Transmission Workgroup June 7th 2012

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Transfer & Trades Special Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Mod Clarifications Transmission Workstream 6 August 2009.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Gas Transmission Charging Review: Final Capacity Charging Proposal Gas TCMF 14 th December 2006.
Details of demand management options
Transmission Workstream 6 January 2011
Proposer: Matthew Hatch Panel Date: 20/10/16
Entry Capacity Overrun price calculation
Modification Proposal 0283 Update
Manifest Errors for Entry Capacity Overruns Workgroup 364
Exit Capacity User Commitment – Transmission Workstream update
Transmission Workgroup 4th October 2012
Transmission Workstream 4th July 2007
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
UNC Modification Proposal 0373
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
Discussion on Mod262 and next steps
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
PARCA Security and Termination Amounts
UNC 0621L: Amendments to Gas Transmission Charging Regime
7th July 2011 Transmission Workgroup - Elexon
Enduring Offtake Arrangements (Including an alternative daily interruptible capacity release mechanism to facilitate use of spare capacity) Peter Bolitho.
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Transmission Workgroup 6th March 2014
MOD National Grid NTS Initiated Flow Swaps
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – User Pays Options Review Group August th November.
Modification 501 slides for Workgroup
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Long Term Non Firm Capacity Update
MOD Deemed applications – User pays initial thoughts.
UNC Transmission Workstream 7th December 2006
Proposed Transitional Gas Exit Arrangements
Transmission Workstream 2nd December 2010
UNC 0621L: Amendments to Gas Transmission Charging Regime
Entry Overrun Calculation
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Optimisation of Entry Capacity Modification Proposal
Information Provision for Transitional Exit Capacity
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
IECR Incremental Step Size
195AV “Future work” – system flexibility
Exit Overruns in the Enduring Regime
Entry Capacity Transfers - Constrained Period
Transmission Workstream 05 November 2009
Presentation transcript:

Transmission Workgroup June 7th 2012 Mod 426 - Entry Overruns Transmission Workgroup June 7th 2012

Issue At present, under certain circumstances, a User may deliver gas at an ASEP, above their capacity holdings, and not incur an entry overrun charge This weakens the financial incentive for Users to purchase sufficient capacity to cover their gas flow requirements and may undermine the “ticket to ride” principle Flows in excess of capacity may reduce the efficiency and economic management of the NTS as capacity bookings become less of a proxy for actual flow Issue compounded at ASEPs, where only interruptible is released (with a zero reserve price)

Currently Zero Entry Overrun Charge may occur on any Gas Day where all Entry Capacity at an ASEP is booked at zero price no Entry Capacity is booked at that ASEP The entry overrun charge is highest of either 8*highest bid price paid in any entry capacity release mechanism for that ASEP 1.1 x the top 25% accepted offer price, forward price or exercise price 1.1 x the highest unit price

Entry Overruns Per Month incurring zero charge or where no there is no capacity booked Year Entry Overruns 2008 34 2009 9 2010 27 2011 6 2012 (up to March) 1 No obvious trends

Approach Modification raised to: add 8* current MSEC firm reserve price at that ASEP as a bottom stop to the existing overrun calculation to act as a default price where there are no capacity bids or the bids are allocated at zero price keep the change simple and focussed further align Entry overruns with the Exit overrun calculation

Previous Mod 119 - Amendment to the Entry Overrun Charge (raised in 2006) to add the highest reserve price to the existing calculation to reduce the likelihood of the application of a zero overrun price to change the top 25% average highest accepted offer, forward or exercise price to negate the possibility that a User could incur more revenue from the surrender of capacity than the resulting overrun charge if the User did not change its flows in accordance with the accepted buy back offer Modification 119 was rejected in part due to insufficient evidence of Users being incentivised to offer back their NTS Entry Capacity and not appropriately reduce their flows

Benefits Strengthens the incentivise on Users to book capacity consistent with flows upholding the “ticket to ride” principle Provision of more accurate Entry Capacity may lead to more efficient operation of the pipeline system Facilitates competition in booking Entry Capacity Removes potential discrimination to Users booking sufficient capacity to cover their flow requirements Removes the issue where only interruptible capacity with zero reserve price is released at any ASEP

User Pays Split Propose Transporter 50% / Entry Shippers 50% Seeking views on how the Entry Shippers 50% is apportioned Entry Capacity holdings as at implementation date Entry flows as at implementation date Or a more appropriate suggestion / apportionment ?