CMS vacuum chamber. Geometry for wakefield calculations

Slides:



Advertisements
Similar presentations
EM Simulations for PETRA3
Advertisements

D. Lipka, MDI, DESY Hamburg; Temperature Simulation DCCT at PETRA III D. Lipka, MDI, DESY Hamburg.
June 14, 2007Pauli Kehayias1 Fast Ion Instability in CesrTA/ILC -Project extent –To study simulations of fast ion instability with CesrTA in mind -Progress.
S. N. “ Cavities for Super B-Factory” 1 of 38 Sasha Novokhatski SLAC, Stanford University Accelerator Session April 20, 2005 Low R/Q Cavities for Super.
Impedance of the TOTEM Roman Pots Nicola Minafra, Benoit Salvant, Nicolò Biancacci, …
The Compendium of formulae of kick factor. PLACET - ESA collimation simulation. Adina Toader School of Physics and Astronomy, University of Manchester.
Impedance of new ALICE beam pipe Benoit Salvant, Rainer Wanzenberg and Olga Zagorodnova Acknowledgments: Elias Metral, Nicolas Mounet, Mark Gallilee, Arturo.
Calculations of wakefields for the LHCb VeLo. Olga Zagorodnova Desy Hamburg April 29,
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
HOM loss calculation of IP chamber Nakano Hiroshi 7-Jul-2009 (presented by Hitoshi Yamamoto) Thanks to Tetsuo Abe and other experts.
Studies of impedance effects for a composite beam pipe for the experimental areas Request from M. Galilee, G. Schneider (TE/VSC)
Wakefields in XFEL undulator intersections Igor Zagorodnov Beam Dynamics Group Meeting
Calculations of wakefields for the LHCb VeLo. Olga Zagorodnova Desy Hamburg April 8,
Impedance of the TOTEM Roman Pots Nicola Minafra, Benoit Salvant, Nicolò Biancacci, …
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Similar Lengths (2) Geometry In each example, two similar models of the same shape are shown. Find the length of the unknown side. 135cm 115cm 86cm h.
First results of calculation of wakefields for the LHCb experimental chamber. Rainer Wanzenberg, Olga Zagorodnova Desy Hamburg February 2, 2015.
Trapped Modes in LHC Collimator (II) Liling Xiao Advanced Computations Department SLAC National Accelerator Laboratory.
Resistive Effects in XFEL Kicker Andranik Tsakanian XFEL Beam Dynamic Meeting 17 Dec 2007.
Coupler Short-Range Wakefield Kicks Karl Bane and Igor Zagorodnov Wake Fest 07, 11 December 2007 Thanks to M. Dohlus; and to Z. Li, and other participants.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
August 21st 2013 BE-ABP Bérengère Lüthi – Summer Student 2013
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Brief review of past studies on Wakefield ATF2 Proj. Mtg K.Kubo.
1 R&D Plans for Impedance Driven Single-Bunch Instabilities (WBS 2.2.1) M. Venturini ( presented by M. Zisman) LBNL LCWS07 DESY, Hamburg May 30 - June.
HWR, SSR1 and SSR2 transverse kick summary Paolo Berrutti, Vyacheslav Yakovlev.
Geometric Impedance of LHC Collimators O. Frasciello, S. Tomassini, M. Zobov LNF-INFN Frascati, Italy With contributions and help of N.Mounet (CERN), A.Grudiev.
Jonathan Smith, European LCW, 8 th January 2007, Daresbury 1 GdfidL Simulations of ESA Prototype Collimators Jonathan Smith (Lancaster University/Cockcroft.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
Resistive Effects in Ceramic Kicker Chamber. Roughness Effects in Undulator Chamber. Andranik Tsakanian, Uni Hamburg DESY, 16 April 2007.
Impedance & Instabilities
Calculate the Surface Area of a Cone and Sphere
Intensity dependence of Beam size at IP and Wakefield in ATF2
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
T. Agoh (KEK) Introduction CSR emitted in wiggler
Finemet cavity impedance studies
IPBPM test results at the LINAC end
Estimation of Wake Field, Heating in Modified Beam Pipe
Benoit Salvant, Kyrre Sjobak, Christine Vollinger, Na Wang
Baffle arrangement for LCGT
Heat load at the ILC positron target and collimator system
Undulator Tolerances for LCLS-II using SCUs
XFEL Beam Physics 10/30/2015 Tor Raubenheimer.
Update of CLIC accelerating structure design
E. Métral, N. Mounet and B. Salvant
Update of the impedance of new LHC experimental beam pipes
BC2 Commissioning Parameters
10-7 Volume of Pyramids and Cones
TCTP the CST side F. Caspers, H. Day, A. Grudiev, E. Metral, B. Salvant Acknowledgments: R. Assmann, A. Dallocchio, L. Gentini, C. Zannini Impedance Meeting.
Beam impedance of 63mm VM with unshielded Bellows
Igor Zagorodnov and Martin Dohlus
Magnetic gap calculation
Bunch Tiltmeter Steve Smith SLAC Snowmass July 16, 2001 Update date
Simulation of trapped modes in LHC collimator
Beam impedance of 63mm VM with unshielded Bellows
and their missing lengths
Areas and Volumes of Similar Solids
Simulation with Particle Studio
Design of Interaction Region
CINVESTAV – Campus Mérida Electron Cloud Effects in the LHC
HBP impedance calculations
Power loss in the LHC beam screen at 7 TeV due to the multi-layer longitudinal impedance N. Mounet and E. Métral Goal: Check the effect of the multi-layer.
Coherent Synchrotron Radiation Study
Area Surface Area Volume
Practice Geometry Practice
Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS July 11, 2007
Short-Range Wakes in Elliptical Pipe Geometry
Option 1: Reduced FF Quad Apertures
Igor Zagorodnov and Martin Dohlus
Presentation transcript:

CMS vacuum chamber. Geometry for wakefield calculations information from Bernhard Holzer, Daniel Pitzl, Benoit Salvant Rainer Wanzenberg DESY Hamburg, June 13, 2012

“old” geometry See: LHC Project Note 418, May 27, 2009 Radius 29 mm New Chamber - 22 mm

New geometry New smaller beam pipe Existing cone (orange) will be extended Z = 1948 mm  1450 mm

“old” geometry but shorter bunches RMS Bunch length 7.5 cm, see LHC Project Note 418, May 27, 2009 Loss parameter: Bunch length 4 cm: preliminary results ~ 45 V / nC (heating of components ?) ~ 4.5 V / pC m Kick parameter: