BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.

Slides:



Advertisements
Similar presentations
Click on this image to open the full PDF document.
Advertisements

Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
ATLAS Pixel Detector BCM Signal Cable October 13, 2005 E. Anderssen, LBNL.
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
1 G4MICE studies of PID transverse acceptance MICE video conference Rikard Sandström.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
HFT Geometry Considerations F.Videbæk BNL. Introduction This presentation is meant to be a living document, updated as more and better information becomes.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
ATLAS Pixel Detector July 2003 ETC ‘04 E. Anderssen LBNL BPSS and Service Panels Santa Cruz, CA E Anderssen LBNL.
PSB h- injection Layout issues –Are 3 or 4 KSW needed –Geometry of the injection –Element lengths and locations Element performance specifications H 0.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
W.O. Miller i T i VG 1 Example Barrel Structures- Disk Primary FEA of Disk Frame Supports FEA of Disk Frame Supports –Structure 2m long with two end plates.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Monte Carlo Comparison of RPCs and Liquid Scintillator R. Ray 5/14/04  RPCs with 1-dimensional readout (generated by RR) and liquid scintillator with.
Aug/16/05 Su DongSiD Vertexing: Snowmass 05 SiD trk+vtx1 SiD VXD Geometry Update Su Dong SLAC.
409 – Design changes, early 2012 Overview The following areas of the 409 design have been changed: 1)Chassis sideview from straight to curved 2)Front wheel.
Detector studies, Radiation Simulations, Organization FCC Hadron Detector Meeting July 27 th 2015 W. Riegler.
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Jin Huang Los Alamos National Lab.  Calorimeter defines the inner-R edge of large- angle acceptance  The proposal assumed a 2.5 degree polar angle gap.
LAV Software Status Emanuele Leonardi – Tommaso Spadaro Photon Veto WG meeting – 2015/03/24.
1st Nov 2001 Nigel Hessey SCT Endcap Structures FDR1 Endcap Requirements Brief overview of SCT Endcap Requirements layout, X0, thermal, positioning, stability.
Phase 1 FPIX cooling tubes routing in HC Kirk Arndt - Purdue124 April 2012.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
LHCC referee meeting L.Rossi - INFN / Genova CERN - March Status of insertable pixel  Layout in 2000 (Dubna layout)  Reasons for the change.
Pixel Upgrade Phase I CMS Upgrade Week 27. April 2010 R. Horisberger, PSI.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
Craft Pixel Data Study (II) JC Yun, 6/12/09 1) FPix: view from interaction point 2) FPix pseudo-rapidity coverage.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
ATLAS Pixel Detector Pixel Support Tube and Related November 9, 2001 Pixel Day E. Anderssen, LBNL.
M. Gilchriese - September 2000 Pixel Insertable Layouts September 2000.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
H.-G. Moser Max-Planck-Institut fuer Physik DEPFET Meeting Heidelberg Sept DEPFET Geometry for SuperBelle Sensor Geometry Pixel Pitch Constant/variable.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
STRAW TRACKER SYSTEM CAD STATUS :
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
Update of MVD services and requests
Beam
- CT INSTALLATION PROCEDURE OVERVIEW -
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
? ENDCAP: Mechanics IFIC-Valencia.
LumiCal mechanical design, integration with LDC and laser alignment
Analysis Test Beam Pixel TPC
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
Integration and IR Hall
Introduction to SolidWorks
Silvan Steuli Roland Horisberger Stefan König CMS Upgrade Workshop
Cryomodule Assembly Plan
Inner DET. Integration Inner detector envelope Radial clearances.
Presentation transcript:

BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie interactions with the Be beampipe section Showering from outside the TK volume Concerns for interference Subsystem 1: One as close as possible to BP Target = same radius as the inner layer of the pixel barrel Target = 8mm from beampipe at final position With no FPix squeeze dist= 14 mm With FPix squeeze dist =23mm Subsystem 2: At larger radius Not at risk of interfence with BP or FPix Support services Placement of frontend electronics and services must be adjusted once rail system agreed upon ( BCM treats this issue as secondary, although limited space between BCM rail and FPix service tube feet) Beam Pipe support wires Must respect envelop around wires. At present the BP group is requesting an envelop of R= 15mm

Concerns Lateral movement of FPix service cylinder toward beampipe “cuts off” space for BCM insertion Cabling FPix should done with FPix in final position and before beampipe hook up BCM and FPix should be independent system There should not be any holes in coverage of the FPix

The problem: BCM and FPix envelopes overlap at rear (z=~2 The problem: BCM and FPix envelopes overlap at rear (z=~2.6m) of FPix service tube

Possible “solution”: Very difficult Kinked BCM rail, straight rail after kink

Rotating hinged on the front foot =» outer edge move ~2.5 mm D = 166mm d=~2.5mm Question of gaps in coverage Rotating hinged on the front foot =» outer edge move ~2.5 mm

Full Squeeze

10mm Squeeze: 1st Layer

10mm Squeeze: 2nd layer

10mm Squeeze: 3rd Layer

Notes from Kurt The reason for the final rotation of the disk structure was of course to get the disk plane perpendicular to the beam. The advantage was also that from the rear face of the barrel service tube to the rear face of the disk cylinder there was some lateral room which facilitates the sorting of cables/pipes going to the patch panel PP0. No (or only partial) final rotation would on the other hand facilitate the mounting of the horizontal beam pipe suspension. No (or only partial) final rotation will of course complicate a lot the software describing the geometry (track reconstruction from hits, alignment....). Also one should check whether there is still overlap of the two half-disks of the most remote disk. My first guess is that it should be possible to omit the final rotation. It would imply a correction of the lengths of cables/pipes from the disk structure's end flange to PP0 which have been determined so far assuming full rotation. For a more educated guess, I should have a layout of the rear face of the disk cylinders as it is foreseen now, in particular the arrangement of cables/pipes exiting the rear end flange of the disk structure.

From Bruno

Comments on the FWD pixel track transversal movement in the rail slot of ~35 mm, hinged on front foot with a lever arm of 2209mm: