Presentation by Graham Kissack

Slides:



Advertisements
Similar presentations
Effects of Island Park Reservoir on sediment and phosphorus transport in the upper Henrys Fork watershed Rob Van Kirk Senior Scientist Henry’s Fork Foundation.
Advertisements

Watershed Sustainability through local stewardship.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
RRAT – Dredging Update  Gilbert Island Post Construction  Flex Pipe Update  Flex Pipe use  2014 Dredging Update  Dredge Master Plan.
Budget Prep Budget Prep Dates Budgets will be released mid-May Budgets will be due to the Budget Office on June 18 th Budget will be finalized and.
Yakima River Basin Water Storage Feasibility Study 2007 Climate & Water Resource Forecast meeting Kelso, WA Kim McCartney Upper Columbia Area Office October.
Yakima Project Operation Issues Drought 2005 Chris Lynch Yakima Field Office March 2005.
Bay Barometer: A Health and Restoration Assessment of the Chesapeake Bay and Watershed in 2009 Factors Impacting Health Factors Impacting Bay.
Implementation of the Biological Opinion for Russian River Water Supply, Flood Control Operations & Channel Maintenance National Marine Fisheries Service.
Famine Early Warning Systems Network CURRENT CLIMATE SITUATION AND FORECAST June 16 Kabul, Afghanistan.
CRFS Technical Meeting LC Operations Update November 8, 2011.
Cowichan Lake and River status update Trend updates as of July 27, 2015.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Rhode Island Water Resources Board Water Availability An Overview of Water Supply and Water Resources May 5, 2011.
A Community Weatherization Partnership Audit-Weatherize-Educate July 30, 2009 Partnership Meeting Santa Fe College CEID Home Weatherization Initiative:
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Cowichan Lake Storage Assessment – 2015 Final Results Craig Sutherland, M.Sc., P.Eng. July 27, 2015.
Water Supply at Beaver Lake, Arkansas Little Rock District US Army Corps of Engineers ® One Corps Serving The Army and the Nation.
Yellowtail Dam & Bighorn Lake 2010 Operation Review Billings, MT January 2011 RECLAMATION Managing Water in the West.
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
San Gabriel Valley Water Forum August 28, Delta LA Aqueduct Colorado River Aqueduct Supplies State Water Project Supplies Sierra Mtns Local Groundwater.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
USACE Managing a Drought  Overview  Timeline  Depletion Scenario Current Status– 17 Oct 07.
Glen Davidson, P. Eng. Director Water Management Branch Osoyoos Lake Water Science Forum Oct. 9, 2015 Osoyoos BC DROUGHT 2015: Planning and Response.
Alabama Water Resources Conference Perdido Beach, Alabama Mac Underwood, General Manager BWWB BIRMINGHAM WATER WORKS BOARD Sustainability of Water Supply.
Sediment Management in Prado Basin and Lower Santa Ana River Greg Woodside, P.G., C.Hg Executive Director of Planning & Natural Resources September 20,
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Water Management of the Okanagan Lake Regulation System October 2015 Presented to the Osoyoos Lake Water Science Forum Shaun Reimer, P.Eng. Public Safety.
Weather Progression. Weather changes with time Follow a week’s weather Plan ahead for the best days.
City Council March 4, Introduction The UCRA recommends the development of a storm water storage basin just to the east of FM 1223, south of Avenue.
Environmental watering – How is it the same or different from floods? Denis Flett Chairperson, Victorian Environmental Water Holder Friday 14 November.
Our goal for today To gather broad, values-based input to inform future decisions about fish passage at Mactaquac Generating Station. Your feedback today.
Improving the Garment Sector in Lao PDR:
Third Grade Science and Social Studies
Mississagua Lake Chain Levels To August 19, 2017 & Projections for Climate Change in the TSW Reservoir Area Presentation to the Cavendish Community Ratepayers’
Drought in Minnesota Greg Spoden State Climatology Office
Impact of Data Releases
Baltimore.
Lake Chesdin VWP Permit 2012
Kootenai Basin Spring/Summer Operations for 2016
North Santiam Temperature Task Group W-FPOM
GIVEN GEOMORPHIC REGIME AND IMPACTS, WHAT IS REQUIRED?
2018 Annual Water Supply and Demand Assessment
Landforms and Water.
Potential Milestones A timeline to finish in one year
Instream Flows in the Spokane River
Fourth Grade Science and Social Studies
Alan F. Hamlet Andrew W. Wood Dennis P. Lettenmaier
Cowichan Lake and River status update
Mike Brandy Central Services 3/31/04
Alan F. Hamlet Andrew W. Wood Dennis P. Lettenmaier
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
National Weather Service Missouri Basin River Forecast Center Mid-West Electric Consumers Association Annual Meeting Water & Power Panel 11 December.
Forecast Verification
Kootenai Basin Spring/SummerOperations for 2016
Program Review Timeline (as of 2019)
Mountain A place on Earth’s surface that is much higher than the land around it.                                      
SWE 2.0 – Current Status of Standards

Adnan Akyuz, Ph.D. NDSU, AES State Climatologist Updated 9/28/2017
Presentation by Brian Houle
Science and Social Studies
Presentation to CCRAI June 22, 2013 By
TGn Closing Report – September 24 ‘09
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Habitat Changes and Fish Migration
Overview of the TSW And Review of 2019 Winter and Spring Weather and Water Management Across the TSW Reservoirs with Focus on Mississagua Lakes CCRAI Meeting.
Habitat Changes and Fish Migration
Resource Management and Climate Protection Committee Meeting:
Presentation transcript:

Presentation by Graham Kissack Cowichan Watershed Board Meeting – Review of conditions at lake Cowichan July 30, 2018, Presentation by Graham Kissack

Aerial view of Lake Cowichan Weir

Projection shows inadequate inventory

Release of water from lake

Weather Forecast for coming week shows hot dry weather Weather Forecast for coming week shows hot dry weather. Rainfall not expected to return until mid to late October

July / August /September Forecast

KWL projections (@ 10%ile summer) Pumping estimated to begin on Sep 12 @ 5.5 cms OR Sep 19 @4.5 cms

KWL projections (@ 2017 summer) Pumping estimated to begin on Oct 4 @5 KWL projections (@ 2017 summer) Pumping estimated to begin on Oct 4 @5.5 cms OR Oct 25 @4.5 cms

Actions moving forward Consider further flow adjustments – 5.5 cms down to 4.5 cms beginning as early as Aug 1 Catalyst to prepare for potential pumping of water using negative storage. Unproven solution: Not yet approved by FLNRO or DFO Impact on Vancouver Island Lamprey? Impact on waterfront properties? Catalyst to apply for authorization to steward the fish and fish habitat of Lake Cowichan shoreline with specific focus on the SARA listed Vancouver Lamprey Province to conclude the 10 year license for pumping water from lake to river to ensure this action is available if needed