Gep/SANE this week – quick overview

Slides:



Advertisements
Similar presentations
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
Advertisements

UK Costs Beam & Infrastructure Coils Tracking Detector.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
2014 DVCS Run Preparations DVCS and GMP Symbiosis Charles Hyde.
Draft HPS Run Plan March 30, Next Steps Beamline Setup Trigger Commissioning Beam Stability Studies SVT Commissioning Data Taking Checking the.
Thia Keppel 9/24/12. Accelerator schedule excerpts (Arne Freyberger) Accelerator Run II: Beam in hall 3/2014, or maybe as early as 1/2014 (?) > 1.1 GeV/pass,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
Thomas Jefferson National Accelerator Facility Hall C Commissioning: The Past (1996) First Exp: “by consensus” What Hampton Univ. wanted What ANL wanted.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Møller Polarimeter Status Update 1.Møller hardware status (detectors and targets) 2.Systematics for SANE 3.Plan Dave Gaskell SANE Collaboration Meeting.
X>2 & SRC May 3rd – May 10th, 2011 Xiaohui Zhan Argonne National Lab.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
Run Coordinator Report February 5 to 8 Stepan Stepanyan JLAB 1.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
Spin Precession At CEBAF
Resolution Studies of the CMS ECAL in the 2003 Test Beam
Days of the week NEXT.
Days of the Week Les docs d’Estelle –
DAYS OF THE WEEK.
G0 Accelerator Planning Meeting (11/1/05)
Spelling this week!
Time management School of Rock.
Dot Plots Name: _____________________________
A Class Calendar in PowerPoint
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
Sunday Monday Tuesday Wednesday Sunday Monday Tuesday Wednesday
Overview of Alignment Engineering Group Downtime Activities
Located on the first floor of Nitschke Hall Room 1010
Overview of Alignment Engineering Group Downtime Activities
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
MY FUNDAY.
Summer Program Information
Several Ad-Supported TV Shows & Sports “Own” Specific
Days of the Week Monday Tuesday Wednesday Friday Thursday Saturday
Unit 1: Quick Quizzes After 5,13
SEPTEMBER 2014 Unit 1 Unit 1 Unit 1 Unit 1 Quick Quiz 9,16, 21 Unit 1
Library Orientation Ivy Huang 2018/02/23.
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
Summer Program Information Your Name
Extended Christmas Hours Thursday December 8th 9am -6:30pm Friday December 9th 9am -6:30pm Saturday December 10th 9am-6pm Thursday December.
| January Sunday Monday Tuesday Wednesday Thursday Friday
At Least Two-Thirds Of The Top 10 Trending Topics
Time 1.
Contact
Approaching standards
Week of March 17-21, 2014 Warm-ups.
Week of February 3-7, 2014 Warm-ups.
NOVEMBER READING LOG Student: When you have read, record your minutes and have your parent initial the proper box (each day). At the end of the month,
Week of March 24-28, 2014 Warm-ups.
Week of February 10-14, 2014 Warm-ups.
DECEMBER READING LOG Student: When you have read, record your minutes and have your parent initial the proper box (each day). At the end of the month,
WEEK 1 Monday Tuesday Wednesday Thursday Friday Saturday Sunday
Children and Young People Clinics (CYP)
What is μ-e Conversion ? μ μ-+(A,Z)→e-+(A,Z) muon decay in orbit
2011年 5月 2011年 6月 2011年 7月 2011年 8月 Sunday Monday Tuesday Wednesday
My reflections on the events of Holy Week
March 2008 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1
Tax Free MEMorial day savings

BOOKINGS – Monday, 2nd July BAYWAVE
Mr. Butler 6th Grade Earth Science
January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31
Open Bowling Times 9:30 pm – 12 Midnight Moonrock
Module 1 Week 1 Assignment
Presentation transcript:

Gep/SANE this week – quick overview Time Activities 3/31 – 4/2 SANE tests Beam centering Detector checkout 4/2 Energy change 3 pass More SANE detector studies GEp optics runs 4/3 GEp3 running – beam energy TBD Currently: E=5.717 GeV, 5 pass Polarization ~80% (expected)

Gep/SANE this week – details Time Activities Friday Complete tracker installation Trigger work Target cooldown - successful Hall C readiness checklist Saturday, Sunday Additional detector and software work and wait for beam Monday Beam centering Detector checkout

Beam centering studies Carbon hole at x=0.7mm, y=+2.0mm Centering with dummy target gives x~0.0mm