Work Hours: Monday – Saturday, 5:00 a.m. – 3:30 p.m.

Slides:



Advertisements
Similar presentations
Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
Advertisements

Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
Administration & Finance November 18, 2014 Utility Corridor and Roadway Relocation Project Update (UCRR)
McCauley Street Ransom Street Brookside Drive Western Section: Cogeneration Plant to Ransom Street Western Section: Cogeneration Plant to Ransom Street.
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
1 Mission First – People Always – America Forever Base Wide Natural Gas Outage GAS OUTAGE: DATE: TUESDAY 19 SEPTEMBER 2006 TIME: HOURS LOCATION:
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
How would a truck get through? Any suggestions?. No parking allows access.
Roads & Traffic Department College Green Public Transport Priority measure.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Sustainability is Good for Business PRESENTATION TO GROUNDSKEEPING DEPARTMENT Sustainable Hotel Gardens.
Accommodation & Hospitality Services Team 2 February Team Meeting.
Campus Renewal Project Closing of Parkview Place Starting July 7 Date: May 27, 2014.
Urban Sprawl Government notices problems in the 1980s –Urban sprawl –Car ownership rising (1960: 113/ : 422/1000) –Little housing for low income.
Between the hours of 11.30pm and 7am you are not allowed to use your horn, during these times you can substitute your head lamps for the horn, for example.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
Presented by Ron Lane Deputy CAO, County of San Diego.
Caused by Environment Weather Conditions Curves, Hillcrests, Intersections Buildings, Bridges, Fences Trees, Bushes, Signs, Billboards.
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
Safety Signs. Traffic Light Ahead Slow down and prepare to stop.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 8 December 3, 2015.
2.2- Traffic Signals. Traffic Lights Green Light- GO – You can proceed only if the intersection is clear. When approaching a green light, check traffic.
Maintenance and Temporary Traffic Control
Basic Maneuvers Chapter Six. Moving into Traffic Visibility: check oncoming traffic and the road. Notice others Time: is there enough time to move into.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Dana Point Lantern District Del Prado Construction October 23, 2014.
Combined Public Consultation Treviglas Community College 3G Synthetic Pitch and Development of Colan Recreation Ground for NAFC.
What is a “no-show”? Contact Us!
MD 30 (Hanover Pike) at Mt. Gilead Road
Earhart Elementary September 2017
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
June 5, 2017.
West Chester Borough Master Parking Plan Framework
Col. Pike Multimodal: About the Project
Center City Connector 101.
Visitor Permits.
Parking Payment - Cash and all Major Credit Cards
Pedestrian & Bicyclist Crash Analysis
Draft Transportation Element September 6, 2017
Payroll Schedule PALATINE PARK DISTRICT EMPLOYEE PAYROLL SCHEDULE
General Tab Project, Cost Schedule, and Work Limits Roadway Character
April 20-22, 2018 At Oak Canyon Park Backside
Runners will line up on Erie, south of Marine Dr.
Thornbury Road new green-man cycle and pedestrian crossing
College West Residence Renewal Project
School Transportation Issues
Appeal Conditional Use Permit #6116 McKinley School 325 South Oak Knoll Avenue City Council February 29, 2016.
Kiosk Upgrade Project.
NAS Whidbey Island Gate Hours
Learn to Sail in 2 Days with Youth Chasewater
Parking Payment - Cash and all Major Credit Cards
Traffic Flow Improvement at the Gate 1
Steam Utility Replacement Project Description
Traffic Control Plan A plan directed to the safe and expeditious movement of traffic through construction and to the safety of the work force performing.
Proposed Driscoll Expansion Brookline, Massachusetts
Extended Christmas Hours Thursday December 8th 9am -6:30pm Friday December 9th 9am -6:30pm Saturday December 10th 9am-6pm Thursday December.
Swimming Pool Schedule
1. Where should buses run and with what frequency?
The Paterson Redevelopment
CODE OF CONDUCT Wastewater and faecal sludge operations is a professional occupation that requires education, training and experience. In this profession,
Utility Relocation: 11th/Mill
10 DAY PUBLIC NOTICE: Water Main
Presentation transcript:

Work Hours: Monday – Saturday, 5:00 a.m. – 3:30 p.m. WORK DESCRIPTION Relocation and installation of utilities and services Overnight, weekends may be required; affected businesses/residences will be notified in advance Accommodations made for Tempe major events IMPACTS TRAFFIC: Traffic lanes will be maintained in both directions with some parking and turn restrictions in place. Bike lanes will be shared with vehicles through the work zone. Pedestrian access will be maintained. NOISE: Every effort will be made to mitigate noise and lighting impacts to nearby residents during early morning hours. UTILITY: Some water services may be disrupted. Affected businesses and residences will receive separate notice in advance of shut off.