Presented by: Ruben Carcagno

Slides:



Advertisements
Similar presentations
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Advertisements

February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Current status Arkadiy Klebaner November 21, 2012
12 GeV Upgrade of Cryogenics at Jefferson Laboratory (Jlab) Dana Arenius Engineering Division Cryogenic Systems ILC08 Nov This work is supported.
An SRF Single Cavity Horizontal Test Facility Tom Peterson, Fermilab May 10, 2005.
US Cavities Status and Plan Mark Champion 01 October 2009.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
Fermilab Vertical Cavity Test Facility (VCTF) VTS2&3 Project Status Ruben Carcagno, Camille Ginsburg, and Cosmore Sylvester On behalf of the VTS Group.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
Vertical Test Stand in IB1 C.M. Ginsburg (Fermilab) for the IB1 VTS Group SRF R&D Meeting 6.July 2006.
ILCTA_IB1_VTS An in-ground vertical test facility for ILC SRF cavities at Fermilab Camille M. Ginsburg ILC SRF Technical Status Meeting 5.May 2006 for.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Test Lab Cryogenic Requirements Kirk Davis Director’s Review of Cryogenic Capacity 26 May, 2010.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
CMTF Cryogenics (status and plans) SRF program and AD/Cryogenics work presented by Arkadiy Klebaner May 21, 2013.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
LCLS-II Cryoplant Overview
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
February 13, 2007C.M. Ginsburg (Fermilab-TD)1 Fermilab Vertical Test Facility for ILC cavities Vertical Cavity Test Facility (VCTF) IB1 infrastructure.
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
Final Design Cryogenic and mechanical configurations
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
Preliminary Review of LERF as Cryomodule Testing Facility for LCLS-II
Mike Anerella December 17, 2013
FRIB Cryogenic Support
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
ILC - Upgrades Nick Walker – 100th meeting
Online Helium Inventory Monitoring of JLab Cryogenic Systems
Cryoplant Installation Scope
Progress and Issues with VTS Upgrade
Magnet Test Stands at Fermilab
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
ESS RF Development at Uppsala University
Status of the cryogenic system for B180
Change Request Panel report
Horizontal Tests in a Vertical Cryostat
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
Cost Optimization Models for SRF Linacs
Mathew C. Wright January 26, 2009
ILC Experimental Hall Cryogenics An Overview
ESR 2 Presented to Joint Hall A/C Summer Meeting
CTF Users’ Perspective
ESR2 Process Cycle Design
ESR2 Process Cycle Design
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

ILCTA_IB1 Infrastructure Analysis for multiple VTS (Preliminary – Work in Progress) Presented by: Ruben Carcagno Analysis team: Ruben Carcagno, Camille Ginsburg, Yuenian Huang, Arkadiy Klebaner, Joe Ozelis, Tom Peterson, Clark Reid, Cosmore Sylvester September 28, 2006

IB1 Infrastructure Analysis for Multiple VTS Motivation Cavity yield increase identified as a top ILC R&D priority (S0 goal) during 2007-2009 Requires large quantity of vertical test cycles (hundreds per year) to be performed in all three regions How many vertical test cycles can be supported in ILCTA_IB1? At what cost? Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

IB1 Infrastructure Analysis for Multiple VTS Single VTS Throughput The VTS under construction at ILCTA_IB1 can accommodate up to two ILC cavities per test cycle Expected to start operation in mid-2007 Throughput Assumptions: Single shift operation Cavity arrives hermetically sealed 120 °C bakeout done prior to IB1 delivery “Production” Q vs. E test only (e.g., no 8-hr pause at 100K during cooldown to determine degree of H contamination (Q-disease)) Two cavities in a VTS cryostat Only one RF ON cavity test at any given time Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

Unconstrained Test Cycle Schedule (Nearly) Unattended Operation ~ 28 hours Attended Operation ~ 11 hours TOTAL (unconstrained) ~ 39 hours Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

IB1 Infrastructure Analysis for Multiple VTS Adding Constraints Shift Operations 11 hours of attended operations require a minimum of 23 hours because of 12-hour pause between 8-hour shifts Inefficiencies (idle time due to shared resources, equipment availability, troubleshooting) Add ~ 24 hours Total Test Cycle ~ 75 hours or ~ 3.12 work days for two cavities. Assuming 8 work weeks of maintenance and other facility down time per year: Single VTS throughput ~ 70 Test Cycles per year, with up to two cavities per cycle (140 cavity tests) Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

How to (quickly) increase throughput? Two additional VTS stands can be added to the IB1 facility by relocating the ILCTA_IB1 Horizontal Test Stand (HTS) planned for FY07 to ILCTA_MDB. Throughput can increase to ~ 3x140 = 420 cavities per year by mid-2008 Some throughput increase might be possible by adding shifts and removing inefficiencies Substantial additional throughput increase only possible by building modifications and/or a building addition. Cryogenic capacity becomes a limiting factor (tie-in to CHL after Tevatron shutdown?) Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

Phased Approach for a Vertical Cavity Test Facility (VCTF) Phase I Complete VTS under construction by mid-2007 Phase II Add two more (nearly) identical VTS stands by mid-2008 Phase III Add one or more high-throughput VTS stands in a modified or new building addition with tie-in to the Central Helium Liquefier (after 2009 and the Tevatron Shutdown) Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

IB1 Infrastructure Analysis for Multiple VTS IB1 SRF Test Area Layout Vertical Test Area (FY06) (Bare Cavities) Existing Cryo Piping Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

IB1 Infrastructure Analysis for Multiple VTS IB1 Layout for Phase II Trench for cryo piping Door Radiation Lid “park” area Stairs Additional VTS Vertical Magnet Test Facility (VMTF) Staging Area VTS under construction Tie-in to test stands cryo distribution box Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

IB1 Infrastructure Considerations The IB1 Test Facility shares cryogenics and people with a very active Magnet Test Facility (MTF) It is essential to decouple cryogenic operations between MTF and the Vertical Cavity Test Facility (VCTF) There should be adequate cryogenic resources available to sustain both MTF and VCTF test programs. This includes both LHe inventory and pumping capacity for superfluid operation Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

Infrastructure Requirements Add a third vacuum pump to increase pumping capacity from 6 g/s at 20 Torr to at least 10 g/s Add a compressor/purifier at the outlet of the vacuum pump system to mitigate contamination risk Add more GHe storage capacity to store the entire LHe inventory as gas Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

Current Plan for single VTS integration to IB1 Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

Multiple VTS Integration to IB1 Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

IB1 Infrastructure Analysis for Multiple VTS How much pumping? For baseline E = 35 MV/m, Q0 = 1010 the power dissipation is: Substantial margin is needed to continuously operate at higher gradients and/or lower Q. Constraints: JT Heat Exchanger and Pumping Capacity (6 g/s at 2 K) Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

JT Heat Exchanger Pumping Limit With the current VTS JT Heat Exchanger design, practical limit for 2K operation is around 8 to 10 g/s due to excessive shellside pressure drop Taking into account flashing losses at the JT valve, up to 200 Watts can be removed with a continuous supply and pumping of 10 g/s To remove more than 200 Watts (10 g/s pumping) continuously, a redesigned JT Heat Exchanger must be used in future VTS. This may require an adjustment to the cryostat (and pit) diameters. We recommend using 160 Watts (8 g/s pumping) as the practical limit for continuous 2K operation of the current VTS design. Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

IB1 Infrastructure Analysis for Multiple VTS IB1 Pumping Capacity Installed: 6 g/s at 20 Torr Kinney Pump I: 4 g/s Kinney Pump II: 2 g/s Need more pumping: Margin for higher gradients and/or lower Q continuous operation Simultaneous operation of superfluid magnet test and cavity test Preferred option: a new, dedicated, large (13 g/s) vacuum pump for VTS stands. Use existing pumps for magnet testing. Alternative option: add a third pump (4 g/s or larger) and share all three pumps for both magnet and cavity testing (requires a valve manifold to easily allocate and share pumping capacity to different test stands) Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

IB1 Infrastructure Analysis for Multiple VTS Compressor/Purifier Contamination is already one of the largest reason for IB1 cryo system unscheduled downtime and loss of efficiency Addition of sub atmospheric test stands will make this problem worse Need a high pressure compressor and purifier skid to remove all contamination at the outlet of vacuum pumping system (like the one recently installed at ILCTA_MDB). This is a high-priority item, even for only one VTS stand. Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

IB1 Infrastructure Analysis for Multiple VTS LHe Inventory IB1 cryo system LHe make rate: ~ 250 l/hr (9 g/s) VTS LHe consumption per test cycle: ~ 2,000 l (equivalent to 27 l/hr for a 75-hr test cycle) For three VTS stands operating continuously: 3x27 = 81 l/hr On average, there is still ~ 170 l/hr LHe make rate available to support magnet testing. Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

IB1 Infrastructure Analysis for Multiple VTS IB1 LHe and GHe storage A 10,000 liter He dewar stores up to 7,000 liter of LHe Three 30,000 Gallon GHe tanks store up to 3,900 LHe equivalent He gas (only 55% of LHe inventory capacity) Need two more 30,000 Gallon tanks to store the majority of LHe inventory as gas Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

IB1 Infrastructure Analysis for Multiple VTS IB1 FY07 Test Schedule and Civil Construction (Window during Feeder 47 and Cryo Maintenance Upgrade April-May 07) Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS : Magnet Dept. Support : SRF Dept. Support : IB1 Maintenance : New development needed for test

Preliminary M&S Cost Estimate Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS

IB1 Infrastructure Analysis for Multiple VTS Project Challenges Aggressive schedule (Phase I ready by mid-2007, Phase II by mid-2008) Must minimize disruption to the Magnet Test Program Requires experienced resources outside of T&I department (e.g., AD-Cryo, FESS) Must be a Laboratory High Priority Project Requires adequate funding Schedule-driven nature of project dictates need to procure turn-key skids from industry as much as possible (e.g., Compressor/Purifier, Kinney Pump) Ruben Carcagno IB1 Infrastructure Analysis for Multiple VTS