FIRELEC Migration Solution

Slides:



Advertisements
Similar presentations
Lockout/Tagout Awareness Training
Advertisements

Legacy Hardware and Software Upgrade Overview
Cisco 6500 E-Series Chassis Up-grade
DS1000B-RM/ DS1500B-RM Battery Replacement Procedure.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
This document is the property of Firelec. No copy, even partial, allowed without prior writen authorization. FIRELEC Migration Solution Don't let wiring.
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
ESTEC Test Centre Division Directorate of Technical and Quality Management HYDRA PLC Replacement Debriefing Meeting.
CONSOLIDATION OF THE CONTROL SYSTEM OF THE SUBU CHEMICAL POLISHING MACHINE TE-VSC-ICM Automation Forum João Rodrigo Alvelos Ferreira 20th November 2014.
Control Activity & Industry Services
1 Lesson 4 Computer Maintenance Computer Literacy BASICS: A Comprehensive Guide to IC 3, 4 th Edition Morrison / Wells.
Chapter 7Assembling Your Own Computer System  7.1Assembling the Hardware 7.1Assembling the Hardware 7.1Assembling the Hardware  7.2Installing the Operating.
1 Exercise 1 Computer Hardware. 2 Objectives for Exercise 1 When you complete this exercise, you will be able to:
SSIS Over DTS Sagayaraj Putti (139460). 5 September What is DTS?  Data Transformation Services (DTS)  DTS is a set of objects and utilities that.
Hardware Troubleshooting Chapter 20 Release 22/10/2010powered by dj.
Lesson 14: Installing and Uninstalling Programs how to install a new program what to do if the new program doesn’t work how to uninstall a program © CCI.
Assessment Outcomes 2 and 3 Russell Taylor. Assessment Outcome 2 Set-up an operational computer system with a range of computer hardware Practical & Theoretical.
1 Chapter Overview Publishing Resources in Active Directory Service Redirecting Folders Using Group Policies Deploying Applications Using Group Policies.
Marketing Department Industrial Automation Business Headquarters Yokogawa Electric Corporation ISD-MASP-S05043 Copyright © Yokogawa Electric Corporation.
Chapter 3: Resistive Circuits ©2001, John Wiley & Sons, Inc. Introduction To Electric Circuits, 5th Ed Chapter 3 Resistive Circuits.
This document is the property of Firelec. No copy, even partial, allowed without prior writen authorization. FIRELEC Migration Solution Don't let wiring.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
PS1500B Battery Replacement Procedure. 1.Pull off the front panel.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Computer Hardware Maintenance & Repairs Computer Hardware Maintenance & Repairs Suleiman Mohammed (mncs,mcpn) Instructor Institute of Computing & ICT,
PA 6000 MCA IV/MCM II. Objectives Product Features Components Mechanical Adjustments Replacement Procedures Maintenance System Backup/Restore Firmware.
/10 FIRELEC Migration Solution This document and the information therein are the property of FIRELEC and shall not be copied or communicated to a third.
60kW Thermosiphon control system
Welcome Deep Dive IP Office – part II
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Field Replaceable Units, Common Problems, and Flowcharts.
RS3-FIM series Migration Don't let wiring costs prevent you from upgrading an RS3 FIM series system to a DeltaV system This document is the property of.
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
Enterprises systems : Enterprise Wireless Network Solution Provider
A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.
Moving to Configuration Manager Current Branch
C1300 advanced circular chart recorder
This picture shows what the wiring of a new alternator looks like
ABT-EC EYETS Activities 2nd reports
IC3 GS3 Standard COMPUTING FUNDAMENTALS Module
Computer and Information Technology for HKCEE
Fujitsu Training Documentation Hardware Installation
K TO 12 CHS MODULE FOR GRADE 9, PP
LCLS-II Cryoplant Controls Readiness to Procure
Installation Plan Checklist
FIRELEC Migration Solution
How to Fix HP Printer Ink System Failure 0xc19a0042
Chapter 22 Building Automation System Retrofit of Existing Systems
SC1R Cold Box PDR Controls
Programmable Logic Controllers (PLCs) An Overview.
FIRELEC Migration Solution
FIRELEC Migration Solution
Systems Design, Implementation, and Operation
Lesson 4 Computer Maintenance
Business Continuity Technology
FIRELEC Migration Solution
Body Electrical System
Unit 2 Computer Systems HND in Computing and Systems Development
FIRELEC Migration Solution
FSR 06 — plant & EQUIPMENT isolations & lockouts
FIRELEC Migration Solution
1.11: Robot Controller.
FIRELEC Migration Solution
Electrical components and systems
Replacing TrueAir Thermostat with Ecobee SI
Field installable, upgradeable and scaleable
Required “Copy Properties” option in 3D Model Sketch
Presentation transcript:

FIRELEC Migration Solution Don't let wiring costs prevent you from upgrading a PROVOX™ 20-Series system to a DeltaV™ system This document is the property of FIRELEC. No copy, even partial, allowed without prior writen authorization.

PROVOX™ 20 series > DeltaV™ Using IOPs FMS-PVXCL-DV-1 PROVOX™ 20 series > DeltaV™ Using IOPs No existing PROVOX™ hardware is kept (I/O File – I/O card – I/O panel – I/O cable) Existing PROVOX™ I/O panels are replaced by new IOPs which are electrically and mechanically fully compatible Existing wiring is kept in place Time for Hardware migration from an old toward a new I/O panel : about 30mn per panel I/O card and I/O panel to be removed

FMS-PVXCL-DV-1 Hardware to be removed PROVOX™ Highway to be removed Primary PROVOX™ Highway Secondary PROVOX™ Highway SR90 or SRx Controller to be removed SR90 or SRx Controller CP6701 Power supply and Communication Cards to be removed 1 - 14 I/O cards 20 series to be removed I/O Termination panel I/O cables to be removed I/O Termination panel I/O Termination panel I/O panels to be removed Process I/Os stay in place in the existing cable trays Process I/Os

Hardware to be installed FMS-PVXCL-DV-1 Hardware to be installed Secondary DeltaV™ Highway Cntrl PS I/O1 I/O2 I/O3 I/O4 I/O5 I/O6 I/O7 I/O8 Primary DeltaV™ Highway The new DeltaV™ architecture is installed The new IOPs are installed using the existing mechanical structure of the cabinets (30 mn per panel) The new FIRELEC I/O cables are installed between IOPs and DeltaV™ I/O cards New I/O panel New I/O panel New I/O panel Process I/Os

Advantages FMS-PVXCL-DV-1 The main advantages of the IOPs panels for PROVOX™ migration are as follow : Existing wiring is just disconnected and reconnected without any change at the same place (same terminals with same labelling and same electrical features) The existing loop drawings are kept without any modification, allowing all maintenance processes and procedures to remain unchanged.