Quality Management at the Engagement Level Proposed ISA 220 (Revised)

Slides:



Advertisements
Similar presentations
Page 1 Conflicts of Interest Peter Hughes IESBA December 2012 New York, USA.
Advertisements

Page 1 Innovation Working Group Dan Montgomery, Chair, Innovation Working Group Agenda Item 8-A IAASB Meeting, September 15-19, 2014 New York, USA.
Breach of a Requirement of the Code Marisa Orbea New York 19 June 2012.
Page 1 | Proprietary and Copyrighted Information Structure of the Code Don Thomson, Task Force Chair IESBA Meeting New York, USA April , 2015.
SAFA- IFAC Regional SMP Forum
ISA 220 – Quality Control for Audits of Historical Financial Information
Page 1 | Proprietary and Copyrighted Information Safeguards Gary Hannaford, Task Force Chair IESBA Meeting New York, USA September 15, 2015.
Page 1 Non-Assurance Services Gary Hannaford IESBA January 2015 London.
Page 1 | Confidential and Proprietary Information Structure of the Code Don Thomson, Working Group Chair IESBA Meeting Toronto, Canada April 7-9, 2014.
Page 1 | Proprietary and Copyrighted Information Structure of the Code Don Thomson, Task Force Chair IESBA Meeting New York, USA November 30 – December.
Page 1 | Confidential and Proprietary Information Definition of Engagement Team New York, December 2012.
Page 1 | Proprietary and Copyrighted Information NOCLAR Caroline Gardner, Task Force Chair IESBA Meeting New York April 13-15, 2015.
Page 1 | Proprietary and Copyrighted Information Part C Jim Gaa, Chair Part C Task Force IESBA Meeting December 2, 2015 New York.
March 2010 – IAASB to consider issues paper and task force proposals June 2010 – IAASB first read of exposure draft (prior to next IESBA meeting) September.
Page 1 | Proprietary and Copyrighted Information Structure of the Code Don Thomson, Task Force Chair IESBA Meeting New York, USA April , 2015.
Page 1 Auditor Reporting – Listing of Independence/Ethical Sources Bruce Winter, IAASB Member and DT-700 Chair IESBA Board Meeting – Agenda Item 8 April.
Page 1 | Proprietary and Copyrighted Information Structure of the Code Don Thomson, Task Force Chair IESBA Meeting New York, USA September 15-16, 2015.
IAASB –February 2010 – Task Force finalized draft for discussion with IAASB and IAASB CAG in March 2010 –June approval of exposure draft IESBA –Closely.
Page 1 | Proprietary and Copyrighted Information NOCLAR Richard Fleck, Task Force Chair IESBA Meeting Madrid March 14, 2016.
IESBA Meeting June 28, 2016 Brian Hunt, IFIAR Vice Chair New York, 28 June 2016 IFIAR: International Forum of Independent Audit Regulators.
Page 1 | Proprietary and Copyrighted Information Structure of the Code – Phase 2 Don Thomson, Task Force Chair IESBA Meeting New York, USA June 27-29,
Structure of the Code Phases 1 and 2 Revised Texts
Bruce Winter, IAASB Member and ISA 700 Drafting Team Chair
Safeguards- Feedback on Safeguards ED-2 and Task Force Proposals
Structure of the Code Don Thomson, Task Force Chair IESBA Meeting
Review of Part C Phase 2 - Applicability
Review of Part C of the Code – Applicability
Structure of the Code Phase 1
Professional Skepticism and Professional Judgment
Structure of the Code – Phases 1 and 2
Structure of the Code – Phase 2 TF Comments and Proposals
Structure of the Code Don Thomson, Task Force Chair IESBA Meeting
Professional Skepticism and Professional Judgment
ISA 315 (Revised) Identifying and Assessing the Risks of Material Misstatement through Understanding the Entity and Its Environment Fiona Campbell, ISA.
ISA 540 (Revised) Rich Sharko, IAASB Member and Chair of the ISA 540 Task Force Marek Grabowski, IAASB Member and Co-Chair of the ISA 540 Task Force June.
Structure of the Code Phase 1
Proposed ISRS 4400 (Revised)
Professional Skepticism
Quality Management at the Engagement Level Proposed ISA 220 (Revised)
Megan Zietsman, Task Force Chair IAASB Meeting, New York, USA
IAASB-IESBA Coordination
Structure–Feedback on Structure ED-2 and Task Force Proposals
Quality Management (Firm Level)
Don Thomson, Task Force Chair IESBA Meeting New York July 7-9, 2014
Alignment of Part 4B with ISAE 3000
IESBA Meeting New York September 17-20, 2018
Structure of the Code Phase 2
IESBA Meeting New York September 26-30, 2016
Quality Management at the Engagement Level Proposed ISA 220 (Revised)
Proposed ISQC 1 (Revised)
ISA 610 Using the Work of Internal Audit
IESBA Meeting New York December 3-5, 2018
Proposed ISQC 1 (Revised)
Alignment of Part 4B with ISAE 3000
Proposed ISQM 2 Imran Vanker, EQ Review Task Force Chair
Proposed ISQM 1 Karin French, Quality Control Task Force Chair
Structure of the Code Don Thomson, Task Force Chair IESBA CAG Meeting
IAASB-IESBA Coordination
Long Association Task Force
Alignment of Part 4B with ISAE 3000
Fees – Issues and Proposals
Alignment of Part 4B with ISAE 3000
Structure of the Code Don Thomson, Task Force Chair IESBA CAG Meeting
Alignment of Part 4B with ISAE 3000
IESBA Meeting Nashville June 17-19, 2019
IAASB-IESBA Coordination Update
Lyn Provost, IAASB Member and Task Force Chair IAASB Meeting
IAASB – IESBA Coordination Fees Proposals by IESBA
Fiona Campbell, ISA 315 Task Force Chair & Deputy Chair of the IAASB
Fiona Campbell, ISA 315 Task Force Chair & Deputy Chair of the IAASB
Presentation transcript:

Quality Management at the Engagement Level Proposed ISA 220 (Revised) Megan Zietsman, Task Force Chair IAASB Meeting, New York, USA Agenda Item 3 December 10, 2018

Introduction

Outreach and Feedback Received in Q4 Disposition of IAASB comments from September 2018 IAASB Meeting Other input received from: IOSCO Committee 1, Auditing Sub-Committee IFIAR Standards Coordination Working Group IESBA, through written comments No significant matters Forum of Firms CEAOB SMPC letter

Walk Through of Proposed ISA 220 (Revised)

Introduction, Objective, and Definitions Proposed ISA 220 (Revised) – Agenda Item 3–A Section Paragraph(s) Application Material Introduction 1–7 A1–A15 Objective 8 None Definitions 9 A16–A21 Proposed Changes from Written Comments Para. A4 – Clarify how national requirements can be determined as at least as demanding as proposed ISQM 1 Para. A8 – Consider additional example

Proposed ISA 220 (Revised) – Agenda Item 3–A Leadership Responsibilities for Managing and Achieving Quality on Audits Proposed ISA 220 (Revised) – Agenda Item 3–A Paragraph(s) 11–13 Application Material A22–A30 Proposed Changes from Written Comments Para. 11 – Make clear that the engagement partner’s (EP’s) responsibility is for the engagement environment Para. 12 – Incorporate (c) into the lead in Para. 13(b) – Clarify that the EP reviews selected documentation for the purpose of monitoring the work of assignees

Relevant Ethical Requirements, Including Independence Requirements Proposed ISA 220 (Revised) – Agenda Item 4–A Paragraph(s) 14–19 Application Material A31–A42 Proposed Changes from Written Comments Para. 16 – Consider reference to firm policies or procedures Para. A38 – Delete in response to concern from IESBA

Proposed ISA 220 (Revised) – Agenda Item 3–A Acceptance and Continuance of Client Relationships and Audit Engagements Proposed ISA 220 (Revised) – Agenda Item 3–A Paragraph(s) 20–22 Application Material A43–A52 Proposed Changes from Written Comments None significant

Proposed ISA 220 (Revised) – Agenda Item 3–A Engagement Resources Proposed ISA 220 (Revised) – Agenda Item 3–A Paragraph(s) 23–26 Application Material A53–A68 Proposed Changes from Written Comments None significant

Engagement Performance – Direction, Supervision, and Review Proposed ISA 220 (Revised) – Agenda Item 3–A Paragraph(s) 27–31 Application Material A69–A84 Proposed Changes from Written Comments None significant

Other Sections Section Paragraph(s) Application Material Consultation 32 A85–A88 Engagement Quality Review 33 A89–A93 Differences of Opinion 34–35 A94–A95 Monitoring and Remediation 36 A96–A99 Proposed Changes from Written Comments Para. 32(a)(ii) – Incorporate difficult or contentious matters into (ii) Para. 33(a) – Change from “determine” to “be satisfied” Para. 36 – Consider ET responsibilities for network/network firm results Para. A95 – Remove first bullet at IESBA request

Taking Overall Responsibility, Documentation Section Paragraph(s) Application Material Taking Overall Responsibility 37 A100–A102 Documentation 38 A103–A105 Proposed Changes from Written Comments Para. 37(a) – Change “issues” to “matters” Para. 37(c) – Minor alignment with posted ISQM 2