DNP/UCAIug Joint Meeting 2011

Slides:



Advertisements
Similar presentations
Join Us Now at: Enabling Interoperability for the Utility Enterprise And TESTING.
Advertisements

SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example Kay Stefferud Chair, SG-Systems Use Cases For more information visit:
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview November.
Submission May 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG Washington DC Opening Report] Date Submitted: [May 4th, 2010] Source: [Don Sturek]
Open Smart Grid Subcommittee Organization and Overview Erich W. Gunther UCAIug Board Member.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
UCA International Users Group The Quality Assurance Program prepared by the UCA ® International Users Group Testing Subcommittee UPDATED: 28 July 2008.
The NIST Smart Grid Interoperability Framework and the Role of CIM Jerry FitzPatrick National Institute of Standards and Technology CIM Users Group Meeting.
1 Accelerating Standards for the Smart Grid David Wollman National Institute of Standards and Technology
Join Us Now at: Enabling Interoperability for the Utility Enterprise And TESTING.
DNP/UCAIug Joint Meeting 2011 Greetings – Erich Gunther, Enernex – UCAIug Board Chair UCAIug Update – Kay Clinard, UCAIug President CIMug Update – Greg.
Herbert Falk UCA IOP Group Meeting April 1, 2011 UCA Paris 2011 IOP Results Report ©2011 UCAIug Paris 2011 IOP Results - IEC UCAIug Pv1 1.
IPRM Overview Zahra Makoui SG Conformity Vice Chair March 2011 Source: SGIP SGTCC
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
SGTCC END TO END TESTING INITIATIVE APEC-ISGAN Smart Grid Test Bed Network Workshop Washington, DC -- January 24, 2012 Rik Drummond, Dean Prochaska, Rudi.
November 9-10, 2009 UCA IUG Testing Subcommittee Report Testing Subcommittee Report UCAI Users Group Meeting Charlotte, Nc, USA November 9-10, 2009 Bruce.
John McDonald 05 November 2013 SGIP Members Meeting.
Interoperability Tests for IEC Scott Neumann November 12, 2009.
McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview.
Common Information Model and EPRI Smart Grid Research
EDISON INTERNATIONAL® SM SCE Project Story CIM User Group 10/12/2010 Jim Horstman Southern California Edison.
Open Smart Grid Subcommittee Organization and Overview Erich W. Gunther UCAIug Board Member.
Systems Integration Specialists Company, Inc. The Standards Based Integration Company © Copyright 2010 SISCO, Inc. 1 Introduction to SISCO For CIM Users.
OpenSG Closing Plenary Knoxville February, UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included.
OpenSG Conformity IPRM Overview July 20, ITCA goals under the IPRM at a high level and in outline form these include: Organize the Test and Certification.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
UCAIug Annual Meeting 2009 November 9 th – 10 th, 2009 EPRI Office Charlotte, NC.
Project CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011.
Use Cases for TC57 and for other TCs… Eric Lambert EDF R&D CIM User group PRAGUES 2011.
OpenSG Status UCAIug Members Meeting Chris Knudsen – Chair Gary Stuebing – Vice-Chair November 9 th, 2009.
Smart Grid Interoperability Panel & ISO / RTO Council Smart Grid Projects David Forfia SGIP Governing Board Member – Stakeholder Category 21 ISO/RTO Sponsor.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
© 2011 EnerNex. All Rights Reserved. UCAIug Testing Subcommittee Activities.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
25 August UCA International Users Group Testing Quality Assurance Program Funding Issues 25 August 2010/ Updated 12 October 2010 Jack Robinson,
TC 57 PSCE09 - CIM Status Update Panel Session Introduction Ed Dobrowolski, NERC.
IEC TC57 Smart Grid Activities Scott Neumann USNC TA IEC TC57 November 6, 2009.
Boot Camp - Conformity July 19, 2010 Detroit, USA.
Erich W. Gunther UtilityAMI Chairman/Facilitator Chairman/CTO – EnerNex Corporation Jerry Melcher Onsite facilitator for this meeting.
Overview AMI-Enterprise For further information, contact: Wayne Longcore Chair of AMI-Enterprise Task Force, Board Of Directors.
Working Group Summaries Charlotte, NC November 12, 2009.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
OpenSG SG Conformity – Security Conformity July 22, 2010 Bobby Brown.
“SG-Systems” ( Smart Grid – Operational Applications Integration ) Charter & Status Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
© 2010 EnerNex Corporation. All Rights Reserved. SGIP TCC / OSG Cooperation Presented By: Erich Gunther EnerNex Corporation 2010.
Project CIM Test Development Process John Simmins Project Overview 1/27/2011.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
Open SG and SG-Systems Overview for IEC TC57 Working Groups For further information, contact: Greg Robinson Convener of IEC.
February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task Force Re:
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
IEEE ITS and Related Standardization Activities
Testing Technical Committee Paris, France August 24, 2010
[WP1] T1.2 User and Business Requirements
CIM Test Development Process
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
Vertical Applications TAG
“SG-Systems” (Smart Grid – Operational Applications Integration) Charter & Status Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
Frances Cleveland Convenor WG15
UtilityAMI General Meeting
IEC TC57 Smart Grid Activities
NIST PAP Assignments to CIM User Group and/or IEC TC57
Boot Camp - Conformity March 7, 2011 SF Bay Area.
OpenADR SRS Draft 1 Review
“OpenADR” “Boot Camp” Overview
Presentation transcript:

DNP/UCAIug Joint Meeting 2011 Greetings – Erich Gunther, Enernex UCAIug Board Chair UCAIug Update – Kay Clinard, UCAIug President CIMug Update – Greg Robinson, Xtensible IEC61850ug Update – Christoph Brunner, it4power OSGug Update – Erich Gunther, Enernex Testing Update – Bruce Muschlitz, Enernex UCAIug IOP 2011 – Herb Falk, SISCO

Update on Organizational Issues OSGug has just completed elections for two open TC seats…Marty Burns, and John Simmins are the two new members EC has just completed elections for three open seats for OSG representation…Aaron Snyder, Gary Stubbing, Klaus Bender are the three new members Will be seeking nominations for three more EC members.

UCAIug 2011 Plan 2011 we will focus on member recruitment Being in contact with existing members Customer Satisfaction Survey Revising membership structure Tightening document access Increasing meeting costs for non-members Complete IPR and put in place

UCAIug 2011 Plan, cont.. Last year we started acquiring equipment required for meeting support…projectors, phones, room sound systems. For 2011 the goal is to: Streamline meeting planning process Minimize charges where possible Use hotel staff to install and manage UCAIug supplied equipment Use additional technical support where needed for A/V.

UCAIug 2011 Plan, cont… 2011 Daily Operations Continuing support of SGIP Identify tasks that where additional/other resources can be used Use proceeds from Meetings to pay for additional resources as available Streamline credit card collections accounting process Now Using PayPal for all cards Automating Data Collection & Reporting Meeting registration process Now using RegOnLine…evaluate using Cvent

UCAIug Budget

Where the Budget Goes Projected Expense Professional Fees $17,500   Professional Fees $17,500 Customer Relations $8,000 Web Presence $98,200 Marketing $24,000 Meetings $315,988 Testing Committee $90,000 Expansion Plan to Establish Utiliy Forum $30,000 Daily Operations $235,930 Bank and Credit Card Fees $15,400 Total Projected Proposed Budget Expenditures $835,018 Projected 2009 Income Less Expenditures $30,382 Balance brought forward from 2010 operations -$30,000 Projected Balance at end of 2011 operations $382

Greg Robinson, Xtensible Solutions CIMug Update

Christoph Brunner Christoph.brunner@it4power.com IEC 61850 update Christoph Brunner Christoph.brunner@it4power.com

New parts Domain specific object models IEC 61850-7-4, Ed 2: Basic communication structure – Compatible logical node classes and data object classes IEC 61850-7-410: Hydroelectric power plants – Communication for monitoring and control IEC 61850-7-420: Communications Systems for Distributed Energy Resources (DER)

Documents in preparation IEC 61850-7-5 – Use of the basic elements of IEC 61850 models IEC 61850-7-500 – Use of logical nodes to model the functions of a substation automation system IEC 61850-7-510 – Use of logical nodes to model the functions of a hydro power plant

Mappings for gateways DNP Master DNP Outstation IEC 61580 Client IEC 61850 Device Gateway IEC 61850-80-1 – Guideline to exchange information from a CDC based data model using IEC 60870-5-101 / -104 IEEE 1815.1 – Exchanging Information between networks Implementing IEC 61850 and IEEE1815 (DNP3) Intended to become a IEC dual logo standard (IEC 61850-80-2)

How to address new areas? Prepare technical reports "how to use IEC 61850 for... " Technical reports describing The use cases considered The impact on the communication The impact on the modeling The impact on the engineering Results will be used to update the standards (Amendment / new Edition)

WG10 technical reports IEC 61850-90-1: Using IEC 61850 for communication between substations (published) IEC 61850-90-2: Using IEC 61850 for communication between substations and control center IEC 61850-90-3: Using IEC 61850 for condition monitoring IEC 61850-90-4: Network engineering guidelines IEC 61850-90-5: Using IEC 61850 to transmit synchrophasor information according to IEEE C37.118

WG17 technical reports IEC 61850-90-6: Using IEC 61850 for distribution automation IEC 61850-90-7: IEC 61850 object models for photovoltaic, storage and other DER inverters IEC 61850-90-8: IEC 61850 object models for electrical vehicles IEC 61850-90-9: IEC 61850 object models for battery storage systems Provide a "fast track" for urgently needed models for SmartGrid applications Supported by the name space concept of IEC 61850

Other activities Develop methodologies for testing of functions in IEC 61850 based systems Define aspects of modeling distributed logic Prepare UML model of IEC 61850 Prepare webbased access to IEC 61850 models

Status Edition 2 Published: Parts 6, 7-2, 7-3, 7-4 FDIS: Parts 4, 7-1, 8-1, 9-2 CDV: Part 5, 10 CD: Part 3 Circulated as DC – in preparation for DTR: Part 1 Withdrawn: Part 9-1

http://osgug.ucaiug.org/

2010 OpenSG WG Specific Objectives SG Simulation – NEW for 2010! – Establish WG, chairman, charter SG Systems OpenADR Build CIM into OpenADR specifications Harmonize OpenADR with other TFs (OpenHAN, OpenADE, Conformance, etc.) OpenADE OpenADE 1.0 SRS: February 2010 OpenADE 2.0: User Requirements Q2 2010 OpenADE 2.0: System Requirements / Service Definitions Q4 2010 OpenHAN OpenHAN 2.0 SRS ratified by OpenSG SG Communications Finalize the PAP 2 Task 1 and 3 OpenSG Interim Report #2 Meet with NIST and IEEE 802 to begin work on PAP 2 Task 4 (mapping of OpenSG application requirements to the inventory of wireless standards) Agree to high level statement on Network Interoperability Scope and Charter and begin work SG Conformance Agree upon (simple) definitions for Conformance and Interoperability and “Abstract Test Cases” and “Concrete Test Cases” Agree upon a language (framework, taxomomy) upon which to build abstract test cases Edge Conformance Complete Certification Process Reference Manual SG Security Establish coordinated support for other OpenSG working groups & task forces Revise the AMI Security Profile Address additional security profiles as produced by ASAP-SG

Next Meeting South San Francisco – Embassy Suites SFO March 7: OpenSG Boot Camp Sessions March 8 – 10: User Group General and Work Group Sessions 

UCA IUG Testing Past, Present, and Future Bruce Muschlitz Committee co-chair www.ucaiug.org UCA Testing Past, Present, and Future UCAI Meeting San Diego, Ca February 1, 2011 February 1, 2010 UCA IUG Testing Past, Present, and Future

Testing Committee Background Group created during UCA IUG creation Began work 2005 Technical Tasks Test Procedures Quality Assurance Program Tester Accreditation Administrative Tasks Maintain Conformance Certificates Maintain testing documents UCA IUG Testing Past, Present, and Future February 1, 2010

Testing Subcommittee Charter Single point focus for UCA IUG Arbitrates technical issues Coordinates groups within UCA 61850 Testing Open Smart Grid Conformity CIM Interoperability Requires utility rep as co-chair Now technically in violation (volunteers?) UCA IUG Testing Past, Present, and Future February 1, 2010

NIST SmartGrid Developments NIST is an international collaboration Smart Grid Interoperability Panel SG Testing and Certification Committee InterOp Process Reference Manual Best practices InterOp Testing and Certification Authority Mandates CB adhere to ISO/IEC Guide 65 Mandates Tester adhere to ISO/IEC 17025 NIST needs organization(s) to pilot IPRM UCA IUG Testing Past, Present, and Future February 1, 2010

UCA Pilot of NIST IPRM UCA has volunteered to pilot IPRM UCA procedures almost meet IPRM UCA status will be improved Some changes needed: UCAS and testers UCA to become Guide 65 Certification Body UCA must adopt formal quality management sys UCA will issue (sign off on) certificates Testers to become 17025 certified/compliant Tester will not have final say on certificate issue UCA will review the “tester file” before cert issued UCA IUG Testing Past, Present, and Future February 1, 2010

UCA Pilot of NIST IPRM (cont.) 2011 is transition year for IPRM User Group need to declare ITCA intent Lack of progress nullifies that declaration Changes needed Create quality manual for UCA testing Have testers upgrade 9001 -> 17025 Remove tester authority to issue certificates Significant per-test UCA work(review all tests) Testing fees might be considered UCA IUG Testing Past, Present, and Future February 1, 2010

? Questions UCA IUG Testing Past, Present, and Future February 1, 2010

Report on UCA User Group IOPs 2011

What’s being tested UCA IEC 61850 CIM

Rules of engagement IOPs are closed except to: Participants Witnesses Each IOP team develops their own use cases, test procedures, and expected results. Testing will occur in a distributed or centralized fashion and will be closed to team members only (week of March 28th). Test reports will be generated by each team and made available to UCA User Group members.

61850 Tests Client/Server 61850 GOOSE SV SCL (CID and SCD) Infrastructure

Witnesses EDF eRDF KEMA Prosoft Red Electrica de Espanma

61850 - Infrastructure Test objectives: To test Rapid Spanning Tree Protocol (RSTP) as a recovery mechanism for Ethernet within a substation. Test will include performance as well as interoperability. Test Participants: Hirschmann RuggedCom Siemens Schweitzer Engineering Laboratories ZIV

61850 IOP – SV Testing Publishers Subscribers Alstom SEL Both RTDS

IEC 61850 Client/Server Tests Purpose: To test Reads, Direct Control, un-buffered reporting, buffered reporting, and COMTRADE file transfer. Participant Matrix: One more participant may be joining.

IEC 61850 – GOOSE Testing Test purpose: Interoperability of DataSet member types.

CIM Testing CIM IEC 61970 Part 4 and 13 Topology Equipment Assets GIS Middleware

61968 – Part 4 & Part 13 Test objectives: To test the exchange of full and incremental network models that contain sufficient information to allow a DMS to produce a Power Flow. Test will include interoperability of multiple systems including GIS and DMS systems from several vendors. Test Participants: GE Telvent Siemens EDF EPRI Alstom ABB TIBCO SISCO

Witnesses Oncor SunGard Tenet ERDF

61968 – Part 3 Test objectives: To test the exchange of an Outage Notification message between an OMS and other Backoffice Systems. Test will include interoperability of multiple systems including OMS, AMI and MDM systems from several vendors. Test Participants: GE Telvent Grid-Net Siemens Alstom AEP Consumers Energy TIBCO Oracle

Witnesses Oncor SunGard Tenet AEP Consumers Energy

61968 – Part 9 Test objectives: To test the exchange of at least 7 Meter Reading and Control messages between metering systems and other Backoffice Systems. Test will include interoperability of multiple systems including AMI, MDM, OMS systems from several vendors. Messages that will be Tested: Meter Readings EndDeviceEvents EndDeviceControls PanDeviceEvents PanDeviceControls PanDeviceAssets MeterAssetConfig CoincidentMeterReadings

61968 – Part 9 Test Participants: GE Telvent Grid-Net Ecologic Analytics Landis & Gyr AEP Consumers Energy TIBCO Oracle eMeter Elster Aclara Itron UISOL

Witnesses Oncor SunGard Tenet AEP Consumers Energy Kema EDF

Middleware/Integration Tests Tests will include the use of Web Services and JMS Topics and Queues Integration patterns will include those found in 61968-1-1 and 61968-1-2 Middleware Vendors include: TIBCO IBM WebSphere Oracle WebLogic