Al-Azawi, Anas Fahad Berdova, Maria Jannatul, Susoma Mutanen, Ilkka Key Issues In Purchasing DRIE system.

Slides:



Advertisements
Similar presentations
Managing Hardware and Software Assets
Advertisements

ITRS Factory Integation TWG
Public B2B Exchanges and Support Services
Design Constraints For Engineering Projects
What is TDL? Foundations of TDL. What is TDL T = Transportation D = Distribution L = Logistics WHAT IS IT MEAN? –A TDL Overview: The planning, management,
Gas Detection Strategies Overview of Selection Criteria for Gas Detection Systems.
The new way to train installers Fireplace Installer Training System Click to advance. Hit ESC to end show, or right click to navigate to a certain slide.
Global Supply Chain Procurement and Distribution
Michael R. Solomon Greg W. Marshall Elnora W. Stuart
Al-Azawi, Anas Fahad Berdova, Maria Jannatul, Susoma Mutanen, Ilkka Key Issues In Purchasing DRIE system.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
VYKON Tenant Billing Service
Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004.
What’s behind the amazing light show and the booming wall of sound? Energy. Energy is all around us but have you ever considered a career in energy?
Ahmed Mohammed Bostan The Value Chain Analysis Miss: Yassmen Al- Bubo.
Cloud Software Corporate System for Trucking Logistics
1983 – 1986 BSc. Mechanical Engineering + MBA 1983 – 1986 BSc. Mechanical Engineering + MBA Air Products – Speciality Gases Sales and Engineering.
SAYCO, the most successful and fastest-growing illuminated sign manufacturing company in Mexico We focus on providing distinctive solutions of only the.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
DRIE equipment purchase Final steps Mikko Kataja, Ville Liimatainen, Mohammadrez Soleymaniha, Sasha Hoshian.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
CENTRAL GAS SYSTEMS Without reference, identify principles relating to central gas systems as they pertain to facility and equipment interface with at.
ENGR 4196 – Senior Design I Question: What is a quantitative design constraint? Objectives: Definitions Functional Constraints Non-Functional Constraints.
Production visibility: KPI’s in Real-time BASF – The Chemical Company
From Research Prototype to Production
Information Systems Chapter 10 – Computers: Understanding Technology, 3 rd edition 1November 13, 2008.
Gasngo Delivering Fuel Control Premarket technical survey.
January 17, Dojo. Copyright © 2015 Open Source ERP Users Group All Rights Reserved. 2 Table of Contents 1.Setting Up OpenERP 2.Starting Your.
GCE AS in Applied ICT Unit 2 How organisations use ICT 2. Functions within Organisations Tom Robinson
Alternative Source for Nominal 20 K Refrigeration At the MTA Barry Norris, Arkadiy Klebaner September 17, 2004.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
McGraw-Hill© 2004 The McGraw-Hill Companies, Inc. All rights reserved.
Austin Frazer Eileen Kobal Ana Maria Maldonado Marie Rohrbaugh Moog Gas Evacuation Systems Design Review.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Procurement Part Two Marketing Logistics Purchasing Decision Variables: How to Rate Suppliers.
Tylon Chaney Supply Management-General Procurement.
T.E.A.M. PROGRAM ©Copyright 2012 DESCO INDUSTRIES INC. Total ESD Awareness and Management.
Reliability & Maintainability Engineering An Introduction Robert Brown Electrical & Computer Engineering Worcester Polytechnic Institute.
1 Open Systems Defined. 2 Some Definitions Open device - a control device with local intelligence which leverages the use of a standard, common protocol.
ESTABLISHING A MANUFACTURING ENTERPRISE Can you create and run a manufacturing enterprise?
© 2011 Pearson Education, Inc. publishing as Prentice Hall Figure 11.1.
Objectives of My Presentation Who we are? CISA S.p.A. is an Italian Company based in Pomezia ( Rome) Italy established in 1946 We are manufacturer, supplier.
Career Clusters & Pathways. Career Cluster Definition: A Career Cluster is a grouping of occupations and broad industries based on commonalities. The.
Introduction to Energy Management Doty, Steve & Turner, Wayne. (2009). Energy Management Handbook. Lilburn, GA: The Fairmount Press. Jacobsen, J. (2011).
The European Gateway to TANKSAT The Ultimate Service for LPG Tank Telemetry MCS Europe Group Solutions.
© 2012 Delmar, Cengage Learning Chapter 11 Engineering Controls.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Are you looking for an opportunity to join a company that has a long history and an exciting future? A place where you can grow within an international.
2010 Global Forecasting Conference National Tooling & Machining Association.
Studio 5. Need Analysis SPRING 2016 GE105 Introduction to Engineering Design College of Engineering King Saud University.
“The Future of Your Business”. De La Salle Corporate Internship Program Goals:  Have students work to help cover the cost of their education Find jobs.
Total control software for Breton fabshop equipment.
CONTACT US : Magnific training INDIA : USA:
1 Product Development Process Requirements Definition (Chap. 3) Conceptual Design (Chap. 3 and 4) Detailed Design (Chap. 5) Manufacturing (Chap. 7) Logistics,
Equipment and technological processes for manufacturing GaAs MMICs THE PRACTICALITIES OF BUYING AND USING PROCESSING EQUIPMENT TALK 15 1.
Connect Collaborate Innovate End to end video solutions.
Materials & Logistics Management
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
Corial 200R 11/17/2018 Simplicity, performance, and upgradability in a system designed for R&D environments RIE capabilities over a variety of materials.
Si DRIE APPLICATION In Corial 210IL.
Anisotropic RIE etching supported by a wide range of processes
DRIE APPLICATIONS In Corial 210IL.
Key Account Teams The road to success
Selling IIoT Solutions to Systems Integrators
Career Cluster Manufacturing.
Simple-to-use, manually-loaded batch RIE system
Design Constraints For Engineering Projects
Presentation transcript:

Al-Azawi, Anas Fahad Berdova, Maria Jannatul, Susoma Mutanen, Ilkka Key Issues In Purchasing DRIE system

Conduct active interdisciplinary research - Choosing the device Foundation of innovation and research Aalto/VTT DRIE system from a reliable supplier that demonstrate the ability to supply, implemet and provide continued customer service. LAM, Oxford, STS,... Applications: Type of devices to be manufactured Relevant tools to be purchased Main Goal Initial Phase : 1. week – 2. week

Conduct active interdisciplinary research - Choosing the device Main Goal Initial Phase : 2. week – 3. week Logistics Technical - Licenses -Allowence to disclose technical information through publication -Price -Cost of ownership -Delivery -Involving Aalto/VTT stuff and assigning jobs -Asking for quotation -Financial department -Contract -Cryo or Bosch -Aspect ratio -Selectivity to PR -Etech rates -Sidewall rouhness -Interface and simplicity of usage -Wafer size -Multiple wafer chuck -Vacuum degree and pump specification -Robotic arm -MFCs -Metal compatibilty in the chamber -Alarms -Pumping time -Load lock

Conduct active interdisciplinary research - Infrastructures Main Goal Intermediate Phase : 4. week – 12. week Logistics Technical - Facilitating the placement of the device ( arraging a room for the device to be placed ) -Gases -Gas Alarms - Suppliers -Gas lines maintenance -Collaboraters and industrial partners -Laywers - Signing the contract -Transportation to the final destination -Gas pipes installation -Gases ( Cl2, CF4, SF6, He, N2, Ar) - Waste handling (toxicity) -Waterline -Liquid nitrogen -Preperation for the treatment of the exhaust gases

Conduct active interdisciplinary research - Installing and testing the device Main Goal Advanced Phase : 13. week – 24. week Logistics Technical - Software(PC ) -Micronova - Clean room engineer -Main users ( Viktor,Yukka); their connection with the supplier company and their duties after installation -Gas pipes installation -Cooling pipes maintenance - Maintenance interval -Repair/ maintenance -Cost of a single process while the system is running -Amount of users -Know how/ Experience using RIE -Training of the users and generating licenses -Peso and Lims -Safety manuals -Test runs -Gases ( Cl2, C4F8, SF6, He, N2,Ar) -Impurity level -Gas level detection - Only Si ( What is the possiblity of III –V materials) -Compability -Chuck( cleaning and spareparts) - Micro controllers - Helium (leakage rate) - From Flourine to chloride mode - How to change from 4 to 2 - Alarm test