Conventional & Experimental Facilities Dept.

Slides:



Advertisements
Similar presentations
MAINTENANCE PLANNING AND SCHEDULING
Advertisements

Job Loss Analysis Overview
Supervision and Administration
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Richard Hislop FAC April 20-21, 2006 CONSTRUCTION SAFETY Richard Hislop LCLS Construction Safety Coordinator.
Safety Oversight for SLAC Accelerator Department Operations
Work Planning & Control Process Overview Dept Heads December 08.
Richard Hislop FAC October Construction Safety Richard Hislop.
DOC ID © Chevron 2005 Gulf of Mexico Permit to Work (PTW) KnowledgePlanet Awareness & Quiz March 2008.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – September 2012 eere.energy.gov In-Progress Monitoring and Inspecting QUALITY CONTROL INSPECTOR.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Host Agency Safety Consultation What the law says you must do.
19 Hospitality Management. 19 Hospitality Management.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
Presentation on Preventive Maintenance
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
HSS Inspection of Environment, Safety, and Health Programs at BNL Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
Order Management Redesign Start up Implementation Team Member Meeting November 3, 2005.
Independent Oversight Status Report on Workplace Exposure Monitoring ISM Workshop 2007.
NEW TANK REPAIR PRODUCTS INSPECTION COATING Global AST Solutions Provider Since Personal Safety Awareness Initiative.
FACILITIES SERVICES NEW EMPLOYEE ORIENTATION. FUNCTION OF FACILITIES SERVICES  Facilities Services has 55 full time employees who are responsible for.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Town of Watertown Staffing and Operational Assessment of the Public Works Department September 10, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
WSP-ATR Submission.
Job Analysis & Reporting
LCLS-II ES&H Requirements: Subcontractors
Roofer Falls 19 Feet from Roof
2017 Measure X First Quarterly Meeting
Inspector's Role and Responsibilities
Maintenance Scheduling
INSPECTION POLICIES AND, PROCEDURES CLASS A CERTIFICATION REQUIREMNTS
Accelerator Operations Department Readiness (Part 2)
Inspector's Role and Responsibilities
Small Sites Planning & Scheduling
Systems Implementation,
Safety Management - NOAO-AURA-LSST Base Facility Addition
Inspector's Role and Responsibilities
Temporary Works Co-ordination
MAINTENANCE PLANNING AND SCHEDULING
ISO 9001 Awareness Training.
Management of Change Report Errors to Management.
AGA – OQ & Training Best Practices Roundtable
INDUSTRIAL FIREPROOFING Evaluation Services
Roles and Responsibilities COC & District
Scheduling Gas Maintenance & Construction Resources AGA Workshop – Resource Management & Work Forecasting Artie Georgacopoulos Director - Resource Planning.
Meeting of the LCLS Facilities Advisory Committee
Chemical Purchasing.
Safety Self-Inspections
CONVENTIONAL FACILITIES STATUS
M. Scharfenstein - ES&H Coordinator 14 May 2009
AS 9100 Awareness Training.
Handout 9: Organisational policies and procedures
Final Design Authorization
Ian Evans SSRL Safety Office
WHAT IT TAKES TO BE A QUALIFIED SUBCONTRACTOR
Integrated Safety and Environmental Management
CONVENTIONAL FACILITIES
Richard Hislop Construction Safety Coordinator
DOE Review of the LCLS Project October 2006
Department Of Energy Review Linac Coherent Light Source Project
Safety toolbox Johnnie Stanton-MECA
Safety Program for LCLS Experiments
CF Scope, Management & Organization
Construction Management Services April 16, 2018
Presentation transcript:

Conventional & Experimental Facilities Dept. Safety Impacts from the Careful Planning of Facility and Maintenance Projects J. G.  Weisend II, B. Skaggs, H. Dao, B. Romero, L. Robinson, G. Kuraitis, P. Budrunas, T. Sherry. R. Jones, B. Youngman Conventional & Experimental Facilities Dept. SLAC 2/24/2019 J. G. Weisend II

Why Do We Need to Plan? Proper Planning: Allows safety to be built in from the beginning Ensures that the project meets the customer’s requirements Prevents the need for rework Allows the project to tie into long term plans for the site Maximizes use of limited resources 2/24/2019 J. G. Weisend II

Proper Planning Helps Avoid 2/24/2019 J. G. Weisend II

Aspects of Project Planning at SLAC CEF Assignment of a project manager (GP2) Development with customer of requirements, cost and schedule (CF1) Engineering, hazard analysis & documentation (CF2) Technical & safety reviews (CF5) Acquire authorization to work in area (GP7) Perform work safely with proper oversight (CF4) Update documentation Hold post mortem (CF5) 2/24/2019 J. G. Weisend II

Types of Projects Conducted by SLAC CEF Routine Maintenance Fix existing systems, preventative maintenance or replace like for like Generally requires no engineering or documentation updates Done by in house staff Construction Projects Major jobs Requires the most review and planning Done by subcontractors 2/24/2019 J. G. Weisend II

Types of Projects Conducted by SLAC CEF Minor Construction Projects Small jobs that add something new or significantly change existing systems Done by in house staff Frequently require engineering Require technical & safety reviews Require documentation updates Can cause trouble if not properly planned and managed 2/24/2019 J. G. Weisend II

Routine Maintenance Jobs are assigned via service desk system and shop supervisor All tasks are covered by the employee’s routine JHAM or by a non routine JHAM Permission to work in various areas is granted by area or building managers Safety oversight is provided by supervisor, CEF safety officers or ES&H staff Feedback is given to supervisors at the end of the job as needed. Customers also have an opportunity to provide feedback 2/24/2019 J. G. Weisend II

Construction Projects Requires all aspects of project management including formal reviews and complete documentation Project managers are responsible for successful and safe completion of the job University Technical Representatives work for PM and assist in providing both safety & technical oversight of subcontractors Additional safety oversight provided by citizen committee reviews, ES&H department and various SLAC safety officers Status of projects is managed & documented via project sheets SLAC doesn’t act as its own general contractor 2/24/2019 J. G. Weisend II

PROJECT SHEET 2/24/2019 J. G. Weisend II

2/24/2019 J. G. Weisend II

Minor Construction A single project manager (G. Kuraitis) has been designated for all CEF minor construction Project manager is responsible for ensuring that all engineering, safety signoffs, documentation and post mortems are done and that job is completed to the satisfaction of the customer Weekly meetings are held with CEF Dept. Head to review status of these projects Work is managed & documented via the Minor Construction Form 2/24/2019 J. G. Weisend II

2/24/2019 J. G. Weisend II * Added Tom Sherry as final safety signature 3/9/05 Supervisor of workers _________Liam Robinson______________________ Work completed on ______3/3/05_____________________________ List updated documentation There was no documentation needed for this.  We met at the  jobsite and did the design sketch in the field. Post Mortem Completed on __Friday, March 18, 2005_______ Had to schedule shutdown to install.  This required work to be done on OT.  In the future a discussion should be done with the building manager before planning out the fix as there are unknown operational requirements that must be considered. This deficiency was discovered during a repair of the fan wheel and the fan was on the ground so it could be viewed. The job was straight forward after discussions on the requirements. Attach all relevant safety documentation (JHAMS, EWPs, Excavation Permits etc), minutes of design review and post mortem Standard JHAM is on file with Marvin Jones and Norman Yeung.

2/24/2019 J. G. Weisend II * Added Tom Sherry as final safety signature 3/9/05 Supervisor of workers _________Liam Robinson______________________ Work completed on ______3/3/05_____________________________ List updated documentation There was no documentation needed for this.  We met at the  jobsite and did the design sketch in the field. Post Mortem Completed on __Friday, March 18, 2005_______ Had to schedule shutdown to install.  This required work to be done on OT.  In the future a discussion should be done with the building manager before planning out the fix as there are unknown operational requirements that must be considered. This deficiency was discovered during a repair of the fan wheel and the fan was on the ground so it could be viewed. The job was straight forward after discussions on the requirements. Attach all relevant safety documentation (JHAMS, EWPs, Excavation Permits etc), minutes of design review and post mortem Standard JHAM is on file with Marvin Jones and Norman Yeung.

Summary All facility & maintenance projects require proper planning to ensure safety & performance Midsized maintenance jobs can pose particular problems SLAC/CEF has developed protocols to ensure that all jobs are properly planned, reviewed and documented 2/24/2019 J. G. Weisend II

Summary Since its inception in 12/04, CEF has managed several hundred routine maintenance jobs, 8 minor construction jobs and 3 construction projects. Several large construction projects will start in the next 6 months. The rate will be limited by available staffing. Complacency is our enemy. We must continually monitor our work and adjust our systems as needed. ISMS is becoming a fundamental part of how CEF operates. 2/24/2019 J. G. Weisend II