Cumulative colorectal cancer mortality and all-cause mortality in persons in Vejle and Copenhagen counties invited to screening and in persons in the rest.

Slides:



Advertisements
Similar presentations
Graph comparing baseline data with data collected following PDSA cycle 1 (initial introduction of the checklist). PDSA, plan do study act; IV, intravenous.
Advertisements

Percentage of patients attending for GP steroid review following steroid letter. GP, general practitioner; LTOC, long-term oral corticosteroids. Percentage.
Summary of project team improvement efforts
Flow diversion treatment of a large left cavernous aneurysm with complete occlusion of the aneurysm demonstrated at 6-month follow-up angiogram. Flow diversion.
Effect of interventions on % appointments not attended
Run chart showing outcomes of interventions expressed as percentage of cases with active implantable cardioverter defibrillator (ICD) in situ postmortem. PDSA, Plan-Do-Study-Act.
Outcomes in (A) sepsis-related mortality, (B) sepsis-related length of stay and (C) sepsis-related 30-day readmissions before implementation of the machine.
The poster displayed across the wards and on our Trust intranet
Percentage of newborns admitted to neonatal intensive care unit with axillary temperature over 36.5°C on arrival (July 2016–April 2017). Percentage of.
Percentage of newborns admitted to neonatal intensive care unit with axillary temperature below 36°C on arrival (July 2016–April 2017). Percentage of newborns.
Heat map with two-way hierarchical clustering of genus-summarised microbiota abundance and sample grouping for mucosal and tumour microbiotas from patients.
Adult mechanical ventilation weaning protocol at St
Mortality from CHD and stroke in women and men, by country and year.
Relationship between Catholic proportions (x-axis) and breast feeding initiation rates (y-axis) in French Departments (cyan), Irish counties (green), UK.
SPIRIT diagram. SPIRIT diagram. The figure details the timing of enrollment activities, intervention allocation, and assessments of outcomes over the course.
(A) Indicator 2: total surgeon, anaesthesiologist and obstetrician workforce density per 100 000 people, by state in the year (A) Indicator 2: total.
(A) Refractory pouchitis with a PDAI of 10, (B) pouch with normal mucosa and PDAI of 4 in week 20 after VDZ; (C) histological aspect of chronic refractory.
Fishbone diagram of the cause-and-effect analysis
Hemorrhage control bag containing multiple tourniquets and rolls of wound packing co-located with an AED in the elementary school. Hemorrhage control bag.
Process map of antenatal care visit in Haiti.
Deaths from non-communicable diseases among women in 2012, by cause, World Bank income category, and WHO region. Deaths from non-communicable diseases.
Figure 4. Run chart for medication dosage as per national asthma care guideline. Figure 4. Run chart for medication dosage as per national asthma care.
Diagnoses of CD per 1000 of the population for 2410 patients by biopsy (1689) and serology (721) in Derby hospitals by gender and age bands. Diagnoses.
Schematic representation of referral process (1a) and suggested areas to improve the referral process of the Emergency clinic (1b). Schematic representation.
A chest X-ray revealing proper placement of chest tubes with a moderate amount of retained hemothorax on the right and a large retained hemothorax on the.
Age-specific mortality rates from CHD and stroke in women and men in 2010 in selected countries. Age-specific mortality rates from CHD and stroke in women.
Demonstrates the number of signups, posts+replies (individual posts and comments), likes, and cold starts (the number of unique people that opened the.
Results: P-Chart of All GIM patients receiving unnecessary testing during intervention period, August 2014-March Results: P-Chart of All GIM patients.
Median rate per month of missing data comparing documentation of items included in feedback reports versus all signs and symptoms collected at admission.
A statistical process control chart illustrating the handover scores observed for each handover before and after implementation of the standardised handover.
Center 1 Time (min) to Antibiotic Administration SPC Chart.
Chart showing project sustainability over 34 months with a steady increase in number of points correctly documented. Chart showing project sustainability.
Smoothed colorectal cancer mortality rate (per 100 000 person-years) in the screening and control arm over follow-up time, and ratio of the mortality rates.
Barriers along the diagnostics value chain, based on the GHDonline Expert Panel discussion analysis. Barriers along the diagnostics value chain, based.
Annotated sample ‘Competency Dictionary’ entry.
Monitoring for diabetic complications in home care baseline data
(A) Target 1 vs Target 2 - % of those diagnosed vs % of those diagnosed receiving ART. (B) Target 2 vs Target 3 - % of those diagnosed on ART vs % of those.
Per cent of inpatient warfarin recipients with low international normalised ratio (INR) (
Ishikawa diagram showing the main contributory factors to the number of unacknowledged results including medical record office-related, software-related.
Dana Dykes et al. BMJ Qual Improv Report 2016;5:u w3675
Cumulative incidence functions for live hospital discharge in AS-exposed and non-exposed patients. AS, antimicrobial stewardship. Cumulative incidence.
Run chart of monthly median time for administration of pain medication for ED patients diagnosed with long bone fractures. Run chart of monthly median.
Healthcare workers’ knowledge of monitoring of diabetic parameters
Per cent of inpatient warfarin recipients with international normalised ratio (INR) greater than 5 (high INR) from preimplementation to postimplementation.
Existing workflow process—consent taking to operation theatre—three consent checks on D −1 and D0 of surgery (Plan-Do-Study-Act (PDSA) cycle 2 reflected.
Figure 3. Run chart for use of standardized instrument to assess level of control. Figure 3. Run chart for use of standardized instrument to assess level.
Center 2 Time (min) to Antibiotic Administration Baseline to Final Analysis. Center 2 Time (min) to Antibiotic Administration Baseline to Final Analysis.
System-wide statistical process control chart.
Patient satisfaction comparing patients receiving primary care from clinics with scribes versus patients receiving primary care from clinics without scribes.
Improved monitoring of diabetic parameters outcome data
Systematic review: Perinatally HIV-infected infants in South Africa, total HIV-infected children aged 0–14 and the approaching wave of HIV-infected adolescents.
Change in healthcare workers’ knowledge after checklist implementation
Variation in the completeness of reporting between EWARS and EWARN from week 43, 2014 through week 44, Variation in the completeness of reporting.
Schematic of the cost-effective scale-up pathway.
Total cases of waterborne disease reported in Aleppo by EWARS and EWARN (top). Total cases of waterborne disease reported in Aleppo by EWARS and EWARN.
Statistical Process Chart (SPC) comparing monthly and mean contaminated BC rate for the pre-study period compared with the study period. Statistical Process.
Mean number of problems across the PPE-15 domains for each month of the program (pooled data across all 15 PPE-15 domains). Mean number of problems across.
Run charts of behavioural change over the quality improvement initiative for (A) birth companion present at delivery and (B) immediate initiation of breast.
Age-standardised rate (ASR) of smoking among men aged 15 to 69 years by product, and by two levels of education: 1998–2010. Age-standardised rate (ASR)
(A) Distribution of interviews conducted in each of the 21 countries.
Features of the app include tabs (from left to right) for posting events, the divisional calendar of events, the trauma center directory, and external.
Average score for each PDSA
Relationship between gross national income and number of medicines that are included both in the WHO and national Model Lists of Essential Medicines (EMLs)
Elevated blood glucose vs time.
Histogram of number of colony forming units (CFUs) after 24 hours of incubation between group 1 and group 2. Histogram of number of colony forming units.
Line chart of monthly antibiotic usage rate (AUR) (overall and that in infants with negative blood culture) in relation to the frequency of blood culture-positive.
Smoking prevalence by decade of birth cohort and gender: 1998–2010.
Endoscopic picture of ulcerative colitis with (A) Mayo grade 3 score with friable mucosa and large ulcers. Endoscopic picture of ulcerative colitis with.
Early initiation of breast feeding within 1 hour of delivery (ErBF1), deliveries attended by a skilled health provider (DSHP), and gap between DSHP and.
Key driver diagram for hepatitis B screening
Presentation transcript:

Cumulative colorectal cancer mortality and all-cause mortality in persons in Vejle and Copenhagen counties invited to screening and in persons in the rest of Denmark. Cumulative colorectal cancer mortality and all-cause mortality in persons in Vejle and Copenhagen counties invited to screening and in persons in the rest of Denmark. Andreas Bjerrum et al. BMJ Open Gastroenterol 2016;3:e000120 Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/