Good Design Practices Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.

Slides:



Advertisements
Similar presentations
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Advertisements

1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
UNIVERSITY of GLASGOW A Comprehensive Approach to ATM Incorporating Autonomous Aircraft ATM Research Group University of Glasgow.
Airspace Volumes and Sectorisation Good Design Practice Airspace Volumes and Sectorisation Good Design Practice 1.
Continuous Climb Operations ( CCO )
Overview of the PBN Airspace Implementation Processes
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Mediterranean Free Flight ASAS Separation and Spacing Presented by Andy Barff – Project Leader MFF Real-time Simulations ASAS-TN, Malmö
Practice Class Exercise SE Asia Enroute 1. PBN Implementation Processes 2.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
Procedure Design Considerations
Continuous Descent Operations ( CDO )
Enroute Design 1 Lead Instructor:
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session Erwin Lassooij ICAO PBN Programme Manager.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
Continuous Climb Operations (CCO) Saulo Da Silva
Temporal Variations in Demand West Fixes East Fixes.
Continuous Climb Operations ( CCO )
PBN Airspace Concept Workshop ReviewReview. Review of Workshop 2 ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan,
Practice Class Exercise CHINA Enroute 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Enroute Design 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Good Design Practices BEIJING, CHINA; 30 JUN-11 JUL 2014.
International Civil Aviation Organization Continuous Descent Operations (CDO) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
HUGHES PROPRIETARY NYC – Hamptons Southern Route.
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Users’ Perspective of PBN Achieving Improvements Joël Morin Head, ATM Harmonization.
Air Traffic Control System Team #3. Introduction The purpose of air-traffic control is to assure safe separation between en-route aircraft and the safe.
Study Continuous Climb Operations
The Professional Aspects of Mixed Mode for Runway Operations.
Chapter 6 Section A. STAR Standard Terminal Arrival Route –Depart the enroute structure –Navigate to destination –Terminate with an instrument approach.
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
RECITE A PRAYER…(15 SECONDS). ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL.
EUROCONTROL European Organisation for the Safety of Air Navigation.
Airspace 1 st LT Zouhar Jakub 12 th September 2014.
Arrival Charts and Procedures
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Terminal Airspace Traffic Complexity Fedja Netjasov University of Belgrade Faculty of Traffic and Transport Engineering Division of Airports and Air Traffic.
Overview of the PBN Airspace Implementation Processes
Vertical, lateral separations based on time / distance
PlaneWrong AGM Thursday 13th October
Users’ Perspective of PBN Achieving Improvements
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Industry Viewpoint – Block 0
Portland Tower/TRACON UAO Customer Briefing July 2010
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Continuous Climb Operations (CCO) Saulo Da Silva
Practice Class Exercise SE Asia Enroute
Hands-on Exercises Performance Based Planning and use of IFSET
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Descent Operations (CDO) Saulo Da Silva
PBN Airspace Concept Workshop
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Continuous Climb Operations (CCO) Saulo Da Silva
GAUTENG AIRSPACE PBN PLAN
Workshop on preparations for ANConf/12 − ASBU methodology
Pilot considerations and pilot solutions
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Continuous Climb Operations ( CCO )
Airspace Volumes and Sectorisation Good Design Practice
Continuous Climb Operations ( CCO )
PLAN for 8th PBN PD Course
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

Good Design Practices Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014

Learning Objectives By the end of this presentation you should understand: General good route design practices.

DESIGN CONSIDERATIONS Airspace Design starts with route design Design by facts Airport placement Terrain Optimum aircraft altitudes Facts drive LOA’s not the other way around Determine ideal crossing altitudes/points – routes Start with shortest routes – least time in sector Balance ATC intervention with distances required Consider links with conventional structure Remember RNAV/RNP aircraft may be vectored RNAV/RNP aircraft require less work RNAV/RNP routes increase safety Guaranteed containment Reduced radio transmissions

NAVAID Centric vs PBN Arpt Arpt

Good Design Practice Segregate Arrivals laterally and vertically from Departures

Cornerpost Concept Four CornerPost used for restructuring of ATS routes (SID, STAR) in many major airports; STARs directed to the four corners of the TMA and the SIDs exit at the midpoints of these routes. 6

Good Design Practice Generic CORNER-POST example: Flows by quadrant, segregate Arrivals laterally and vertically from Departures

Good Design Practice Segregate routes for entry and exit points 8

Good Design Practice CDO CCO Plan crossover distances for efficient vertical separation CDO CCO 9

Good Design Practice Fix the same Exit/Entry points for different RWY configurations Handoff between ACC and APP the same with different RWY configuration

Good Design Practice Gradually converge inbound flows to distribute workload 11

Good Design Practice Group similar performance flows 12

Good Design Practice Minimize Crossing Complexity

Good Design Practice Minimize Crossing Interaction ICAO Circular 319-AN/181

Good design practice Holding: Holding on exit fixes may block departing traffic Multiple merging at holding may be complex

Good design practice Holds Align Hold with exit track

Good design practice Segregate Missed Approach from Arrival Traffic

QUESTIONS? In the sample airspace exercise we will: Develop STARs/SIDs/HOLDs We will start with developing Routes Only Both teams present results and provide rationale

Thank You

VT BR BH RJ Area Circulation 2011 SP

VT BR BH RJ AREA CIRCULATION PBN RNAV 5 2012 SP