RUN-4 has finished About 70 (!!!) billions of candidate tracks collected up to now About 20 (!!!) billions of candidate tracks collected in RUN-4.

Slides:



Advertisements
Similar presentations
MTA ETA. Product Description A real-time simulation system that estimates the expected time that it will take a certain bus to arrive at an end- users.
Advertisements

ONE STOP THE TOTAL SERVICE SOLUTION FOR REMOTE DEVICE MANAGMENT.
Large Sky Dip Calibration Runs Taken once per Day. Lasts ~ 15 minutes long. Telescope elevation varies by 40 degrees. Calibrates the “Leakage” and relative.
ClearCube Blade Manager 4.0 Overview and Demonstration Rev
Hurricane Tracking LAB. Procedures 1.Plot the coordinates of each hurricane on the map provided. 2.The Start point should be marked with the hurricane.
M&B TM 1998 Ford Escort. Ford ECT ECT KOEO ECT Disconnected ECT Voltage= 4.75V ECT Temperature= 61F.
Network Management 2 School of Business Eastern Illinois University © Abdou Illia, Spring 2007 (Week 16, Thursday 4/19/2007)
MTA ETA. Product Description A real-time simulation system that estimates the expected time that it will take a certain bus to arrive at an end- user’s.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Control Systems Did you get these? Washing machine Microwave cooker
Media Awareness Answers Sports & Entertainment Marketing Mrs. Wilson Rocky Point HS.
Scheduling. Operation Protocol Send an application form to patients Receive the returned application form from patients Check doctor’s schedule Check.
LEARNING GOAL: I will be able to track the development of a character over the course of a text and his/her contribution to plot and theme. English Honors.
News Ted & Kirsten June 10, 2005 TDWG. Meet Trigger Reps today? Exotic Trigger Reps: Vadim and Oscar doing great work QCD Trigger Rep: Mary herself EWK.
CAF shifts and procedures Marcello, Raffaello, Alberto, Pigi, Sungeun, David, Silvia, Anna & all the 2009 shifters.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
VOLUNTEER TRAINING For Room Hosts You are our: Room Hosts serve: Speakers Attendees Conference Office.
WEEK 1 You have 10 seconds to name…
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
SIZE - Top SERVER ROOM Designed by – openbox |
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
Presented by V.Kokila I.Nancy. Telemetry & monitoring A system that reliably and transparently conveys measurement information from a remotely located.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
Difference between External and Internal Server Monitoring.
Homework until 28 th April: EXAM DAYS!!!! In order of priority… Make sure you have two well developed final piece ideas towards the end of the project.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
Conservation in my School!
F. Bellini for the DQM core DQM meeting, 04th October 2012
Update on the new analyzer and more
Run 3 Statistics EEE Run coordination meeting esteso alle scuole
Sensation Park Entertainment Group
Graph Rational Numbers on a Coordinate Plane…
Analysis and paper on chamber and telescope performance
7. Test operation.
Data Logging 1 WJEC ICT.
How to Meet Your AR Goals
IS IT EFFECTIVE TO RUN ONLINE DATING BACKGROUND CHECKS YOURSELF?
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
Top Fire Protection Services Ottawa available on Dubinskyconstruction
Math 8C Unit 3 – Statistics
*YOUR NAME*, *Your role*
Warm Up This is data on the number of home runs hit by Barry Bonds in each season of his career. Make a stemplot of the number of home runs he hit per.
Launch and On-orbit Checkout
Warm- Up Jerry wants to ride in a hot air balloon. It costs $180 dollars to rent the balloon and an additional $30 dollars for each hour the balloon is.
Monday Identify the independent variable in each.
Chapters 1-3 Test on Monday, September 18 (warm-ups due on test day)
Goals For our next activity we will be writing some goals.
مديريت موثر جلسات Running a Meeting that Works
Character Education September 15, 2010.
Exploring Scatter Plots
Unit 1 Day 1: The Real Number Line
Reader Meter journal Click here to play the audio.
Taking data efficiently in RUN 5
Sensation Park Entertainment Group
Around the room Orders of operations.
4.1.2 Temporal variation in questing activity and survival
The Horse and the Donkey
News from Technical Coordination
American Studies and Honors 10
Day 1: Introduction to Ramp Tools
Bell Work – Range, Measures of Center, and Dot Plot
Dalkeith High School Daily Bulletin Friday 29 March 2019
What are they? What do they do?
24 h mean of body temperature plotted against 24 h mean of air temperature (A), and 24 h amplitude of body temperature plotted against 24 h range of air.
More or Less? More: a greater number less: a fewer number.
Sawyer PointONEFilter
Presentation transcript:

RUN-4 has finished About 70 (!!!) billions of candidate tracks collected up to now About 20 (!!!) billions of candidate tracks collected in RUN-4

What do to now You can keep your telescopes ON for as long as you wish Do NOT keep them ON if the temperature INSIDE the room hosting the telescope exceeds 27C You do NOT need to write an elog report every day You have to write an elog report every week It is important that you monitor (remotely) the data taking using the DQM plots (the most important!) Coordinate with your local responsible!

We do not stop RUN-5 will start next September 17th You can switch on your telescop as soon as you wish Coordinate with your local responsible Activate yourself to have the telescope rooms air-conditioned