416 UA College of Pharmacy Skaggs Building Addition and Renovation

Slides:



Advertisements
Similar presentations
LAS SALINAS CONDOMINIUMS Key West Florida. Featuring A Sprayed Polyurethane Roof System Applied To Concrete.
Advertisements

CAPITOL COMPLEX MULTIPLE PROJECT UPDATE. OBJECTIVES Overview of Scheduled Capitol Complex Projects Review of Various Projects Locations Scopes of Work.
February 10, 2010 Sarasota Memorial Health Care System Management Council February 10, 2010.
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
Physical Science Take 10 Week # 6.
Update on FCPS Construction/Renovation Projects August 2009.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
September 21 Update. Future Main Entrance (looking south)
Rebuild Stafford High School Update- October 2014.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
UN Capital Master Plan Renovation Strategy IV Version 9 August 2006 schedule (condensed)
Most Frequently Cited Serious Violations Construction – FY 2006.
Most Frequently Cited Serious Violations Construction – FY 2008.
The CITRIS Building An Interdisciplinary IT Building (140k gsf, 80k asf, 7 stories) u Micro-Nano-fab Laboratory (20k asf) u Distance Learning Facilities.
Rectangular framed structures
Fall Protection in the Roofing Industry
Southeastern OSHA Training Institute Education Center Fall Prevention in the Construction Industry 29 CFR 1926: Subpart M.
1926 Subpart R OSHA’s Steel Erection Standard Scope
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
Copyright © Fall Protection, Subpart M.
Growing Strong Moore Public Schools Bond Election February 12, 2013.
THORNE GROUP Earthworks : Recycling : Reclamation : Demolition : Dismantling GASCOIGNE WOOD COLLIERY RECLAMATION & DEMOLITION Demolition of 30m high rapid.
Most Frequently Cited Serious Violations Construction – FY 2009 OSHA Federal Standards October 1, 2008 – September 30, 2009.
North Augusta High School Design Development Presentation.
Bioscience Research Laboratories University of Arizona + DPR Construction Date: 2015 – Construction Work Starting Today for the BSRL Project !! Expansion.
HALL HIGH SCHOOL NEW SCHOOL PROJECT MARCH 28. Main entrance & cafeteria windows Main entrance.
WHAT IS WORK?. Work when you exert a force on an object that causes the object to move some distance Work is done when the object moves in the same direction.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
MANUFACTURER & EXPORTER OF CRANE, HOIST & MATERIAL HANDLING EQUIPMENT Ambica Engineering Co. Ambica Engineering Co.
LAS SALINAS CONDOMINIUMS Key West, Florida. Featuring: A Sprayed Polyurethane Roof System Applied To Concrete.
All kinds of cranes have the advantage. Longfellow Bridge: “Salt and Pepper” Towers Work More than 100 years after the last stone was set on the “salt.
Accessible Environment
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Click here for the LIVE WEBCAM
Escalator Installation
INSTALLATION SEQUENCE
Welcome to the St. George Manor Renovations…..
CRANES By griffin.
Most Construction FY 2013 Frequently Cited Violations
Tutorial: 3-Force Members
Tuolumne Apartments Lower Level Northwest: Inaccessible Element
Facilities Update November 17, 2017
Most Frequently Cited Serious Violations
Material Handling Material Handling –
Subpart M Fall Protection.
Most Frequently Cited Serious Violations
INDOOR BASEBALL / SOFTBALL FACILITY
Enter a new career in as few as 16 weeks
Minuteman Vocational Technical Regional High School Progress
Most Frequently Cited Serious Violations
New York City Master Plan Update
Building Frame (Column & Beam)
Minuteman Vocational Technical Regional High School Progress
Most Construction FY 2013 Frequently Cited Violations
Introduction to Cranes
Humanities and Social Sciences Upper Level Northeast: Accessible Entrance
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
The Anschutz Health Sciences Building Construction Update 8 April 2019.
Stewart Commons El Mercado Southwest: Inaccessible Entrance
Construction Jeopardy
Mandeville Center Upper Level West: Interior Inaccessible Element
North Augusta High School – Phase 2A and 2B
Most Frequently Cited Serious Violations
Stoughton Public Library
The Paterson Redevelopment
Special Mention: Institute of the Americas Building and Addition Lower Level West: Inaccessible Element.
Presentation transcript:

416 UA College of Pharmacy Skaggs Building Addition and Renovation 2018-10-01 The project crane will weigh 328,551 lbs. when fully loaded. This is the equivalent of 25 full grown African elephants. The crane be located in the north courtyard and will hoist materials into the central courtyard, erect steel, and lift the HVAC equipment onto the roof. Fun Fact Did you know… 416 Estimated Days Until Completion The diagram below shows the crane location & the swing radius of the jib. This radius shows where the crane CAN swing, but NO loads will be lifted over any public areas. Upcoming Activities Demolition of roof parapets at the south & north of Level 3. Continued removal of the stairs from the lower plaza to the upper plaza. Continued courtyard demolition. This crane will be used at various times throughout the project beginning Oct. 22nd.

New Main Entrance on the southwest corner of the College of Pharmacy building Top landing of the ramp at the New Main Entrance to the College of Pharmacy building Accessible ramp at the New Main Entrance on the southwest corner of the College of Pharmacy building Construction barricade wall in the central courtyard