Deciduous Fruit Shipping Challenges

Slides:



Advertisements
Similar presentations
OR Modeling in Intermodal: Intermodal Railcar Management Dharma Acharya, Jagadish Jampani, Aihong Wen.
Advertisements

Test practice Multiplication. Multiplication 9x2.
Rail is making a difference in domestic crude growth Grand Forks, ND BNSF Railway Matthew K. Rose Chairman and Chief Executive Officer September 18, 2013.
Book 2: Chapter 2 Economic Planning for New Pipelines.
Expanding Produce & Floral Ports of Entry. Imported Fruits, Vegetables, & Floral Products U.S. consumers expect a wide variety and year- round supplies.
Challenge in Teaching Forecasting Don’t fabricate “real” data Only your instructor can do that!
> >
©2000 Addison Wesley IEEE 754 single precision floating-point number format.
Future Trends. Infrastructure The Urban Age People (Billion) % Living in Cities 10% Cities Greater than 1 Million %
PPP in Local Authorities – 2 June 2003 Trends and Predicted Forecasts David Locke.
IT Networking Challenges for Westchester/CT-area Businesses Presented by: David Giannetta Territory Manager Westchester County Fibertech Networks.
Clinical Research Networks Notifications Practice Policy Stewardship Lives Saved Diagnostics Pathogenesis Incidence Outcome Risk Factors Treatment Public.
AAPA 2011 Pre-CAPSA’11 Study Tour – Bitumen Imports Bitumen Imports - an Australian perspective.
ITS What are the ITS applications? To increase the safety and capacity of existing facilities How much is ITS? When to deploy ITS? Intelligent Transportation.
Citrus Throughput Calculation Dwell ave. of 07 days = throughput per slot of 20.0 Dwell ave. of 08 days = throughput per slot of 17.5 Dwell ave. of 09.
Main Function of SCM (Part II). Main Functions  Procurement (supplier selection, optimal procurement policies, etc.)  Manufacturing (plant location,
3-1Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
EDI Legs Overview. EDI 214 The EDI 214, which contains the leg and other shipping information, is sent to JSI from the freight forwarder. The USAID |
RGGI Stakeholder Meeting 6/24/04 Temporal Flexibility in the Context of RGGI Nancy L. Seidman Massachusetts DEP.
Next Generation Data and Computing Facility NCAR “Data Center” project An NCAR-led computing ‘facility’ for the study of the Earth system.

Community Digital Development.
Global SCARA Robots Market in Food and Beverage Industry The Global SCARA Robots Market in Food and Beverage Industry is expected to increase.
Complete Strategic Analysis Group 2. Agenda  Key Issues  Problems, challenges, and opportunities  Internal Analysis  External Analysis  Strategic.
Together we can build something great FORWARD | 2016 Visual Scheduling and Data Collection (Scanning) Bill Natalie, Shawn Luginbuhl, Jim Welch.
FACILITIES PLANNING ISE310L SESSION 25 Warehouses, November 17, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? Any supply chain or facilities stories or.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
Pertemuan 11.
THE IMPACT OF GLOBAL LOGISTICS
Economic issues Formulation of Business cases H. Sudarshan
HP SmartStream Production Center
Which network parameters are interesting
IG INTERNATIONAL Pvt. Ltd.
ROUTE MANAGER TRAINING
Smart Agriculture and Real Options
Speed Up QAD Requisition Creation, Routing & Approval
Chicago Transit Authority Energy Initiatives
‘Facilitating students and graduates in presenting themselves for the 21st Century.’  
Truck parking – analytical challenges
FEDMALL Overview May 2017.
Why Special Events are Special
Effective Sourcing Processes for Logistics Service Providers
Risk Assessment and Probabilistic Transmission Planning Methods
Natural Gas Infrastructure Assessment
Integrated Transport and Distribution Management in Shipping
COMMUNICATION.
Adverse weather and ATM: Consequences of climate change
Computing and Global Health Lecture 5 Logistics
Update on the Status of Numerical Weather Prediction
نظم المعلومات الإدارية PAD334
GÉANT network Evolution
Outstanding Shipment Report and Sales Order Status
فرایند تسهیلگری در مددکاری جامعه ای
What is the Value of an IBM Balanced Warehouse™
Tajiguas Resource Recovery Project Doing More with Our Waste
Distribution Center Profiles And Best Practices
Lesson Five: Decision Making
Data Quality Model Welcome to Everyone
Architecture for Modular Data Centers
USE CASE 1 Business Drivers Our Solution
Unit 6: Joplin, Missouri Case Study
Addressing HPWH Market Barriers: Expanded Perspective
Transforming Scenario Narratives into Study Cases
2007 Lessons Learned & Solutions
Facility Partnerships Guideline Ministry of Education March 4, 2010
Risk Modelling & Impact Forecasting Tools
Mixed Up Multiplication Challenge
Drilling In Africa: Lessons Learned
Energy Supply Business Model enabled by the Clean Energy Package
Mid-term review: “CONTINUING REGIONAL SUPPORT FOR THE PERSISTENT ORGANIC POLLUTANTS (POPs) GLOBAL MONITORING PLAN (GMP2)” under the Stockholm Convention.
Presentation transcript:

Deciduous Fruit Shipping Challenges Trends 2006 2007 Containerised Shipments 78% 86%

Challenges Delays Shipping Opportunities Supporting Infrastructure En Route Weather Shipping Opportunities Conventional Opportunities Number of Shipping Lines Container Availability Supporting Infrastructure Stack Times Plug-in Points Loading Points Approval Capacity Capabilities Container Load Multiples Sterilisation Facilities

Options Informed Planning Communication Flexibility Forecasting Pre-packing Planning Communication Flexibility Cost/Benefit Analysis Contingency Planning