Forecast Verification

Slides:



Advertisements
Similar presentations
September 10, 2013SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 1 Forecast Verification.
Advertisements

Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And GFSv2 forced with Bias corrected CFSv2 forecasted SST.
Willem A. Landman Ruth Park Stephanie Landman Francois Engelbrecht.
Forecast Verification Working group on Extended Range Prediction Ministry of Earth System Sciences, India.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
11 Predictability of Monsoons in CFS V. Krishnamurthy Center for Ocean-Land-Atmosphere Studies Institute of Global Environment and Society Calverton, MD.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
September 4, 2013SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 1 Forecast Verification.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Effect of Tibetan snow on Indian Summer monsoon rainfall using RegCM2.5 M. S. Shekhar & S. K. Dash Indian Institute of Technology Delhi Hauz Khas, New.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
1. Introduction 2. The model and experimental design 3. Space-time structure of systematic error 4. Space-time structure of forecast error 5. Error growth.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Quantitative Forecasting Methods (Non-Naive)
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
1 Summary of CFS ENSO Forecast September 2010 update Mingyue Chen, Wanqiu Wang and Arun Kumar Climate Prediction Center 1.Latest forecast of Nino3.4 index.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
September 14, 2013SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 1 INITIAL CONDITION 13 th September 2013 Extended range prediction during 2013 season.
September 4, 2013SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 1 Forecast Verification.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
LONG RANGE FORECAST SW MONSOON
JMA Seasonal Prediction of South Asian Climate for OND 2017
JMA Seasonal Prediction of South Asian Climate for OND 2017
LONG RANGE FORECAST SW MONSOON
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
Adnan Akyuz, Ph.D. NDSU, AES State Climatologist Updated 8/31/2017
LONG RANGE FORECAST SW MONSOON
COSMO Priority Project ”Quantitative Precipitation Forecasts”
Forecast Verification
National Monsoon Mission Scoping Workshop April 11-15, 2011
Shuhua Li and Andrew W. Robertson
Country Presentation SASCOF September 2016 Maldives
Preliminary Consensus Forecast for the 2017 NE Monsoon Season
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
Adnan Akyuz, Ph.D. NDSU, AES State Climatologist Updated 9/7/2017
Seasonal-to-interannual climate prediction using a fully coupled OAGCM
2013 Macau Rainy Season Forecast
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
Nuffield Free-Standing Mathematics Activities Music Festival
Seasonal Predictions for South Asia
IEEE Standards University Website Traffic Monthly Report
University of Washington Center for Science in the Earth System
Revised Monsoon 2015 Forecast
Forecast Verification
CORPUS CHRISTI CATHOLIC COLLEGE – GEOGRAPHY DEPARTMENT
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
Forecast Verification
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
April May April May June July July June August Sept August
HOW TO DRAW CLIMATE GRAPHS
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
Saraju K. Baidya Department of Hydrology and Meteorology Nepal
Adnan Akyuz, Ph.D. NDSU, AES State Climatologist Updated 8/28/2017
Predictors Observed rainfall up to May.
Forecast Verification
Adnan Akyuz, Ph.D. NDSU, AES State Climatologist Updated 9/28/2017
Month Rainfall (mm) Temp Jan Feb March 34 April 38 May June July
Objective - To make a line graph.
This is meant for scientific use only.
UW WRF mbar forecasts.
This is meant for scientific use only.
This is meant for scientific use only.
This is meant for scientific use only.
This is meant for scientific use only.
This is meant for scientific use only.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

Forecast Verification Spatial pentad mean for the Month of August-September Working group on Extended Range Prediction Ministry of Earth System Sciences, India

Pentad mean Rainfall (mm/day) for period 31July-4 August, 2013 Actual Anomaly Forecast valid for Period 31July-4Aug P1-lead, IC 30 July P2-lead, IC 25 July P3-lead, IC 20 July P4-lead, IC 15 July CFS GFSbc CFS GFSbc

Pentad mean Rainfall (mm/day) for period 5-9 August, 2013 Actual Anomaly Forecast valid for Period 5-9Aug P1-lead, IC 4 Aug P2-lead, IC 30 July P3-lead, IC 25 July P4-lead, IC 20 July CFS GFSbc CFS GFSbc

Pentad mean Rainfall (mm/day) for period 10-14 August, 2013 Actual Anomaly Forecast valid for Period 10-14Aug P1-lead, IC 9 Aug P2-lead, IC 4 Aug P3-lead, IC 30 July P4-lead, IC 25 July CFS GFSbc CFS GFSbc

Pentad mean Rainfall (mm/day) for period 15-19 August, 2013 Actual Anomaly Forecast valid for Period 15-19Aug P1-lead, IC 14 Aug P2-lead, IC 9 Aug P3-lead, IC 4 Aug P4-lead, IC 30 July CFS GFSbc CFS GFSbc

Pentad mean Rainfall (mm/day) for period 20-24 August, 2013 Actual Anomaly Forecast valid for Period 20-24Aug P1-lead, IC 19 Aug P2-lead, IC 14 Aug P3-lead, IC 9 Aug P4-lead, IC 4 Aug CFS GFSbc CFS GFSbc

Pentad mean Rainfall (mm/day) for period 25-29 August, 2013 Actual Anomaly Forecast valid for Period 25-29Aug P1-lead, IC 24 Aug P2-lead, IC 19 Aug P3-lead, IC 14 Aug P4-lead, IC 9 Aug CFS GFSbc CFS GFSbc

Pentad mean Rainfall (mm/day) for period 30 Aug-4 Sep, 2013 Actual Anomaly Forecast valid for Period 30 Aug-3 Sep P1-lead, IC 29 Aug P2-lead, IC 24 Aug P3-lead, IC 19 Aug P4-lead, IC 14 Aug CFS GFSbc CFS GFSbc