François Rancy Director, ITU Radiocommunication Bureau

Slides:



Advertisements
Similar presentations
IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
Advertisements

An Introduction to the ITU
Telecommunications Technology Association 29/04/2003GSC-8, OTTAWASlide 1 Identification of Agenda items of WRC that are of interest to PSO As of April,
Review of ITU-R Study Group Activities Kevin A. Hughes Radiocommunication Bureau.
Fostering worldwide interoperabilityGeneva, July 2009 IMT Standardization activities Colin Langtry, Radiocommunication Bureau, ITU Global Standards.
Research Activities of IMT-2020 (5G) Promotion Group
WRC-2003 Mike Goddard Spectrum Policy and International Director Radiocommunications Agency.
Review of Study Group Activities Kevin A. Hughes Radiocommunication Bureau.
Sg-whitespace SubmissionRashid A. Saeed, Telekom MalaysiaSlide 1 February 2009 Slide 1 Work in the ITU: Focus on how 802 can best leverage.
Committed to Connecting the World For the last 25 years, ITU has been coordinating the development of a global broadband multimedia international mobile.
12/11/2015 IMT-2000 Developments in ITU-R Progress Report F. Leite, ITU-R 1GSC-9, Seoul SOURCE:ITU-R TITLE:IMT-2000 Developments in ITU-R AGENDA ITEM:4.1.
1 WP2: Communications Links and Networking – update on progress Mihael Mohorčič Jozef Stefan Institute.
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
CEPT positions for WRC-15 Mr. Alexander Kühn CPG-15 Chairman October 2015.
Submission doc.: IEEE /0127r0 January 2016 Joseph Levy (InterDigital)Slide 1 ITU-R IMT-2020 Status Date: Authors:
RADIO FREQUENCY SPECTRUM POLICY NOVEMBER Making South Africa a Global Leader in Harnessing ICTs for Socio-economic Development 2 WHAT IS SPECTRUM?
Key results of World Radiocommunication Conference (WRC-07) DOCUMENT #:GSC13-GRSC6-12 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:GRSC 8 CONTACT(S):Kevin.
Submission doc.: IEEE /0156r0 January 2016 Joseph LEVY (InterDigital)Slide 1 IMT-2020 Discussion Review and Straw Polls Date: Authors:
Role of World Radiocommunications Conference and European preparations for WRC Stella Lyubchenko 4 th CEPT Workshop on European Spectrum Management and.
Vientiane, Lao People’s Democratic Republic, July 2012 ITU-R Standardization Activities Colin Langtry, Chief, BR Study groups Department
Activities of the Radiocommunication Sector Arab Regional Development Forum on Broadband in the Arab Region: Challenges and Opportunities Tunis-Tunisia,
G Technologies for 5G SC Date: Authors: March 2016
ITU-R Study Groups Porto Seguro November 2005 Porto Seguro November 2005 K. A. Hughes, Head, SG Dept, ITU-BR ITU Radiocommunication Seminar.
Decisions of RA-15 and WRC-15 with Special Relevance to Developing Countries Решения AR-15 и ВКР-15 в особенности касающиеся развивающихся стран Иштван.
CRAF POSITION ON WRC-19 AGENDA ITEMS RELEVANT TO RADIO ASTRONOMY Talayeh Hezareh - CRAF FM Max Planck Institute for Radio astronomy Bonn, Germany MAY 20,
Yerevan, Republic of Armenia, 27 June 2016ITU Regional Workshop for CIS and Georgia Place and role of radiocommunications in the information society François.
Inter-American Telecommunication Commission (CITEL) November 4, 2016
Inter-American Telecommunication Commission (CITEL) November 4, 2016
CEPT Conference Preparatory Group
Delivering the standards and spectrum to fuel 5G
PRESENTATION OF MONTENEGRO
broadband applications, in accordance with Resolution 233 (WRC-12)
Mario Maniewicz Deputy Director, Radiocommunication Bureau
Cindy Cook Chairman, TG 5/1 November 2, 2016
HEADING FOR SLIDE Sub Heading
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
ITU Working Party 8B Activities
Challenges and opportunities for CEPT
Month Year doc.: IEEE yy/xxxxr0 November 2017
ITS-Related Work Items in ITU-R Study Group 5, Working Party 5A
5G - IMT-2020 Technology.
CEPT ECC Vice Chairman Jaime Afonso
Werner Mohr, Siemens Networks, Munich, Germany
WRC-12 A.I. 1.3 Eric ALLAIX DGAC-DSNA.
5G and IMT Identification - Views from CEPT-
doc.: IEEE <doc#>
Doriana Guiducci, European Communications Office
Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
ITU Radio Issues in 2003 Progress Report ITU-R GSC /01/2019
Delivering effective 5G/IMT-2020 service implementation economically
François Rancy Director, ITU Radiocommunication Bureau
SADC WRC-15 5th Preparatory Meeting
Draft ICAO Position for ITU WRC-19
Postal & Telecommunications Regulatory Authority of Zimbabwe (POTRAZ)
Sergio Buonomo Counselor ITU-R Study Group 5
IMT-Advanced Technical Requirements
François Rancy Director, ITU Radiocommunication Bureau
Update of ARIB Activities on IMT Standardization
Status report from ITU-R WP 5A on ITS activities
TTA activities on IMT Standardization
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Regulatory Update in Europe for Gigabit Application.
Activities of ARIB on IMT Standards
Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY
Possible Future Agenda Items
Agenda Item Overview & draft India proposal
ITU Update since GSC-13 Global Standards Collaboration (GSC) 14
GSC position on key WRC-19 AI 1.5 ESIMs
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
François Rancy Chairman, ITU Special Committee
Presentation transcript:

François Rancy Director, ITU Radiocommunication Bureau Safeguarding 5G and the Future of Mobile at WRC-19 François Rancy Director, ITU Radiocommunication Bureau MWC, Barcelona - 26 February 2018

Both require global collaboration DRAFT FINANCIAL PLAN 2020 - 2023 Both require global collaboration Spectrum Standards Both need to be globally harmonized FP 2020-2023 - January 2018

Mobile spectrum allocations and IMT identifications Standards ITU WRC Process Mobile spectrum allocations and IMT identifications ITU membership, ITU-R Study Groups, Regional Groups, International organisations Member States driven ITU-R Study Group 5 Process IMT-2020 Vision, overall requirements, radio interface specifications ITU membership, other standard making bodies Industry driven FP 2020-2023 - January 2018

IMT-2020 standardization process IMT-2020 spectrum allocation process 2/24/2019 IMT-2020 standardization process Development plan Market/services view Technology/ research kick off Vision - IMT for 2020 Name Process optimization Technical performance requirements Evaluation criteria Invitation for proposals Sharing study parameters (IMT-2020) Sharing studies in preparation for WRC-19 Technical proposals Evaluation Groups Methodology Consensus building Spectrum/band arrangements Decision & radio framework Detailed IMT-2020 radio specifications Future enhancement/ update plan & process IMT-2020 spectrum allocation process < 6 GHz Spectrum view ITU-R Study Group activities/studies Spectrum/band arrangements (post WRC-15) CPM Report (IMT- WRC-19) Sharing study reports Spectrum/band arrangements (WRC-19) Invitation to propose candidate radio interface technologies for IMT-2020 October 2017 Guidelines for both the procedure (methodology) and the criteria (technical, spectrum and service) to be used in the evaluation process November 2017 Submission of proposals for candidate radio interface technologies for the terrestrial components of the radio interface(s) for IMT-2020 November 2017 Independent evaluation groups started the assessment of the IMT-2020 radio interface technologies in October 2017, 11 groups active in February 2018 Deadline for submission of proposals : July 2018 Deadline for evaluation of proposals : December 2019 2012-2015 2016-2017 2018-2019 2019-2020 Setting the stage for the future: vision, spectrum, and technology views Defining the technology Allocate the spectrum

Usage scenarios of IMT for 2020 and beyond High traffic capacity, high peak data rate, high user data rate Above 24 GHz (WRC-19) Bridging coverage, capacity, mobility, data rate, spectrum efficiency 1 GHz to 6 GHz Three main usage scenarios for IMT-2020 have been identified in Recommendation ITU-R M.2083, “IMT Vision – Framework and overall objectives of the future development of IMT for 2020 and beyond,” which are enhanced mobile broadband, ultra-reliable and low latency communications, and massive machine-type communications. Additional use cases are expected to emerge, which are currently not foreseen. For future IMT, flexibility will be necessary to adapt to new use cases that come with a widely varying range of requirements. IMT-2020 will encompass a large number of different features. Depending on the circumstances and the different needs in different countries, future IMT systems should be designed in a highly modular manner so that not all features have to be implemented in all networks. This figure illustrates some examples of envisioned usage scenarios for IMT-2020. Coverage, mobility, connection density, improved data rate, spectrum efficiency Below 1 GHz

WRC-19 AI 1.13 sharing & compatibility studies Selected frequency bands 24.25 GHz 86 GHz Incumbent services Mobile-satellite Radionavigation-satellite service Fixed-satellite Broadcasting-satellite Radio astronomy Space research Earth exploration-satellite Inter-satellite Earth exploration-satellite (passive) Space research (passive) Fixed Mobile – Multiple gigabit wireless systems Aeronautical mobile Radiodetermination Focus on 24.25 – 27.5 GHz 37 – 43.5 GHz 66 – 86 GHz Mobile service IMT-2020

Thank You for your attention