Seasons, capacity and funding

Slides:



Advertisements
Similar presentations
DRM Working Group FAO Rome
Advertisements

New Mexico Infrastructure Finance Conference, October 28, 200.
Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
IFRC Shelter Technical Training Yverdon-Les-Bains, Switzerland | 3 rd – 7 th March 2008 This session discusses the assistance methods and mechanisms for.
Shelter Training Château de Penthes, Geneva, 12th – 14th May 2008 based on content developed by This workshop explores the assistance methods and mechanisms.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by Climatic design This workshop will look the importance of understanding.
1 Emergency and Transitional Shelter Concepts. 2 Definition of terms 1.What is “emergency shelter”? 2.What is “transitional shelter”? 3.What are “household.
IFRC Shelter Technical Training Yverdon-Les-Bains, Switzerland | 3 rd – 7 th March 2008 This session describes the benefits of developing a strategic plan.
CLUSTER SPECIFIC CASELOAD 5 TARGET GROUPS 1 IDPS IN CAMPS – 20% OF FAMILIES= FAMILIES 2 IDPS OFF CAMPS- 80% OF FAMILIES =
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session identifies the six transitional reconstruction.
Mainstreaming Disaster Risk Management in Iraq
June, 2003 Poverty and Climate Change Reducing the Vulnerability of the Poor through Adaptation Poverty and Climate Change Reducing the Vulnerability of.
Disaster management B.V.L.Narayana / SPTM
UNITED NATIONS OFFICE FOR THE COORDINATION OF HUMANITARIAN AFFAIRS (OCHA) - Preparedness - Increase effectiveness of Disaster Response NATF/ACAPS Training.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This workshop will look at how to quantify the impacts of different.
Technical Components of Education in Emergencies.
FUNCTION 6 – CONTINGENCY PLAN, PREPAREDNESS AND CAPACITY BUILDING
May 6-7, 2011 Academy House, Seoul. Ecumenical Challenge 1. Immensity of disaster 2. Need for capacity building and training due to insufficient experience.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by This session will look at the impacts on response of climatic.
RS/GIS Techniques for Rehabilitation /Reconstruction.
Day 1 09:00 – 09:30 09:30 – 09:45 09:45 – 10:00 10:00 – 10:30 10:30 – 11:00 11:00 – 11:30 11:30 – 12:00 12:00 – 12:30 12:30 – 13:00 13:00 – 14:00 14:00.
SUBJECT 1. Basic Concepts in respect of disasters DAMAGE AND RECONSTRUCTION NEEDS ASSESSMENT MODULE.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session introduces the six transitional settlement options.
Follow up PDNA actions Chisinau, September 30, State Chancellery Government of Moldova.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This workshop aims at maximising participation in strategic.
Damage Overview Overall damages assessment Environment Productive Social Infrastructure Total Damage.
Key Words in disaster Management Dhammika Mahendre.
1 Caribbean Disaster Mitigation Project Implemented by the Organization of American States Unit for Sustainable Development and Environment for the USAID.
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
Developing a session plan S3.1 session day Text Dimension 40 Arial BOLD Position: Horizontal 5.44 Vertical 2.40 Text Dimension 24 Arial BOLD ITALICS Position:
CARE in Emergency Shelter and Reconstruction. 1. What is Our commitment to Shelter? 2. What impact does Shelter have? 3. What are the programming options.
S3.1 session day 3 3 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
Md. Nurul Alam. ◦ What is Disaster? ◦ Idea regarding various terminology used in Disaster Management.
Introduction to Workforce Planning
Sustainable Development, Resilience & Risk Management
Sustainable Shelter Solutions
A Presentation to the 2017 GEO Work Programme Symposium,
Paul Freeman, Leslie Martin Nov 15-16, 2001
Article by Caroline Moser
DISASTER VULNERABILITY, RISK AND CAPACITY
DISASTER MANAGEMENT.
Shelter Working Group Meeting Thursday 6 July, 10AM
Disaster Resilience: Pre-Event Planning for Recovery
Seminar of governmental experts Bonn, May 2005 ADAPTATION AND SUSTAINABLE DEVELOPMENT Presentation on behalf of the EU Outi Berghäll, Finland.
Disaster Management.
REGIONAL CONSULTATION MEETING ON THE DEVELOPMENT OF THE GLOBAL CLIMATE CHANGE ADAPTATION NETWORK IN LATIN AMERICA October 2009, Mexico City, Mexico.
LECTURE NO. 2 INTRODUCTION TO HAZARDS
Community-based disaster risk management --Empowering communities and local governments through SFs/CDD operations A presentation by Saroj Kumar Jha Program.
An Introduction To VDEM VDEM Director of External Affairs
55 Assessment, monitoring and evaluation
Climatic design This workshop will look the importance of understanding how climate variations will impact on planning and design Aceh, Indonesia, 2007.
Resource management This session will look at resource management, planning for changes in supply and demand and logistics Pakistan, 2006 (no notes)
Societal resilience analysis
Using law, standards & sector principles
Shelter and reconstruction options
Session 2.2. Purposes & Triggers of Trader Surveys
Seasons, capacity and funding
Re-establish Access to Basic Services
BIG LAUNCH! Urban Assistance Guidelines Shelter Meeting 10a May 2010
148 Transitional shelter This workshop discusses when to use transitional shelter, the common circumstances for using it, and its strengths, characteristics.
Shelter and settlement options
Developing a shelter strategy
133 Implementing settlement programmes
Agenda Introductions What is a Unified Shelter Model?
Conflict Engineering proposal
Climate Resilient Flood Management In Urban Assam
Disaster Preparedness and Resilience
Disaster Preparedness and Response
UGRC 144 Science and Technology in Our Lives/Geohazards
Presentation transcript:

Seasons, capacity and funding This session will look at the impacts on response of climatic seasons, available human capacity and funding cycles Vietnam, 2000

Session objectives ! The key learning objectives of this session are to form an understanding of: seasons: the ways in which seasonal variations affect planning and implementation capacity: how capacity for construction varies between stakeholders over time funding: the ways in which funding varies over time and between different funding bodies

Session objectives ! The key learning objectives of this session are to form an understanding of: seasons: the ways in which seasonal variations affect planning and implementation capacity: how capacity for construction varies between stakeholders over time funding: the ways in which funding varies over time and between different funding bodies

Aim: seasons To ensure that the impact of seasons upon the affected populations as well as shelter and construction activities are foreseen and taken into account

Seasons: factors to consider Affected populations and operations are particularly vulnerable to seasonal weather extremes Seasonal factors to consider include: cyclones - can prevent building work and damage transitional settlements cold winters - populations may need additional NFIs to improve thermal comfort and snow can prevent access to remote areas hot summers - may limit access to water for construction rainy seasons and monsoons - can slow on-site construction works and flooding may prevent access to remote locations

Seasons: scheduling of construction Indonesia, 2005 Each region has its own construction seasons, for example between monsoons or winters good construction seasons year 1 year 2 year 3 year 4 need disaster time Shelter NFIs for transitional settlement Shelter NFIs for reconstruction

Seasons: impact on affected populations Seasons impact on affected populations in a number of ways including the following: the types of hazards people face – eg, floods and storms the performance required of buildings and settlements accessibility of sites, including the transport of materials the type of materials available – eg, straw for thatch construction techniques that can be undertaken – eg, mud bricks cannot be made in the rainy season as they will not dry the availability of local labour – eg, in farming communities the harvest will take priority over building projects

Session objectives ! The key learning objectives of this session are to form an understanding of: seasons: the ways in which seasonal variations affect planning and implementation capacity: how capacity for construction varies between stakeholders over time funding: the ways in which funding varies over time and between different funding bodies

Aim: capacity To ensure that sufficient and appropriate capacity is available to undertake the transitional settlement and reconstruction needed for each phase of response

Capacity: affected population The affected population’s capacity for construction is initially small as they are occupied with survival. They later have a large capacity which will slowly decrease as livelihoods are resumed Capacity of the affected population need capacity interrupted by harvests Shelter NFIs for transitional settlement Shelter NFI’s for reconstruction disaster time capacity matches demand survival, search and rescue reduce capacity from construction

Capacity: construction industry The capacity of the local construction industry initially decreases and then increases as services, utilities and material supplies are re-established Capacity of available construction industry need Capacity will increase to meet demand Shelter NFI’s for transitional settlement Shelter NFI’s for reconstruction disaster time capacity decrease caused by: disruption to access and utilities disruption to material supply disruption to workforce capacity matches demand

Capacity: government Government capacity for planning and regulating construction will increase with the establishment of a task force and will then decrease over time in line with need Government capacity for planning and regulating construction need Shelter NFI’s for transitional settlement Shelter NFI’s for reconstruction disaster time creation of task force handover to line ministries

Capacity: international community Humanitarian community capacity will have an initial peak for Search And Rescue (SAR) This is followed by emergency response and then the larger, longer term, main agency capacity Main international community response need assessment and emergency response Shelter NFI’s for transitional settlement Shelter NFI’s for transitional reconstruction disaster time Search And Rescue (SAR)

Capacity: Owner and contactor driven ‘Owner driven’ reconstruction is where the eventual owners and occupiers of buildings: - remain in control of the type and implementation of works undertaken - are supported in managing external inputs of labour and materials as resources ‘Owner driven’ is not the same as ‘self-help’ or community labour

Capacity: Owner and contactor driven ‘Contractor driven’ reconstruction is perceived as negative when contracts awarded do not involve and represent beneficiaries The following points may be useful in clarifying for non-specialists that owner driven reconstruction may involve contractors: the affected population may have insufficient capacity or skill vulnerable individuals and groups may require assistance contractors may be able to better implement hazard mitigation measures, such as seismic resistant construction most vernacular building involves paid labour for some activities a sustainable change is required in the construction industry in order that populations may better manage risk

Session objectives 176 ! The key learning objectives of this session are to form an understanding of: seasons: the ways in which seasonal variations affect planning and implementation capacity: how capacity for construction varies between stakeholders over time funding: the ways in which funding varies over time and between different funding bodies

Aim: funding To take into account the effect of funding cycles on constructional requirements and allowing effective project management. To ensure equitable support is provided to all effected groups regardless of: vulnerability or prejudice geographic origin if they are displaced or non-displaced if they are land owners, tenants or without land rights

Funding: cycles Post-disaster funding comes from a number of different sources, each with their own cycles and response patterns International Financial Institutions (IFIs) emergency contingency funds amount Government funds bilateral donations to agencies Consolidated Appeals Process (CAP) public appeals disaster time

Funding: cycles seasons capacity funding It is very rare for construction seasons to coincide with operational requirements and funding cycles Mapping each cycle enables forward planning and critical path analysis year 3 year 4 year 2 year 1 seasons funding capacity

Discussion Each group will have 10 minutes: seasons, capacities in groups Each group will have 10 minutes: Group 1: seasons and construction Group 2: government capacity Group 3: construction capacity Group 4: humanitarian capacity Group 5: funding capacity Each group will consider: Which general points were not discussed? What mitigation measures exist? seasons, capacities A. general points B. mitigation measures Each group agrees a key point Key point