Load Shedding Principles

Slides:



Advertisements
Similar presentations
NAESB Coordinate Interchange
Advertisements

FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
Dr Chris Boomer Development Plans Manager (DoE Northern Ireland)
Water for Economic Growth Global Water Summit Paris, France 7- 8 April, 2014 Usha Rao-Monari CEO, Global Water Development Partners.
FRANCOIS BOTHA – ZS6BUU. THE VARIOUS STADIA  JOHANNESBURG – SOCCER CITY & ELLIS PARK  NELSPRUIT – THE MBOMBELA STADIUM  RUSTENBURG – ROYAL BAFOKENG.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
Soccer World Cup Feedback from the 2010 Electricity Supply Industry Forum 15 October 2007 Dr Clinton Carter-Brown Eskom & Chairperson 2010 ESI forum.
11 POLOKWANE 2010 FIFA SOCCER WORLD CUP ELECTRICITY SUPPLY OPERATIONAL PLAN 2010 ESI Forum - 8 April 2010.
Economic Research Southern Africa Infrastructure Workshop May World Cup: Infrastructure Challenges National Treasury.
DRAFT Request for Initiation of a NAESB Standard NAESB OS Oct 23-24, 2013 Richmond, VA.
Operation Thekgo - Principals Driving Total System Reliability & Capacity AMUE Convention 16 October 2007 Greg Tosen.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Eskom 2010MW Project: Closeout report S.Bhana 18 August 2010.
Demand Response Products. Discussion Points 1.Setting the scene….. 2.Virtual Power Station 3.Reserves deployment order 4.Demand Response Products.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
World Cup Readiness Presentation to the Joint Committee 19 May 2010.
TRANSPORT OPERATIONAL PLANS FOR THE FIFA 2010 World Cup TM 18 MAY 2010.
Air Transport Air Transport
1 1 Xolani Lembede 2010 ESI Forum Meeting 08 April 2010.
Central Florida Coordination Area South Florida, St. Johns River and Southwest Florida Water Management Districts.
2010ESI feedback…eThekwini 08 April /12/082 Moses Mabhida Stadium Stadium completed…hosted several events – Semi-final between Chiefs & Pirates.
2010 FIFA World Cup South Africa RUSTENBURG ESI Feedback 8 April 2010.
ERCOT Generation Drought Best Practices Workshop Water Conservation Practices for Texas Generators February 27, 2012.
Municipal involvement in the energy crisis Select Committee on Labour & Public Enterprises.
1. PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATIONS Public Hearing on Division of Revenue Bill March
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
1 Select Committee on Economic Development Progress relating to the implementation of Integrated National Electrification Programme (INEP)
Preparedness Package for Refugee Emergencies 1 PPRE Part 2: Risk Analysis and Scenario-Based Planning.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
2010 FIFA WORLD CUP OPERATIONAL PLAN 5th November 2009 SARF 59th ANNUAL GENERAL MEETING AND SEMINAR Presented by Wonder Matshiga.
System Status Update February Overview Review of year to date demand and energy Review of recent system performance Outlook for summer 2012 What.
Xi’an Comprehensive Urban Transport Improvement Project.
Lecture (11): Water Distribution Systems
Customer Account Manager
Part 2: Risk Analysis and Scenario-Based Planning
The South African Transport System – Ready to move in 2010 ?
GENESYS Redevelopment Strawman Proposal
Chapter 4 Crafting a Strategy Screen graphics created by:
SECRET.
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
Customer Account Manager
UNICEF Social Protection Training Course
Supply Chain Partnerships
Natural Gas Infrastructure Assessment
UNHCR’s Suppliers conference
Part 1: The Preparedness Package for Refugee Emergencies (PPRE)
Aim of Economic Development
NRS Ed.1: 2010 National Code of Practice: Emergency Load Reduction and System Restoration Practices (prepared on behalf of the NRS 048.
INAC Water and Wastewater: Discussion on Current Policies and Processes Presented at: Circuit Rider Trainer Professional Association’s Annual General Meeting.
Flooding Walkdown Guidance
December 4, 2017 | Melia Nassau Beach | Valentino A. Hanna
Quality Management Systems – Requirements
Audit Plan Michelangelo Collura, Folake Stella Alabede, Felice Walden, Matthew Zimmerman.
Fishermans Bend Draft Framework Transport Recommendations
MIT tour of the California ISO Control Center March 31, 2015
Chapter 5 Network Design in the Supply Chain
GIS Initiative 2010 ESI forum
Continuity Guidance Circular Webinar
How to balance skills demand with capacity, in a volatile multi-project environment Barry Muir Managing Director.
SOUTH AFRICAN INSURANCE ASSOCIATION
Oregon Fuel Action Plan
Transportation Services
How to balance skills demand with capacity, in a volatile multi-project environment Barry Muir Managing Director.
MUNICIPAL ENERGY EFFICIENCY PROGRAMMES MEETING OF THE SELECT COMMITTEE ON ECONOMIC DEVELOPMENT, 7 AUGUST 2012 Linda Manyuchi Technical Specialist: Energy.
A Focus on Strategic vs. Tactical Action for Boards
Progress report on the roll out of GIAMA
Tom Welch October 18, 2002 Boston, Massachusetts
How to balance skills demand with capacity, in a volatile multi-project environment Barry Muir Managing Director.
NRS Ed.1: 2010 National Code of Practice: Emergency Load Reduction and System Restoration Practices CHECKLIST.
Contingency Plan for the March/April, 2006 possible power shortage
Presentation transcript:

Load Shedding Principles Geoffrey Francis 8 April 2010 2010 ESI

Load Shedding Principles The current outlook for the supply situation for the duration of the FWC is that there is adequate supply to meet demand and reserve requirements, considering normal, “planned for” generation availability. If plant failures occur significantly beyond this, and all other mitigation has been activated, the only remaining option is manual load shedding. It must be noted, that this will only be used as a last resort, and will be considered to be in an emergency state. Key Principles In order to reduce the likelihood of errors and confusion, one load shedding schedule is suggested for the duration of the FWC. This will serve as a tool to deal with supply demand imbalances as well as regional constraints should they arise. All role players will be required to load shed, according to existing regional allocations. Eskom will request the municipalities and host cities to shed load as is currently done, and it will be responsibility of the municipality to ensure critical load is protected or moved out of critical time periods.

Load Shedding Principles Key Principles (cont) 5. This implies that on any given day, including local match days, load shedding will still occur in the region. Load shedding schedules should be structured such that critical infrastructure is protected as follows: It is suggested that the following load be protected all the time: Stadia and immediate precincts Fan parks Major transport hubs (airports, Gautrain, park & Rides During appropriate time periods, the PVAs should be protected (At this time this specifically refers to the SABC PVAs). 6. It is the responsibility of the base camps to ensure they are adequately protected from the impact of load shedding. 7. If Eskom is the supplier, the Dx region should engage with the entity to ensure backup generation capacity exists.

Load Shedding Action items: 1) Dx regions to align schedules to ensure where Eskom supplies critical infrastructure it is protected as in point 5 above. (EDNO) Western, Eastern, Southern, Polokwane, Nelspruit (Done). Other sites due 9 April 2010. Central continuing with 4hr load blocks. 2) Dx to engage with Host Cities and other municipalities to obtain buy-in with the above principles. Only Rustenburg and Tshwane outstanding. Committed to 9 April 2010.