation  Next Steps 2.
A First Step in Decision Support Tools for Humanitarian Assistance during Catastrophic Disasters: Modeling Hazard Generated Needs John R. Harrald Frank.
1 Advanced Engineering Risk Audit Instruments SYRAS & QMAS Bob Bea National Science Foundation RESIN PROJECT.
NeighborhoodScore Oceanside Waterfront Fisherman’s Row Meadowglen Sunnybrook Old Town Total.
Allan Lavell Ph.D. International Assessor Social Aspects of Risk and Disaster and Prospective Risk Management.
B2B Ethics, Crisis Management & Legal Considerations
How does California prepare for Earthquakes hazards? LO: To explain why people continue to live in earthquake zones To understand how natural hazards can.
Lecture 13 CRISIS PHASES 1. The 6 Phases of CM Signal Detection SDM’s for: Any Crises? Build on Existing Data Bases? Integrated? Types of Signals, Noise?
Dec New Delhi Murat Sungur BURSA Former Director Prime Ministry-PIU Republic of Turkey FROM RECONSTRUCTION TO MITIGATION Turkey’s Experience in.
I can add multi-digit numbers using an open number line. Graphics:
VTRA CASE B: DRIFT ROUNDING RESULTS Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington GWU Personnel: Dr. Jack.
VTRA UPDATE: AGGREGATED B-N-H-O BP PERSISTENT OIL OUTFLOW COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington.
How does California prepare for Earthquakes hazards?
VTRA UPDATE: AGGREGATED B-H-I IV NON- PERS. OIL OUTFLOW COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington.
How does California prepare for Earthquakes hazards? LO: To understand how natural hazards can be managed.
OAS Secretariat for Multidimensional Security CICTE Secretariat Disasters and Critical Infrastructure Protection.
VTRA UPDATE: AGGREGATED A-B-C BP NON- PERS. OIL OUTFLOW COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington.
10-Step Approach to Disaster Readiness Dan Wilson Coordinator for the National Network of Libraries of Medicine (NN/LM) Emergency Preparedness & Response.
Incident Response Christian Seifert IMT st October 2007.
Preparation of Drought Vulnerability Assessment Study to Develop Iraq National Framework for Integrated Drought Risk Management (DRM) PAVING THE WAY FOR.
IT 244 Week 8 DQ 5 To purchase this material link 244-Week-8-DQ-5 For more courses visit our website
LLG 2: GALIT COHEN, ANDREA WRIGHT, ELIZABETH UPHAM
Figure 3: TSN Analysis Methodology
Assessment Essentials: Engaging a New Audience
DISASTER MANAGEMENT – WITH SPECIAL EMPHASIS ON EARTHQUAKE
VTRA UPDATE: AGGREGATED B-F-G BP PERSISTENT OIL OUTFLOW COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington.
VTRA UPDATE: AGGREGATED B-F-G BP NON- PERS
Moving Companies in VA Moving Companies in Washington DC.
Global Comparison of Light-Duty Vehicle Fuel Economy/GHG Emissions Standards Update: August 2013.
The Time Matrix.
Earthquake Mitigation
What to do when students complain about their advisor: Best practices for handling student complaints 2015 NACADA Annual Conference Session: 206 Room:
مبررات إدخال الحاسوب في رياض الأطفال
VTRA UPDATE: AGGREGATED B-H-I IV PERSISTENT OIL OUTFLOW COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington.
VTRA UPDATE: AGGREGATED B-H-I ACCIDENT FREQUENCY COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington.
VTRA UPDATE: AGGREGATED B-F-G TOTAL OIL OUTFLOW COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington.
VTRA UPDATE: AGGREGATED B-H-I TOTAL OIL OUTFLOW COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington.
VTRA CASE B: BP CHERRY POINT TRAFFIC DENSITY Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington GWU Personnel:
VTRA UPDATE: AGGREGATED B-H-I BP PERSISTENT OIL OUTFLOW COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington.
VTRA UPDATE: AGGREGATED B-H-I BP NON- PERS
VTRA UPDATE: AGGREGATED B-F-G IV PERSISTENT OIL OUTFLOW COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington.
JoAnn Harris-Bowlsbey, Ed.D.
VTRA UPDATE: AGGREGATED B-F-G IV NON- PERS
VTRA UPDATE: AGGREGATED B-F-G ACCIDENT FREQUENCY COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington.
21twelveinteractive.com/ twitter.com/21twelveI/ facebook.com/21twelveinteractive/ linkedin.com/company/21twelve-interactive/ pinterest.com/21twelveinteractive/
VTRA UPDATE: AGGREGATED B-F-G INTERACTION COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington GWU Personnel:
Christine Flamand INTACT
Reading: ‘Washington, DC’
Getting to the “Why” Mindset, Motivation, and Student Learning
VTRA UPDATE: AGGREGATED B-D-E INTERACTION COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington GWU Personnel:
CRISIS EVENT Risk Assessment Crisis Management and Business Continuity
VTRA UPDATE: AGGREGATED B-D-E IV PERSISTENT OIL OUTFLOW COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington.
VTRA UPDATE: AGGREGATED B-D-E ACCIDENT FREQUENCY COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington.
VTRA UPDATE: AGGREGATED B-D-E IV NON- PERS
Quality Improvement in Gastroenterology Clinical Practice
VTRA UPDATE: AGGREGATED B-D-E TOTAL OIL OUTFLOW COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington.
VTRA UPDATE: AGGREGATED B-D-E BP PERSISTENT OIL OUTFLOW COMPARISON Assessment of Oil Spill Risk due to Vessel Traffic Docking at Cherry Point (BP), Washington.
VTRA UPDATE: AGGREGATED B-D-E BP NON- PERS
Presentation transcript:

Source: Boniface, Duane. 1997. “Risk-Based Decision Making Source: Boniface, Duane. 1997. “Risk-Based Decision Making.” Risk-Based Decision Making & G-M Business Plan Goals. Washington, DC.

Source: Boniface, Duane. 1997. “Risk-Based Decision Making Source: Boniface, Duane. 1997. “Risk-Based Decision Making.” Risk–Based Decision Making & G-M Business plan Goals. Washington, DC.

From Harrald and Grabowski (1998) “Risk Mitigation in Passenger Vessel Operations.”

From Harrald and Grabowski (1998) “Risk Mitigation in Passenger Vessel Operations.”

From Harrald and Grabowski (1998) “Risk Mitigation in Passenger Vessel Operations.”

From Harrald and Grabowski (1998) “Risk Mitigation in Passenger Vessel Operations.”

From Harrald and Grabowski (1998) “Risk Mitigation in Passenger Vessel Operations.”

From Harrald and Grabowski (1998) “Risk Mitigation in Passenger Vessel Operations.”

From Harrald and Grabowski (1998) “Risk Mitigation in Passenger Vessel Operations.”

PROACTIVE, REACTIVE AND INTERACTIVE CRISIS MANAGEMENT Proactive crisis management Crisis Reactive crisis management Containment/ Signal Preparation/ Damage Recovery detection prevention Limitation Learning Interactive crisis management Source: Pauchant, Thierry C., and Mitroff, Ian I. 1992. Transforming the Crisis-Prone Organization. San Francisco: Jossey-Bass Publishers.