STF430 Final Report Summary Gyorgy Rethy STF Leader
Project details 7 ETSI member supported the STF 2011.04.19 –2011.12.31 (78 mDays, all used up) Members: Gyorgy Rethy, Ericsson Jens Grabowski, University of Goettingen Ina Schieferdecker, Fraunhofer FOKUS Jacob Wieland, TestingTech Sessions 24–27 May 2011 27 June–01 July 2010 26–30 September 2010 28 November–02 December 2010
Scope - 1 Maintenance and new features, existing standards, ES 201 873 TTCN-3 Part-1: Core Language V4.3.1 TTCN-3 Part-4: Operational Semantics V4.2.1 TTCN-3 Part-5: TTCN-3 Runtime Interface V4.3.1 TTCN-3 Part-6: TTCN-3 Control Interface V4.3.1 TTCN-3 Part-7: Using ASN.1 with TTCN-3 V4.3.1 TTCN-3 Part-8: Using IDL with TTCN-3 V4.3.1 TTCN-3 Part-9: Using XML with TTCN-3 V4.3.1 TTCN-3 Part-10: TTCN-3 source code doc. V4.3.1
Scope - 2 New Extension packages Maintenance and new features, existing extension packages ES 202 781 TTCN-3 Extension: Configuration and deployment V1.1.1 ES 202 782 TTCN-3 Extension: Real-Time and Performance Testing V1.1.1 ES 202 784 TTCN-3 Extension: Advanced Parameterization V1.2.1 ES 202 785 TTCN-3 Extension: Behaviour Types V1.2.1 New Extension packages TTCN-3 extension: Continuous Signal support TTCN-3 extension: Advanced TRI
Interim version TTCN-3 Part-1: Core Language V4.3.2 24 CRs resolved and included See list of CRs in TD MTS(11)0056 TTCN-3 Part-9: Using XML with TTCN-3 V4.3.2 9 CRs resolved and included
Final deliverables -1 ES 201 873 TTCN-3 Part-1: Core Language V4.4.1 46 CRs resolved and implemented (in addition to the interim version) TTCN-3 Part-4: Operational Semantics V4.4.1 no “own” CR, synchronization with the other parts TTCN-3 Part-5: TTCN-3 Runtime Interface V4.4.1 2 CRs resolved and implemented TTCN-3 Part-6: TTCN-3 Control Interface V4.4.1 8 CRs resolved and implemented TTCN-3 Part-7: Using ASN.1 with TTCN-3 V4.4.1 1 CR resolved and implemented TTCN-3 Part-8: Using IDL with TTCN-3 V4.4.1 TTCN-3 Part-9: Using XML with TTCN-3 V4.4.1 12 CRs resolved and implemented (in addition to the interim version) TTCN-3 Part-10: TTCN-3 source code doc. V4.4.1 All parts have been delivered, AbC introduced on 19th Dec. 2011 See detailed CR list at http://t-ort.etsi.org/view_all_bug_page.php
Final deliverables -2 Existing extension packages TTCN-3 Extension: Configuration and deployment No CR resolved (1 CR pending) TTCN-3 Extension: Real-Time and Performance Testing No CR received TTCN-3 Extension: Advanced Parameterization TTCN-3 Extension: Behaviour Types New extension packages TTCN-3 extension: Continuous Signal support Delivered (TD MTS(12)000001) TTCN-3 extension: Advanced TRI Delivered (TD MTS(12)000002)
Other TTCN-3 User Conference 3GPP TB MTS Presentation has been held at the TTCN-3 User Conference 2011 in Bled („ TTCN-3 Language Maintenance and Evolution“) 3GPP During its sessions, STF430 has participated on STF160‘s regular phone meetings with TTCN-3 tool vendors Continous contact and discussions via e-mail and direct phone calls with STF 160‘s experts TB MTS The STF‘s work progres was reported on MTS#54, 04-05 October 2011, Tallin (TD MTS(11)0055) STF work (list of resolved and progressed CRs) is sent on the MTS-GEN mailing list