Design Calculations Combination Strings

Slides:



Advertisements
Similar presentations
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Advertisements

Well Design PE 413 Introduction and API Standards of Casing
PETE 411 Well Drilling Lesson 17 Casing Design.
MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing.
PETE 203 DRILLING ENGINEERING
Chapter 3 Casing design.
Present Procedure for cutting stuck casing on Drilling PLATFORM
Petroleum Engineering 406
Petroleum Engineering 406 Lesson 3 Well Control. Read Well Control Manual –Chapter 7-8 Homework 2 Due Jan. 30, 2001.
Lesson 20 Abnormal Pressure
DRILLING ENGINEERING Well Control.
Lesson 14 Jet Bit Nozzle Size Selection
Petroleum Engineering 406
Granite Wash Casing Profile Texas Panhandle (District 10) Western Oklahoma OKC Granite Wash Conference – March 6, 2008.
Reasons for Using Cementing Plugs Remove mud sheath Separate cement and Mud Prevent over displacement Surface indication Pressure test casing.
PETE 411 Well Drilling Lesson 5 Hole Problems.
Lesson 22 Prediction of Fracture Gradients
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
Petroleum Engineering 411 Well Drilling
SPRINGVILLE CITY WATER TANK AND WELL PROJECT WILLIAM GARNER, JEREMY FOWLER, AUSTIN JASPER The city of Springville has been experiencing a period of rapid.
Lesson 10 Drilling Hydraulics (cont’d)
Lesson 25 Well Control, cont’d
Drilling String Design
Outline Pore Pressure and Fracture Gradient Drilling Fluid Casing Design Cement Design Drilling Bit Economic Analysis.
Lesson 30 Cementing - cont’d
PETE 411 Well Drilling Lesson 9 Drilling Hydraulics - Hydrostatics.
Petroleum Engineering 406 Lesson 6 Well Control Unusual Operations.
Dual Gradient Drilling Basic Technology Confidential to DGD JIP
Lesson 18 Casing Design Example
DRILLING.
Gas Exploration Team Hail 7 Casing Design. Overview Wellbore Schematic Design and load assumptions Design Factors Casing Strings & Connections Details.
Well Design PE 413.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Lesson 26 * Well Control * * Variable Geometry *
Casing Design.
Petroleum Engineering 406 Floating Drilling
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
Hydrostatic Pressure Contents: How to calculate Whiteboards.
P16452 Active Reciprocating Compressor Valve Assembly Team: Negar Salehi, Bob Osborn, Ian Nanney, Keith Leung, Chris Reynolds.
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
1 Pressure Reducing valves. 2 3 Fill Valve / PRV Pressure Reducing Valve.
SATMathVideos.Net Water is pumped into an tank at 20 gallons per minute. The tank has a length of 10 feet and a width of 5 feet. If the tank starts empty,
Section 6-T14N-R94W Sweetwater County, Wyoming 13000’ Almond Test April 24 th, 2010 James Benson Kristin Carter Patrick Gardner Brandon Heiner Aaron Bounds.
oil Housing Drilling Floor Derrick Conductor 30” (or 36”) (Jet Cleaning.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
Cost Effective Offset Well Frac-hit Protection Solution
Design Factor Collapse
Chapter VIII Packer and Tubing Forces.
Design Factors The axial load on the casing can be either tensile or compressive, depending on the operating conditions.
CASING.
Chapter 2: Casing Design Introduction and API Standards of Casings
Oil-Field Hydraulics Chapter 7 Kick Fundamentals
Cementing How it is Done
Chapter 2: Casing Design Casing Selection
Chapter V Primary Cementing.
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Scope / History Well 25/11-G-18 was drilled nov The well has 7” Bakerweld 140 Screens and swell packers. The well is producing gas from the “heal”
Design Factors Collapse Corrected
Content Introduction Salient Points Offset well Analysis
Hydraulic Impedance Testing in Water Disposal wells in Oman
Casing Design Workshop
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Shell Exploration & Production
Chapter 2: Casing Design Calculations of Loads on a Casing
Historical Review of Dual and Multiple Completions
Casing Point Selection
Casing Design Workshop
Coal Bed Methane Cementing Best Practices
Presentation transcript:

Design Calculations Combination Strings Calculate the lower section, collapse Example TD 4000 ft, MW 10 #, 8 5/8” casing Assume empty pipe, the maximum condition Using a SF of 1.2 BHP 2496 psi K55 24# PC 1370 psi K55 32# PC 2530 psi Lower section is 32# next section 24# Depth of Bottom 24# section = 1370/.054 x MW x 1.2 = 2196 ft Length of 32# section 1804 ft, weight of section 57,744 # Stress 8327# se 50362 psi F1 = 2.978 F2 = .052 F3 = 1066.7 F4 = 2.00 F5 = .0348 Gives Elastic Lower 38.7 Plastic Upper 25.6 d/t 32.7 so transition mode

Design Calculations PcT = 1335 psi Sub this pressure back in, new Depth 2139 ft, Length 1861 ft weight 59,538 # stress 8585 psi se 50,202 New Pc = 1333 psi close enough Check joint strength 24# 263,000# SF 1.8 138,421#

Design Calculations Surface Casing Cement is circulated, so design for running. Mainly joint strength Intermediate String If cement is circulated, design for running. Check collapse for conditions while cementing. If not circulated, design must also take into account drilling conditions, at the TOC. Mud in the annulus and the possibility of empty casing. Burst pressure below the BOP.

Design Calculations So take the 8 5/8” casing example, The total weight of the string of 32 and 24# would be 113,120# JS of the 24# with SF 1.9 is 138,000# so that would hold. For circulated cement, assume the cement will weight 14.5 #/gal the plug displaced with water, 8.33 #/gal or a difference of 6.7 #/gal in the annulus or a gradient of .33 psi/ft. For a TOP, example 200’ of cement, start the calculations at that point. The burst for the top section is 2950 psi, suitable for 2500 psi wellhead

Design Calculations Production String Rarely circulated Design for drilling, completion and production. Collapse is designed using empty casing, possible during production if pumped with a rod pump, gas production without a packer Burst for completions work, frac job down casing top section is the weakest for burst Joint strength for running the casing