SWD Response Overview NMSZ TTX April 2015

Slides:



Advertisements
Similar presentations
S1 Specified / Implied Tasks
Advertisements

South Pacific Division
Department of Transportation USCG/ District 9 Waterways Department of Transportation USCG/ District 9 Waterways WEATHER INFORMATION NEEDS / REQUIREMENTS.
US&R Planning. US&R Planning Issues Establish authority and responsibility Assess vulnerability and hazards Identify resources Coordination of response.
Illinois Impact Overview Capstone 14 Exercise. General Impact Overview Total Structures Damaged 18, 347 Total Injured12,900 Total Fatalities382 Total.
Homeland Integration: Missions and Authorities Norm Cotton Homeland Integration Working Group Governance Innovation for Security and Development.
National Level Exercise 2011 (NLE 11) Mary Rhedin Individual and Community Preparedness Officer FEMA Region V, Chicago.
Army Operational Electronic Warfare Course
US Army Corps of Engineers BUILDING STRONG ® NMSZ TTX Operations/Navigation Response.
ESF #1 Transportation.
Training for Integrated Operations
BUILDING STRONG SM Society of American Military Engineers and U.S. Army Corps of Engineers, Little Rock District 2009 SAME Symposium Little Rock District’s.
1 1 FEMA Region VII Private Sector. Private Sector Representative Subject Matter Experts Provide Situational Awareness Manage Logistics Crosscutting Planning.
3  Why does a supervisor or manager need to be familiar with emergency management terms and concepts?
FEDERAL RESOURCES PRE-STAGED/DEPLOYED HURRICANE GUSTAV - REGION VI - TX & OK As of September 3, 2008 at 0700 EDT DALLAS, TX ATF: Agents DHS: Protective.
Operations Security (OPSEC) Introduction  Standard  Application  Objectives  Regulations and Guidance  OPSEC Definition  Indicators.
US Army Corps of Engineers BUILDING STRONG ® USACE New Madrid Earthquake OPLAN.
Lean What? R. Ken Trammell Deputy Commander Marine Corps Logistics Command 20 May 2004.
National Earthquake Program Managers Meeting 1 May 2013 Region X Cascadia Subduction Zone Planning Effort.
ESF #3 – Public Works and Engineering IS-803 – February 2009 Visual 1 Public Works and Engineering ESF #3.
US Army Corps of Engineers BUILDING STRONG ® USACE – Stafford Act Contracting Opportunities Peter Navesky HQ USQACE Disaster Program Manager June 2010.
FEDERAL RESOURCES PRE-STAGED/DEPLOYED REGION IV As of August 31, 2008 at 1700 EDT TAMPA, FL DHS: Protective Security Advisor BIRMINGHAM, AL DHS: Protective.
Brevard County Office of Emergency Management Brevard County Emergency Management Robert Lay, Director Charlie Roberts, Sr EM Coordinator Founded 1513.
UNCLASSIFIED B UILDING S TRONG 1 NMSZ ROC Exercise-2015 NAD MISSION – MAIN EFFORT:  Deploy requested response personnel ISO LRD (per OPLAN 2014 to assists.
NMSZ Event Overview: Roles, Responsibilities, and the Marine Transportation System Recovery Unit (MTSRU) 22 April 2015 Semper Paratus United States Coast.
UNCLASSIFIED B UILDING S TRONG 1 LRD – Phase 2C ( Days)
New Madrid Earthquake Scenario Water Sector – Impacts & Federal Support CAPT David M. Apanian, P.E., MSCEE U.S. Environmental Protection Agency – Region.
UNCLASSIFIED B UILDING S TRONG 1 Focus on Navigation – deliberate mission analysis  Integration with MTSRU (Marine Transportation Systems Recovery Unit)
Mississippi River Recovery Task Force Bob Hainly Task Force Member 2012 USACE Flood Risk Management Representing: and Silver Jackets Workshop USGS Water.
Virginia Defense Force National Guard Civilian Support (NGCS)
BUILDING STRONG ® USACE/FEMA 2011 Remedial Action Program Workshop December 6-9, 2011 Orlando, FL.
2015 USACE Exercise – December 1, 2015 New Madrid Seismic Zone – Earthquake FEMA Mission, Legal Authorities and Regional Capability Overview Gus Wulfkuhle.
TAC Mission Analysis. Oporder Format Situation – Higher Headquarters’ Mission and Intent (Citadel’s Mission Statement and Guide to LDP) Mission (Commandant’s.
National Flood Risk Management Flood Risk Management Summit Cambridge, Maryland National Flood Risk Management Flood Risk Management Summit Cambridge,
1 Roles and Responsibilities During a Water Sector Incident: USEPA and USACE Dawn Ison, EPA Region 6 Arkansas Exercise for the Water Sector 2010 November.
DHS FEMA Region IX Response Operations. FEMA Region IX Jurisdictions Pacific Area Office (Ft. Shafter, HI) Hawaii 2500 miles Guam 3700 miles American.
1 ESF #10 Funding Overview The Experiences and Perspectives of the National Pollution Funds Center Presentation for the USCG – EPA ESF #10 Seminar Seattle,
5 UNCLASSIFIED NC JFLCC / USARNORTH Search and Rescue (SAR) Capabilities Brief USNORTHCOM SAR Workshop 1 Presented by LTC Hahn 02MAY16.
1 EPA Region 4 Approach to a New Madrid Earthquake Response Art Smith Federal On-Scene Coordinator EPA Region 4 December 1, 2015.
US Army Corps of Engineers BUILDING STRONG ® USACE New Madrid Seismic Zone Earthquake Response OPLAN USACE DCO/G3 14 June 2016.
NATO / ISAF UNCLASSIFIED LOGO Practical Exercise Use current FATAH plan, chosen village, and instructional material to conduct CIMIC and develop CIMIC.
Disaster Response Overview for NSARC and SSARCC Meetings
Role of Data in Use of HAZUS-MH for Risk Assessment and Preparedness
USACE OPLAN New Madrid Seismic Zone Earthquake
Michigan National Guard CBRN Response Exercise NORTHERN EXPOSURE 17 Overview June 2017.
Yogyakarta Earthquake: Humanitarian Update
Damage Assessment Data collection
Mississippi Valley Division Phase 2c (3-30 days)
Presented by: Sandra Easter
ArcGIS for Emergency Management– An Overview
Continuity of Operations Planning Introduction & Practical Application – PART TWO Kelly Keenan, MPH May 14, 2015.
Indiana Impact Overview
TEXAS GULF COAST HURRICANE RESPONSE
RUNNING ESTIMATE METT-TC UNIT: DTG: EVENT: (PAGE 1 OF 5)
RUNNING ESTIMATE METT-TC UNIT: DTG: EVENT: (PAGE 1 OF 5)
Southern California Catastrophic Earthquake Response Plan
Mississippi Valley Division New Madrid Earthquake Concept of Operations St. Louis District 14 June 2016.
U.S. Coast Guard and the National Disaster Recovery Framework
Phase 2c (Day 3 – Day 30) Complete project assessments
Mississippi Valley Division New Madrid Earthquake Concept of Operations Memphis District 14 June 2016.
John M. Felker Director, NCCIC.
What are the “Top 5” Personnel Accountability challenges and solutions for an S-1?
Role of FEMA EHP During Response Activities
Incident Commander Pro
MVD NEW MADRID EARTHQUAKE RESPONSE PLAN
SWD Response Overview NMSZ TTX April 2015
FEMA Transportation Update April 23, 2014 Darrell Ransom
City of Richmond Office of Emergency Management
Northwestern Division New Madrid Seismic Zone Response Plan
Unit 5: Interconnectivity of NIMS Command and Coordination Structures
Presentation transcript:

SWD Response Overview NMSZ TTX 21-22 April 2015

Command, Control, Communication NMSZ ROC Exercise SWD-Phase 2A-2B Movements - Phase 2A EQ Activation Trigger at 6.0M, all comms out. SWL LNO to ADEM EOC Provide District LNO to key nodes within AR Provide ESF#3 to FEMA VI RRCC Provide ESF #3 to FEMA IMAT to IOF at Camp Robinson, AR Phase 2B Deploy SWD Forward to Camp Robinson, AR IOF/JFO or SWL (if not impacted) Deploy Mission PRTs AND 249TH to identified Federal ISB locations within AR as directed. Mission – Main effort Personnel accountability Critical CW infrastructure assessments Temporary repairs to FRM infrastructure ISO flood fighting measures Execute ESF #3 ISO FEMA in AR Establish LNOs with USCG MTSRUs in AR Establish situational awareness with MVD operations along Mississippi and Tributaries SWT BPT to assume NRF mission if SWL impacted Specified, Implied and Essential tasks S- Lead Div ISO DOD, FEMA, & USCG in the State of Arkansas. S- Determine status of survivor district and initiate reconstitution. S- Assess and repair CW Infrastructure I- Personnel accountability I- Restore Navigation and Ports. I- Support Cell to ARNORTH MAIN EFFORT OF CONCERN: located on the NE Quad of AR Clear Water Dam Grears Ferry Dam Bull Shoals Dam Norfolk Dam Command, Control, Communication SWD assumes control of NRF response in AR SWL responsible for NRF Mission execution ESF#3 TL/ATL to RRCC/IMAT Determine CW Operations and Navigation Task Force SWF/SWG/SWT mission PRT CW/FRM/PL 84-99 Response within Civil Boundaries.

Transportation routes impacted Air asset availability NMSZ ROC Exercise SWD-Phase 2A-2B Constraints: Transportation routes impacted Air asset availability Lack of infrastructure and mobility ACI Contract support availability Response personnel endurance Gaps/Concern/Recommendations: C2 platform availability (i.e. DTOS units, office space) Resources limitation for all impacted states. EECCV 9 Designated to St Louis and bypassing Arkansas. Waiting to receiving ECCV from SPK (??)