Traffic Control Plan A plan directed to the safe and expeditious movement of traffic through construction and to the safety of the work force performing.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHMs commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

NCHRP 350 Crash Test Program NCHRP 350 CRASH TESTING OF WORK ZONE DEVICES 1997 FHWA started requiring work zone devices to be crashworthy. New purchases.
6F.01 – Types of Devices Support: FHWA policy that work zone devices meet NCHRP Report 350.
Draft Temporary Pedestrian Access Route (TPAR) Guidance
Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated.
How would you like it if people drove their cars thru your office?
Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
Created by: Victor Lund, PEKen Johnson, PE, PTOE St. Louis CountyMnDOT.
Road Safety & Awareness Training Your “Right to Know” 29 CFR 1926 / DOT MUTCD This material was produced under grant number SH22297-SH1 from OSHA. It does.
Traffic Signals, Signs and Pavement Markings  are used for traffic control to provide a smooth, orderly flow of traffic Remember: Obey all signs and signals.
Overview of 2009 MUTCD. Tom McDonald, PE Safety Circuit Rider Iowa LTAP.
Part 3 – Markings. Dotted (not broken) lane lines shall be used for non-continuing lanes:  Lane drops  Auxiliary lanes  Deceleration lanes  Acceleration.
1 Starting a Project – Looking for footpaths or pushed down ROW fences Plan for your pedestrians or they will be walking through your project on the edge.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
Lesson 6 Traffic Safety Protecting People While Stabilizing The Incident.
TYPES OF INTERSECTIONS OF ROAD AND DESIGN PARAMETERS OF INTERSECTION
Guidelines for Traffic Control at Surface Mines
Maintenance and Protection of Traffic (MPT) – HDM Ch 16.
Lec 25, Ch.7, pp : Intersection types and design principles (Objectives) Become familiar with the typical intersection types (See figures 7-1 thorugh.
Lec 14, Ch.8, pp : Intersection control and warrants (objectives) Know the purpose of traffic control Know what MUTCD is and what’s in it Know what.
Work Zone Safety It Starts With YOU!!. 2 BOOK 7 What is NEW??? IMSA TECHNICAL EXPO October, 2014 Dave Edwards.
Traffic Engineering Traffic Control Devices. Traffic Control Traffic engineers do not have any control over individual drivers need to develop devices.
Driver Safety Fall 2014 Miss Padelsky. Traffic Signs, Signals & Road Markings  Traffic signs, signals & road markings are set up to control the flow.
Driver Theory Traffic Signs Work Zone Signs. Work Zone Work Zone Signs are usually diamond shaped, like warning signs, but they are orange instead of.
Guidelines for Traffic Control at Surface Mines
Three Types of Road Signs
Highway 125 Night Work Making Work Zones Work Better Workshop Gerard Kennedy, P.Eng. Nova Scotia Department of Transportation & Public Works.
DRIVER SAFETY.
Temporary Traffic Control Standards Update. Why? Came into this position soon after TC details became TTC standards about 1.5 years ago (2/13/2013) As.
Office of Traffic, Safety, and Operations Application Guidelines Warning Signs Signing Plan Design (At-Grade) June 20, 2012.
Work Zone Safety and Traffic Management Alazar Tesfaye, PE Traffic Operations Engineer Colorado DOT Transportation Systems Management and Operations Division.
October 1, 2014 David Rush Work Zone Safety Program Manager, Traffic Engineering Division 2014 Work Zone Safety Team Reviews.
Work Zone Traffic Control
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
C ONSIDERING L ARGE T RUCKS IN THE D EVELOPMENT OF T RAFFIC M ANAGEMENT P LANS Neil Boudreau, MassDOT State Traffic Engineer April 13, 2015.
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
Road Ranger / TMC Operator Joint Training Module 101 MODULE 10 MODULE 10 Road Ranger Work Zones.
Section III Day 3 1 DMV Manual pgs The day has finally arrived. You are officially a licensed driver. It is such a big event that the school paper.
Understanding Work Zones
Types of Work Zones Stationary Work Areas Moving Work Areas
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
2.2- Traffic Signals. Traffic Lights Green Light- GO – You can proceed only if the intersection is clear. When approaching a green light, check traffic.
2011 Road School Work Zone Traffic Control Handbook.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
 Signs that set limits or give commands are regulatory signs. Regulatory sings control traffic.
DETECTION AND ASSESSMENT OF SAFETY PROBLEMS WITHIN ROAD TRANSPORT DECISION MAKING Prof. Dr. Nikolay Georgiev eng. Violina Velyova ‘Todor Kableshkov’ University.
Montana Driver Education and Training Traffic Control Devices and
Traffic Signs, Signals, and Road Markings
2009 Manual on Uniform Traffic Control Devices
NCHCA Moving People During Construction
Highway Administration & Finance
Drive Right Chapter 2 Unit 1
The Key Elements of Developing a Traffic Control Plan
Traffic Control Devices
Traffic Signals and Pavement Markings
From Channelization, Islands and Turning Roadways (p ~ p
Traffic Operations Division
Rules of the Road.
Design Consistency and Positive Guidance
Midblock Crossings Lesson 12 Publication No. FHWA-HRT
Traffic Signs, Signals, and Road Markings
Flagging This presentation was prepared by Rich Lobdell for High Plains Power. The information herein is not intended to be complete in all aspects.
HERO UNIT Training Module
lesson 2.3 ROADWAY MARKINGS
lesson 16.3 STRATEGIES FOR DRIVING ON HIGHWAYS
lesson 15.1 CHARACTERISTICS OF RURAL DRIVING Rural roads account for
MODULE 10 Road Ranger Work Zones
David Dennis, CSHO, SSH Director of Safety, OHL USA.
Module 6 A 21st Century Transportation Network
Presentation transcript:

Traffic Control Plan A plan directed to the safe and expeditious movement of traffic through construction and to the safety of the work force performing those operations is defined as a Traffic Control Plan (TCP).

Special conditions in TCP # High volume or high speed traffic. # Rush hour or seasonal traffic patterns. # Heavy use by pedestrians. # Changing work conditions or other conditions that would be confusing to the traveling public. # Hazards due to nighttime operations. # Complex detours or traffic patterns. # Closely spaced intersections, interchanges, or other decision points.

Checklist of factors # Estimated traffic volumes, vehicle types, and direction of travel. # Traffic speeds. # Required number of travel lanes. # Traffic control layouts including signing, markings, channelization devices, traffic signals, traffic delineators, barriers, and detour schemes. # Restrictions on work periods such as rush hours, holidays, special events, nights, weekends. # Characteristics of adjacent highway segments.

Factors – cont’d Requirements for partial completion and opening sections to traffic. # Maneuvering space available for traffic. # Requirements for installing, maintaining, moving, or removing traffic control devices. # Turns or cross movements required by traffic.

Add’l – but not in contract # The need for public relations, such as notifications to the local news media. # Any special agreements reached with other agencies relating to traffic control or traffic management. # Accident reporting requirements. # Any special guidance on traffic management for the project engineer.

Research comparisons on Control Devices Cones, signs and barricades more effective in conjunction with a flagger Barricades, panels, and drums lead to earlier transition time at night than did cones and tubes Size and visible area of control device had more impact than shape Only arrows and chevrons successfully conveyed the message of direction (not stripes)

Research comparisons on devices – cont’d Generally, devices of equal visibility had equal value Motorists respond to the channelization path, but not to a single device

OECD Research comparisons on devices Cones and tubes advantages provide less impediment to traffic flow Cause less damage to vehicles and workers Easier to store, transport and set up (EJK questions last point)

OECD Research comparisons on devices Reservations: (Disadvantages) Cones and tubes: easy to penetrate/displace don’t command respect as drums Drums: The large size that makes them more visible and commands respect also can be large projectiles into construction worker area.

Edge drops in Construction Zones

Edge drop mitigation in construction zones Place a 45 degree wedge at dropoff site (What are the potential problems?) Place channelizing devices near dropoff using a 3 foot buffer Install portable concrete barriers (or other barrier type) ( What factors affect the wisdom of doing this?) OTHER