CNGS horn / reflector in 2005: The story of the glass ring insulator

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
A New Stripline Connection to JPARC Horn 1 Larry Bartoszek BARTOSZEK ENGINEERING 9/23/04.
Ion source maintenance on the MAT 253
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
for a neutrinos factory
Walls crates cables gas chambers electronics CERN adb.
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
NBI CNGS Horns Status Presented by Sandry Wallon 1 NBI 2003 – KEK, Japan 7-11 nov CNGS Horns : Status 8 nov
Anduze – 03/09/ Alveolar Structure - Towards ordering of pieces.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
The CNGS Horns Electrical Systems The CNGS Horns Electrical Systems 4th workshop on Neutrino Beams and Instrumentation 7 – 11 November 2003 at KEK Gilles.Maire.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns.
26/3/03J.E Campagne LAL Horn R&D J.E Campagne, A. Caze (Ph. D), CNGS Horn: G. Macé, S. Wallon New persons: J. Bonis, M. Omesh,… Other IN2P3 members: J.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items.
BPM support and beam pipe length FD support status A.Jeremie.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
Conceptual design of JPARC Horn 2 assembly L. Bartoszek Bartoszek Engineering/CU 5/5/04.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania1 EMCAL CATANIA A. Palmeri - F. Noto.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
18/07/2005 S. Rangod PH/DT1 1 CNGS HORN Mini-review induced by the break of the insulating glass disk.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Ans Pardons (with input from Jean-Marc Cravero) CERN CNGS Horn Experience (issues since NBI2010) Ans Pardons, CERN 1 NBI2012.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 OUTLINE 1.Status 2.Preliminary conclusions of the CNGS Review Board (30.
CLIC DETECTOR PAC RING SHIELDING CONCEPT Jerome Axensalva BE/OP16/12/2011 MDI meeting1.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 3. CERN proposal -> in order to minimize the CERN overhead in the work.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Mikhail Ovsienko TE-MPE-EE
Installation Walkthrough Image Guide
Service channels between Tracker and PP1
new straw end plug: D=10.6 mm straws support frame Levan option
Status and Progress of NSW HUB and Extension
Power coupler at DESY & for XFEL
BSS Prep work at CERN and Acceptance of Parts
Manufacturing of the first FCC-hh beam screen prototype for ANKA
T2K Upgrade First look at TPC contraints (WAGASCI Constraints)
LS1 Committee January 24th, 2014
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Target and Horn status report
Design of the He and HB ODU
2S module geometry updates Module positioning concepts
Rod adaptors for module tests Module positioning studies
Overview of mechanical design & construction
200 kV gun CST microwave studio simulations Shield modifications
Lithium lens and window tests
RPC Readiness for installation
Single Detector Design
Teleconference ACS – FREIA 19th June 2017
Presentation transcript:

CNGS horn / reflector in 2005: The story of the glass ring insulator “A brief summary” by K. Elsener, A. Pardons, S. Rangod

“history” April 2004: horn-1 delivered from LAL to CERN April 2004: horn-1 electrical tests o.k. May 2004: extensive list of compulsory modifications (S. Rangod) June 2004: CNGS review – horn modifications indorsed July 2004: during dis-assembly of horn, glass ring splinters discovered -> mistake in LAL design -> additional modifications necessary March 2005: horn modifications completed; ready for electrical tests April 2005: horn electrical tests o.k. Mai 2005: horn installed on new support frame; transport from BA7 to 887 June 2005: two cracks in horn glass ring discovered July 2005: (7th-11th) NBI workshop at Fermilab - discussions July 2005: (18th) CERN “mini-review” on glass-ring enigma Aug 2005: L. Bartoszek visit to CERN – discussions; decision on new glass rings (with grafoil seals) Sept 2005: new glass rings / grafoil seals ordered Oct 2005: reflector connection plate / glass ring assembly complete Nov 2005: reflector electrical tests o.k. Dec 2005: (5th) reflector installed in target chamber

Glass Disk Enigma Any suggestions? Received from LAL Problem Solution slide presented by A. Pardons at NBI2005, 9 July 2005 Glass Disk Enigma Received from LAL Received from LAL After modification Solution Problem Number of screws & distance Glass plate broken Problem = conceptual After modification Crack discovered ~weeks after electrical tests More cracks present or to be expected? Ceramic ring? Pieces instead of ring? Any suggestions?

(Preliminary proposal 1) slide presented by S. Rangod at CERN “mini-review”, 18 July 2005 (Preliminary proposal 1) For centering pins 12 identical sectors Al2O3 (thickness 30 mm) 12 coaxial springs used during assembly phases 6 necessary gaps to guarantee the contact on lateral faces Critical angular geometry

Conclusions of “mini-review” The CERN “mini-review” did NOT encourage solutions with pieces of ceramic. Separating the functions (i.e. pressure for electrical contact and sealing against water / vapor leaks) was strongly encouraged. A solution with an insulating ring other than a glass ring would have been preferred. Conclusion (after more discussions and tests): New glass ring (smaller width, no holes) Softer seals (GRAFOIL) Since work on horn, reflector and spare horn, installation in the target chamber, stripline installation etc. had to proceed almost in parallel, it was decided that the first object to be equipped with the new assembly was to be the reflector.

Explanation of final assembly (see the drawing next page) (from a document written by A. Pardons) The idea is to only have a limited force on a fragile glass disk (insulator disk between two connection plates of different polarities). Using 6 Belleville washers in a 2-2-2 configuration gives the correct compression force on disk & seal to ensure leak tightness without risking breaking the disk. The washers allow us to choose our target force quite precisely, while giving the assembly a good elasticity and absorption of shocks. Specification: Belleville Washers M16 P# M16-L-2.4-301 thickness 2.4mm

20 Sept. 2005: glass-rings cut out of plate (water/sand jet cutting)

GRAFOIL-rings cut out of plate (water/sand jet cutting) GRAFOIL details: - 98% graphite - needs only little contact pressure (we have applied 5 MPa) max. temp. 500o C available in 1mx1m pieces our rings: 3 mm thick horn R=705-775mm reflector R=1105-1175m (3 pieces of 120o)

Reflector – “Sandwich” Assembly (1)

Reflector – “Sandwich” Assembly (2)

Reflector – “Sandwich” Assembly (3)

Reflector – “Sandwich” Assembly (4): quality control

Reflector – “Sandwich” Assembly (5) before placing the second graoil ring and the second connection plate after

Reflector – “Sandwich” Assembly (6) NOTE: final configuration has 6 (not 5) Belleville washers

Reflector: mounting the “sandwich” of connection plates with glass insulating ring

Reflector: “short-circuit” side before installation of connection plate inside the inner conductor

Reflector on test-bench (18 - 23 Nov. 2005, 20000 double pulses) 180 kA double pulse (Dt=50 ms) Reflector on test-bench (18 - 23 Nov. 2005, 20000 double pulses)

Reflector transport in access gallery (5 November 2005)

Reflector in target chamber top: passage near target shielding right: installation on base frame

CERN horn team (with reflector, in assembly lab)