Scheduling Resources and Costs

Slides:



Advertisements
Similar presentations
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Advertisements

Chapter 8: Scheduling Resources and Costs
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Scheduling Resources and Costs Chapter 8.
Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.
RESOURCES Roger D. H. Warburton © Kanabar / Warburton,
Resource Management Chapter 12.
Project Management 6e..
Resource Management Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall.
Project Management Cost and Resources
Software project management (intro) Resource allocation.
OPSM 639, C. Akkan Resource Planning Resources affect the schedule, cost and performance of a project. Resources are –Individual people, departments/teams,
Copyright 2009 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
Copyright 2012 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Scheduling Resources Chapter 8.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
Project Management OPER 576 Resource Allocation Greg Magnan, Ph.D. May 6, 2004.
Lecture 3 Scheduling CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
Scheduling Resources and Costs CHAPTER EIGHT PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
The Resource Problem Resources and Priorities
Scheduling Resources and Cost
Modeling Tough Scheduling Problems with Software Alex S. Brown Mitsui Sumitomo Marine Management (USA), Inc.
Pegasus Project Management: Resource Factors November 8, 2001 MBA 253 The Pegasus Group: Mario RossoMario Rosso Phil RandolphPhil Randolph.
Copyright 2012 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
Optimizing the utilization of your skilled resources How to balance demand with capacity in volatile multi–project environments Barry Muir Managing Director.
6 Resource Utilization 4/28/2017 Teaching Strategies
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
University Of Palestine Faculty Of Applied Engineering & Urban Planning Civil Engineering Department PROJECT MANAGEMENT Scheduling Resources and Costs.
Project management. Software project management ■It is the discipline of planning, organizing and managing resources to bring about the successful completion.
COMP201 Project Management.
Scheduling Resources and Costs
Critical Path Analysis (CPA)
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Scheduling Resources and Costs
Chapter 8 Resource Considerations
Why is software engineering worth studying?
Maintenance Scheduling
Project Planning & Scheduling
Resource Allocation Chapter#8.
Project Management -- Scheduling Resources and Costs
Software Engineering Fall 2005
Scheduling Resources and Costs
Class 27: Project Management Part II
ACTIVITY PLANNING AND RISK MANAGEMENT
Project Planning & Scheduling
MAINTENANCE PLANNING AND SCHEDULING
Chapter 8 Scheduling Resources.
PROJECT MANAGEMENT WITH CPM/PERT.
Theory, Tools, and Obstacles
ENGINEERING MANAGEMENT (GE 404)
Resource management Chapter 12 Copyright ©2016 Pearson Education, Inc.
Risk Analysis & Success Driven Project Management
Software Project Management Fifth Edition
Project management Lecture 9
Chapter 9 Resource Allocation © 2012 John Wiley & Sons Inc.
ENGINEERING MANAGEMENT (GE 404)
Manajemen Industri Teknologi informasi
Resource Allocation Chapter#8.
Resource Allocation Chapter#8.
Reducing Project Duration
Resource Allocation Chapter#8.
University of Debrecen Mongolian University of Life Sciences
Where We Are Now. Where We Are Now The Resource Problem Resources and Priorities Project network times are a schedule until resources have been assigned.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Scheduling Resources and Costs
Presentation transcript:

Scheduling Resources and Costs C H A P T E R E I G H T Scheduling Resources and Costs

Overview of the Resource Scheduling Problem After staff and other resources were assigned to her project, a project manager listed the following questions that still needed to be addressed: Will the assigned labor and/or equipment be adequate and available to deal with my project? Will outside contractors have to be used? Do unforeseen resource dependencies exist? Is there a new critical path? How much flexibility do we have in using resources? Is the original deadline realistic?

Types of Resource Constraints People. This is the most obvious and important project resource. Human resources are usually classified by the skills they bring to the project—for example programmer, mechanical engineer, welder, inspector, marketing director, supervisor. In rare cases some skills are interchangeable, but usually with a loss of productivity. The many differing skills of human resources add to the complexity of scheduling projects. Materials. Project materials cover a large spectrum: for example, chemicals for a scientific project, concrete for a road project, survey data for a marketing project. Equipment. Equipment is usually presented by type, size, and quantity. In some cases equipment can be interchanged to improve schedules, but this is not typical. Equipment is often overlooked as a constraint. The most common oversight is to assume the resource pool is more than adequate for the project. For example, if a project needs one earthmoving tractor six months from now and the organization owns four, it is common to assume the resource will not delay the pending project.

Classification of a Scheduling Problem A time-constrained project is one that must be completed by an imposed date. If required, resources can be added to ensure the project is completed by a specific date. Although time is the critical factor, resource usage should be no more than is necessary and sufficient. A resource-constrained project is one that assumes the level of resources available cannot be exceeded. If the resources are inadequate, it will be acceptable to delay the project, but as little as possible.

Resource Allocation Methods Assumptions First, splitting activities will not be allowed. This means once an activity is placed in the schedule, assume it will be worked on continuously until it is finished; hence, an activity cannot be started, stopped for a period of time, and then finished. Second, the level of resources used for an activity cannot be changed. These limiting assumptions do not exist in practice, but simplify learning. It is easy for new project managers to deal with the reality of splitting activities and changing the level of resources when they meet them on the job.

Time-Constrained Projects: Smoothing Resource Demand Scheduling time-constrained projects focuses on resource utilization. When demand for a specific resource type is erratic, it is difficult to manage, and utilization may be very poor. Practitioners have attacked the utilization problem using resource leveling techniques that balance demand for a resource. Resource-Constrained Projects When the number of people and/or equipment is not adequate to meet peak demand requirements and it is impossible to obtain more, the project manager faces a resource-constrained problem.

The parallel method is the most widely used approach to apply heuristics, which have been found to consistently minimize project delay over a large variety of projects. The parallel method is an iterative process that starts from the beginning of project time and, when resources needed exceed the resources available, retains activities first by the priority rules: 1. Minimum slack. 2. Smallest duration. 3. Lowest activity identification number.

Splitting Activities Splitting tasks is a scheduling technique used to get a better project schedule and/or to increase resource utilization. A planner splits the continuous work included in an activity by interrupting the work and sending the resource to another activity for a period of time and then having the resource resume work on the original activity. Splitting can be a useful tool if the work involved does not include large start-up or shutdown costs—for example, moving equipment from one activity location to another. The most common error is to interrupt “people work,” where there are high conceptual start-up and shutdown costs. For example, having a bridge designer take time off to work on the design problem of another project may cause this individual to lose four days shifting conceptual gears in and out of two activities. The cost may be hidden, but it is real.

Splitting Activities

Benefits of Scheduling Resources It is important to remember that, if resources are truly limited and activity time estimates are accurate, the resource-constrained schedule will materialize as the project is implemented—not the time-constrained schedule! Therefore, failure to schedule limited resources can lead to serious problems for a project manager. The benefit of creating this schedule before the project begins leaves time for considering reasonable alternatives. If the scheduled delay is unacceptable or the risk of being delayed too high, the assumption of being resource constrained can be reassessed. Cost-time trade-offs can be considered. In some cases priorities may be changed.

Multiproject Resource Schedules The following lists three of the more common problems encountered in managing multiproject resource schedules. Note that these are macro manifestations of single-project problems that are now magnified in a multiproject environment: 1. Overall schedule slippage. Because projects often share resources, delays in one project can have a ripple effect and delay other projects. For example, work on one software development project can grind to a halt because the coders scheduled for the next critical task are late in completing their work on another development project. 2. Inefficient resource utilization. Because projects have different schedules and requirements, there are peaks and valleys in overall resource demands. For example, a firm may have a staff of 10 electricians to meet peak demands when, under normal conditions, only 5 electricians are required. 3. Resource bottlenecks. Delays and schedules are extended as a result of shortages of critical resources that are required by multiple projects. For example, at one Lattice Semiconductor facility, project schedules were delayed because of competition over access to test equipment necessary to debug programs. Likewise, several projects at a U.S. forest area were extended because there was only one silviculturist on the staff.

Using the Resource Schedule to Develop a Project Cost Baseline Why a Time-Phased Budget Baseline Is Needed The need for a time-phased budget baseline is demonstrated in the following scenario. The development of a new product is to be completed in 10 weeks at an estimated cost of $400,000 per week for a total cost of $4 million. Management wants a status report at the end of five weeks. The following information has been collected: • Planned costs for the first five weeks are $2,000,000. • Actual costs for the first five weeks are $2,400,000 How are we doing? It would be easy to draw the conclusion there is a $400,000 cost overrun. But we really have no way of knowing. The $400,000 may represent money spent to move the project ahead of schedule. Assume another set of data at the end of five weeks: • Actual costs for the first five weeks are $1,700,000.

Creating a Time-Phased Budget 1. Define work (what). 2 Creating a Time-Phased Budget 1. Define work (what). 2. Identify time to complete a work package (how long). 3. Identify a time-phased budget to complete a work package (cost). 4. Identify resources needed to complete a work package (how much). 5. Identify a single person responsible for units of work (who). 6. Identify monitoring points for measuring progress (how well).