Alignment of Main Linac Cryomodule (MLC)

Slides:



Advertisements
Similar presentations
SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
EXPERIENCE FROM KEK Norihito Ohuchi 2009/11/9-101 Workshop on cryogenic and vacuum sectorisations of the SPL.
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Heat load study of cryomodule in STF
FNAL Meeting, July 2006 Basti, Bedeschi, Raffaelli, INFN-Pisa 1 ILC cryomodule mechanical work at INFN-Pisa  Ongoing work  Near term future  Manpower.
Stress and cool-down analysis of the cryomodule Yun He MLC external review October 03, 2012.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
Stress and Cool-down Analysis Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
Mechanical Design of Main Linac Cryomodule (MLC) Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Tim O’Connell, Ralf.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
Overview of Main Linac Cryomodule (MLC)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Overview of Main Linac Cryomodule (MLC) Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Ralf Eichhorn Cornell on behalf of Paul Bishop, Benjamin Bullock, Brian Clasby, Holly Conklin, Joe Conway, Brendan Elmore, Fumio Furuta, Andriy Ganshyn,
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
5K shield removal experiment in STF cryomodule Norihito Ohuchi 2008/11/181ILC08-GDE-Meeting (CHICAGO)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
LINAC 4 CCDTL Accelerating Structure SO SO Aluminum foil H = 0,3…0,5 mm Module of CCDTL Accelerating Structure.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain la Neuve 17-18/04/2013 Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain.
The Evolving ILC Project
ALIGNMENT OF THE NEW TRIPLETS
CERN – Zanon discussions
Stress and cool-down analysis of the cryomodule
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Sensors in the S1-G Cryomodules (Updated )
Optimum cryomodule length at the ESS
Summary of the checking items of the Module-C design
IHEP Cryomodule Status
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
Cryomodules Challenges for PERLE
CEPC-650MHz Cavity Cryomodule
CRYOMODULE FINAL ASSEMBLY
SNS PPU Cryomodule Vacuum Vessel
Magnetic shielding and thermal shielding
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Space Frame
CRYOMODULE FINAL ASSEMBLY
Presentation transcript:

Alignment of Main Linac Cryomodule (MLC) Yun HE MLC Internal Review 9/5/2012 Yun HE, MLC Internal Review

Yun HE, MLC Internal Review Outline Beamline support and alignment Alignment of beamline at room temperature Monitoring beamline position at cold Differential thermal contractions during cool-down 9/5/2012 Yun HE, MLC Internal Review

Beamline support and alignment HGRP determines longitudinal position Precision machined surfaces with central pin holes guarantee vertical/horizontal alignment Alignment pins provides horizontal alignment Alignment keys allow for differential thermal displacement of beamline components relative to HGRP Flexible support allows for differential thermal displacement of helium vessel relative to HGRP during cool-down/warm-up 9/5/2012 Yun HE, MLC Internal Review

Alignment of beamline at room temperature Level of posts can be adjusted via 4 rods Adjust post position using references on vacuum vessel end flange All interfaces are precision machined surfaces w/ tolerances <±0.001” Flat reference surfaces spaced 90° apart on vacuum vessel end flanges Two alignment pins 9/5/2012 Yun HE, MLC Internal Review

Monitoring beamline position at cold For prototype module only Mounted on end cap flanges (room temperature), thus the wire position is not influenced by cool-down Two sensors for 1st, 3rd, 5th cavities One sensor for each of the rest three cavities Sensors attached to end flange of cavity LHe vessel Heat treated CuBe wire (ɸ0.5 mm) is stretched parallel to the beam axis providing a position reference A WPM sensor consists of four striplines spaced 90° apart 9/5/2012 Yun HE, MLC Internal Review

Differential contraction between shield and HGRP during cool-down Sliding post Fixed post Sliding post Left/right posts can move relative to shield in Z axis during cool-down At room temperature, side post was offset to vac vessel port center Concentric to shield opening At cold, side post moved due to HGRP contraction, became concentric to vac vessel port center Slightly offset to shield opening center 9/5/2012 Yun HE, MLC Internal Review