Fred’s Input to Rice Workshop 19-April-05 Fred’s Input to Rice Workshop Prepared by Fred Borcherding FNAL 7-Jan-2009 Rice Workshop by Fred B.
19-April-05 What we need For EMU and CMS an up to date list of boards with numbers of installed, ready spares, under repair, other spares A systematic way of obtaining the above information from ‘electronics’ db For each board type do we have Test stand fixture Test stand expert Test stand procedures Repair facility 7-Jan-2009 Rice Workshop by Fred B.
Electronics db Electronics Data Base Jobs Electronics Data Bases 19-April-05 Electronics db Electronics Data Base Jobs Is the information in each db current? Do we need an inventory? Have consistency checks been conducted on each db? Who maintains db now and in the future? db programming db entries Electronics Data Bases Chamber db Contains all chambers, location, fast site info Oracle db On-chamber electronics db Contains all on-chamber boards Off-chamber db Contains pcrate boards, FED, TF, LV and HV crates and boards Presently in spreadsheet form Moving to Oracle DB (Vadim at UTA) CMS EMDB Official CMS Electronics db Snapshot of present UXC and USC cratess and boards Linked to each sub-detector electronics db Linked to chamber db, oracle db, NOT linked to off-chamber, but planned Has history of slots > requested by CSC Others 7-Jan-2009 Rice Workshop by Fred B.
CMS EMDB Screen shot of db 7-Jan-2009 Rice Workshop by Fred B. 19-April-05 CMS EMDB Screen shot of db 7-Jan-2009 Rice Workshop by Fred B.
Status of Electronics > Installed 19-April-05 Status of Electronics > Installed Status of Electronics > Installed / Total at CERN / Good Spares Status of Crates and boards, how many are needed, how many are at CERN and how many are good spares The following few slides are included for completeness 7-Jan-2009 Rice Workshop by Fred B.
19-April-05 On-Chamber Boards CSC On-chamber Electronics Boards installed /total /spares CFE 30520306050001xxxxx CFEB one type, 5(4) per chamber 2268 /?? /19 ALC 30520112030001xxxxx ALCT ME1_1 72 /?? / ?? ALC 30520112030288xxxxx ALCT288 ME1_3 72 /?? /10 ALC 30520112030384xxxxx ALCT384 ME1_2, ME234_2 214/?? /11 ALC 30520112030672xxxxx ALCT672 ME2_1, ME3_1, ME4_1 108 /?? /4 ALM 30520112130001xxxxx ALCT_MEZ one type, 1 per chamber 468 /?? /?? LVD 30521222040001xxxxx LVDB one type, 1 per chamber 468 /?? /?? LVM 30521222130001xxxxx LVMB one type, 1 per chamber 468 /?? /?? AFE 30520106050001xxxxx AFEB one type, many per chamber ?? /?? /?? NOTE: Have ~18 spare chambers, each with full complement of on-chamber boards – these are not in the sums above 7-Jan-2009 Rice Workshop by Fred B.
19-April-05 LV & PCRATE CSC LV Power Supplies > Wiener Maraton System, Air Cooled installed /total /spares PFCB LVPS 72500xxxx OPFC Bin (Crate) 6 /8 /2 PFCM LVPS 71960xxxx OPFC Module 36 /40 /4 MARS LVPS 72920xxxx Maraton Supply 36 /40 /4 MARC LVPS 72960xxxx Maraton Crate 36 /38 /2 Peripheral Crate, pcrate, Components installed /total /spares EMUPC PC 305216030320050xxxx pcrate crate 75 /60 /15 CBP PC 305203021620050xxxx pcrate back plane 70 /60 /10 CRB PC 305203180220050xxxx pcrate regulator brd 88 /60 /28 PCM PC 305216031320060xxxx PCMB 79 /60 /19 ELM PC 305205121320050xxxx ELMB on PCMB 79 /60 /19 Pcrate boards installed /total /spares VCC PC 305222030320050xxxx Crate Controller 73 /60 /15 CCB PC 305203030220050xxxx Clock and Control 84 /60 /24 DMB PC 305204130220040xxxx DAQ Mother Brd. 550 /468 /82 MPC Trigger PC 305213160320050xxxx Muon Port Card 70 /60 /10 TMB Trigger PC 305220130220050xxxx Trig Mother Brd. 570 /468 /102 RAT Trigger PC 305218012020050xxxx RPC ALCT Trns. 690 /468 /222 7-Jan-2009 Rice Workshop by Fred B.
CSC HV HV ME1/1 > CAEN System installed /total /spares 19-April-05 CSC HV HV ME1/1 > CAEN System installed /total /spares Cc HV1 3052## Crate 2 /2 /0 Cc HV1 3052## Board 16 /18 /2 HV > UF Custom System installed /total /spares HV UF Custom System installed /total /spares HDS 30520804192005xxxxx Distribution-36 126 /159 /33 HDL 30520804122005xxxxx Distribution-30 144 /173 /29 HDC 30520804032005xxxxx Distrib Crate 30 /34 /4 HDP 30520804162005xxxxx Distrib Patch 8 /9 /1 HMB 30520813022005xxxxx Master board 40 /48 /8 HMC 30520813032005xxxxx Master Crate 8 /10 /2 HPS 30520816192005xxxxx Primary HV src 8 /10 /2 HCC 30520803032005xxxxx Control comp 2 /3 /1 HLV 30520812222005xxxxx LV power supply 2 /3 /1 HMP 30520813162005xxxxx Master Patch 2 /1 /3 HLP 30520812162005xxxxx LV patch panel 2 /4 /2 HCP 30520803162005xxxxx Control patch 2 /4 /2 HPC 30520816032005xxxxx Primary HVPS ctr 2 /3 /1 (spare parts) 7-Jan-2009 Rice Workshop by Fred B.
CSC Track Finder CSC TF installed /total /spares 19-April-05 CSC Track Finder CSC TF installed /total /spares CCC Trigger TF 3052000000200500000 9U CAEN VME 1 /3 /1 0 Trigger TF 3052200603200500000 wiener crate ( trigger) 1 /2 /1 0 Trigger TF 3052200602200500000 TF backplane 1 /3 /2 DDU Trigger TF 3052 200500000 DDU 1 /2 /1 DDE Trigger TF 3052040405200500000 DDU extender 1 /3 /1 TSP Trigger TF 3052201916200500016 SP 12/17 /2 CCB Trigger TF 3052030302200500025 CCB 1 /3 /1 0 Trigger TF 3052000000200500005 muon sorter 1 /5 /3 7-Jan-2009 Rice Workshop by Fred B.
CSC FED 7-Jan-2009 Rice Workshop by Fred B. 19-April-05 FED Crates > Wiener 9U VME installed /total /spares FED FED 3052060504200510000 FED Crate 4 /4 /0 (1 sp PS) FED Boards > OSU Custom Brds installed /total /spares CVC FED 3052032203200510000 CAEN 6U CC 4 /5 /1 One sent to CAEN for repair, good spare is loan from pool DCC FED 3052040303200510006 Clock and Control 4 /6 /2 2 more to be shipped to CERN DDU FED 3052040421200510032 Data Board 36 /?? /?? Pcrate Network > GBit installed /total /spares GNS GIG 3052071419200510001 GBit Ethernet switch 8 /10 /2 (1 sp installed) 7-Jan-2009 Rice Workshop by Fred B.