Meeting of Water Directors WFD Common Implementation Strategy

Slides:



Advertisements
Similar presentations
1 Update on progress in SOE-drafting group. 2 Water Directors Steering of implementation process Chair: Presidency, Co-chair: Commission Strategic Co-ordination.
Advertisements

European Commission, DG Environment Unit B.1: Water, the Marine and Soil TAIEX Seminar « Management of Water Resources: River Basin Management in the Baltic.
Component 5.2 Harald Marent, Veronika Koller-Kreimel, Austrian Ministry for Agriculture, Forestry, Environment and Water Management Edith Hödl-Kreuzbauer,
European Commission - DG Environment Unit D.2: Water & Marine 1 Need for continuous exchanges on chemical monitoring issues, in the light of the on-going.
Water.europa.eu Draft mandate WGE Chemical Status WG E Priority Substances 8-9 October 2009 Jorge Rodriguez Romero Madalina David DG Environment, European.
EU Update/CIS England WFD Stakeholder Forum 4 April 2008.
CIS Work Programme WFD Team, DG ENV.D.2, European Commission.
Pilot River Basin Network: Environment Directorate
New Work Programme and mandates 2005/2006
Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – WFD CIS SCG meeting of 11 March 2009.
Philippe Quevauviller, Johannes Grath
Italian Water Directors Meeting
WFD update September 2009 Andrea NÁM
Agenda item 6e) Update on progress elaboration of Article 4.7 Guidance
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
Chemical Monitoring Activity (CMA)
Strategic Co-ordination group “Integrated River Basin Management”
Marine Strategy Status
CIRCA Accessibility Strategic Coordination Group,
Water Directors’ Meeting Common Implementation Strategy
CIS Work Programme WFD Team, DG ENV.D.2, European Commission.
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
Change and adapt the Eionet water data flow to meet WFD requirements
Chemical Monitoring Activity (CMA) ( )
Draft Work programme / revised mandate for WG F
EU Marine Strategy DG Environment B.1.
Draft Mandate and Proposed Approach for the Drafting Group on
Meeting of Water Directors Eutrophication Guidance
New mandates for Working Groups A, C and D including GIS
Meeting of Water Directors Future Work Programme of the CIS
Project 2.7 Guidance on Monitoring
The Common Implementation Strategy – an overview
Research as a new activity of the CIS WG 2B
Strategic Co-ordination Group
Meeting of Water Directors 2/3 December 2004
WG 2.B Integrated River Basin Management
WFD and Hydro-morphology
Water Directors’ Meeting Working Group D (Reporting) activities
Objectives General objectives Exchanges of knowledge and information on groundwater issues and preparation of specific guidelines in support of the implementation.
Introduction Prep-SCG meeting 13 Sept 2013.
WFD and Agriculture Activity under the CIS 2005/2006 Work Programme
Work Programme of the CIS
Water scarcity and droughts Expert Network Progress Report
Integrated Testing in Pilot River Basins
Commission's activities
Strategic Coordination Group 2007 Reporting Guidance on Monitoring
Part I.
CIS work programme Supporting the implementation of the first river basin management plans Water Directors' Meeting 30 November and 1 December.
Common Implementation Strategy for the Water Framework Directive
Legal issues and compliance checking in WFD implementation SCG meeting 5-6 November 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European.
Organisation Water Directors Strategic Co-ordination Group
European Commission activities
Agenda item 2.1 – Overall Progress Report
7.e) Expert Group on agriculture
EU Water Framework Directive
Directive on the assessment and management of flood risks - towards implementation SCG, By Maria Brättemark, European Commission, DG Environment,
Water Science-Policy Interface (CIS-SPI) Progress report
WG C-1 activity Berlin – 3 May 2007
EIONET and EUROWATERNET Common Implementation Strategy
Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Work Programme : Strengthening EU Water Policy through the 2nd River.
Concept paper on the assessment of WFD River Basin Management Plans
Activity on Eutrophication
Planning to develop the CIS Work Programme
Working Group C & CMA ( ) Tasks / Deliverables
EU Water Framework Directive
On-going research in support of science-policy interfacing -
Brussels – 20 April 2007 European Commission - DG Environment
SCG May 2005 CIRCA review.
EU Water Framework Directive
History EU+Norway Water Directors meeting in Paris Oct 2000 Member States and the European Commission agreed in Paris to developed a Common Strategy.
Presentation transcript:

Meeting of Water Directors WFD Common Implementation Strategy 2/3 December 2004 Agenda item 3.1 – WFD Common Implementation Strategy New Work Programme 2005/2006

Introduction New work programme should built on the ongoing work and the experiences of the past two years New priorities addressing challenges following the analysis and towards the river basin management plans No major re-organisation, rather adaption of structure to emerging needs Version 1.0 presented to SCG, no major comments, all written contributions incorporated No outstanding issues

Key priorities Intercalibration Pilot river basins Integrated river basin management focusing on key issues (art. 5 and research, cost-effectiveness, water scarcity) Groundwater (information exchange and focus on monitoring) Reporting / WISE / GIS Priority substances (all techincal aspects of Article 16) Flood protection Environmental objectives Transboundary river basin management Integration (inclusion of hydropower and navigation)

Organisational issues Overall, the structure is maintained and the four existing Working Groups should continue (note change of numbering for simplification) Additionally: Strategic Steering Group for WFD/AGRI EAF Flooding GIS Expert Network as sub-group of WG on reporting Question on whether to keep EAF Priority Substances or convert into a Working Group following the finalisation of the COM proposal Sub-group on chemical monitoring to be decided at a later stage

WFD Common Implementation Strategy New organisation 2005/2006 Water Directors Steering of implementation process Chair: Presidency, Co-chair: Commission Expert Advisory Forum “Flood Protection” Strategic Steering Group “WFD and Agriculture” Strategic Co-ordination Group Co-ordination of work programme Chair: Commission Art. 21 Committee Working Group A “Ecological Status” Working Group C “Groundwater” Working Group E “Priority Substances” “Chemical Monitoring” “Chemical Monitoring” Working Group B “Integrated River Basin Management” Working Group D “Reporting” "GIS” Expert Network Stakeholders, NGO’s, Researchers, Experts, etc.

Draft Conclusions Water Directors are invited to: Agree priorities and new adapted structure Endorse main part of new WP 2005/2006 (chapters 3, 4 and 5) for publication together with progress report Annex 1 – mandates to be discussed and agreed separately