Cafeteria exit exit Entrance to media lobby 12

Slides:



Advertisements
Similar presentations
Created by: Theresa Hardy My School Its Location.
Advertisements

Crescent Academy International
Drydock Inside Lobby. Hallway into Party Room Lobby Chandelier.
Welcome To The New Ebenezer Baptist Church Located at 1200 & 1236 Gregg Street & 1921 Lady Street.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
Upper Level Copy Room Office Sanctuary Pastor’s Study To Epworth House Kitchen-Acolyte Lobby Courtyard Wesley Room Prayer Room Janitor Storage Nursery.
Current Project Update October 25th 2012 Good Evening!!!
September 21 Update. Future Main Entrance (looking south)
Perspective View 5420 Grosvenor Lane RENEWABLE NATURAL RESOURCES CENTER Bethesda, Maryland.
Glenvar High School Renovations School Board Presentation
Key Cafeteria Entrance/ Exit Office Library Classrooms Bathrooms Playground Gym Girl’s Bathroom Girl’s Bathroom Mrs. Baudoin’s Room Mrs. Broussard’s Classroom.
Cost of Building: $30 Million Completed: Spring 2005.
Bar joist over kitchen and band room. Setting bar joist over kitchen and electrical/mechanical rooms.
Scale Drawings & Models
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
ADDITION & REMODEL Eugene Field Elementary School.
A LL D ULLES A REA M USLIM S OCIETY. ADAMS CORE VALUES.
Layout as at 1 st July 2007 Public Rooms Offices/Reception Museum Cafe Friends of Museum Shop Physiotherapist Art Exhibition Staff Room Library.
POV Renovations November 14,2014. Repairing the East Wall.
THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.
Family Life Center / Youth Center 201 Music Office 216 – 217 Children’s Classroom 202 – 203 future use 218 Kid’s Klub 204 old sanctuary 219 – 220 Storage.
Learning, Health, and Safety Capital Project Alternates and Change Order
Counter & Cabinets Counter Cabinet Office Women Men Kitchen Area Dining Entrance ~30 FT ~80 FT Approximate Sizes – Not to Scale.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Planning Living Areas. What is a Living Area? Living Room Dining Room Family Room Entryways.
21 st Century Classroom Learning Environment Installation Process.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
Camila Hernandez Leidy Gonzalez Marcela Ojeda Period 3
IN THE EVENT OF FIRE OR YOU ARE DIRECTED TO EVACUATE THIS BUILDING
Holy Family Tour “As it Pertains to X-ray”
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Allen Bond Proposal Components and Descriptions September 12, 2017
2226 N Tuckahoe Street, Arlington Virginia
EPHS - FIRST LEVEL ROOM MAP NOTE: INFORMATION/HELP DESK IS ON THE
My School Monaco Elementary by W.Dowd.
Building Committee April 20th, 2016.
DREAM HOUSE Maydi Perez Nataly Mora P:5.
H A L L x x X = IN CASE OF FIRE DO NOT ENTER ROOMS x x x x x x x
Main entrance To the hall.
Lesson 2 Level I Looking for Signs
Columbus State Community College
Capital Improvements Presentation
Hazel Green’s Guidelines To Success
From Lobby Entrance: Circulation Desk with proposed café area to left
Gérard Philipe Middle School
Robot Game Fields Queuing Entrance.
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
M3 Zoned  Enterprise Zone Benefits  Located in Federal Hub Zone
Campus Ministry Accessibility
Room Planning, and living area
EPHS - FIRST LEVEL ROOM MAP NOTE: INFORMATION/HELP DESK IS ON THE
Right Lung Left Lung HEART
Summer 2017 Projects DV Campus.
HISD Educational Learning Center STAFF PARKING Yellow Tag LOT
Special Valuation 1017 W First Avenue Odd fellows Hall/Montvale Event Center Commercial.
Student Handbook Review: Coming and Going
Welcome to Harold C. Urey Middle School
Cafeteria Entrance to media center
HISD Educational Learning Center
Kincaid Elementary School
Special Valuation 1017 W First Avenue Oddfellows Hall/Montvale Event Center Commercial.
BY HERBER.
Recent Bond Accomplishments
WES Renovation Update Photo Gallery
MAKING WARNING SIGNS FOR THE SCHOOL
Student Center and Fitness Center Catholic High School
Model presentation How to do it.
HATCH ELEMENTARY SCHOOL
ROOM OUTLINE FOR NORTH AND SOUTH WINGS
Dining Services RFP - Building Floor Plans
Presentation transcript:

Cafeteria exit exit 2 3 4 5 6 7 8 9 10 11 1 Entrance to media lobby 12 elec exit elec elec 2 3 4 5 6 7 8 9 10 11 1 elec Entrance to media lobby 12 32 33 34 35 36 37 38 39 40 2 ft gap elec elec elec 31 elec 49 13 48 47 46 45 44 43 42 41 Cafeteria 30 14 elec 29 elec 50 51 52 53 54 55 56 57 58 2 ft gap 15 elec elec elec 28 Entrance to media lobby 67 66 65 64 63 62 61 60 59 16 elec 27 17 elec 26 18 Entrance to kitchen 25 24 23 22 21 20 19 exit elec elec elec

LIBRARY MEDIA CENTER Exit Exit Exit Restrooms Band Table 86 87 elec 88 89 elec 90 elec 91 92 93 elec elec 97 96 95 94 79 80 85 98 99 100 101 78 81 84 elec 77 82 83 elec 102 103 Exit Exit Café entr 68 Café entr 69 70 71 72 73 74 75 76

Hallway Doors to Media Lobby Doors Ladies Rest Room Class Room elec outlet inside library door 104 105 106 107 108 109 110 Spaces are wider than 8x8, make them 9x7 or 10x6 Spaces are wider than 8x8, make them 9x7 or 10x6 Doors to Media Lobby Hallway Doors 111 112 Class Room Ladies Rest Room Office Men’s Rest Room Main Entrance

Gym G1 G2 G3 G4 G5 G6 G7 G8 8 ft G23 G24 G25 G26 G27 G28 G29 G30 G9 Door G1 G2 G3 G4 G5 G6 G7 G8 3 ft Gym 2 feet Elec plug Door 8 ft G23 G24 G25 G26 G27 G28 G29 G30 G9 2 feet G22 G33 G32 G31 G37 G36 G35 G34 6 ft G10 G21 G38 G39 G40 G41 G42 G43 G44 G11 10 ft G20 G51 G50 G49 G48 G47 G46 G45 Door 8 ft 2 feet Door G19 G18 G17 G16 G15 G14 G13 G12 3 ft