José de Beer Dick Coutts Hlangabeza Gumede

Slides:



Advertisements
Similar presentations
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Advertisements

IA-DMM Measures and Results for Year 1. Cohort 1 as of 6/23.
You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation. If you’d like to change.
Business Planning and Strategy Alignment Planning Process
Multiple Indicator Cluster Surveys Data Dissemination and Further Analysis Workshop Objectives of the Workshop MICS4 Data Dissemination and Further Analysis.
Important Idea, Skill or Attitude I learned from this course which I can use in my job: The advance facilitation processes (only stage 2: Clarify desired.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Calendar for 2011 Months of the Year with Holidays.
Page 1 Copyright © 2011 Jackson Consulting. All rights reserved. Jackson Consulting & [CLIENT] Confidential. :: (888)
3GPP2-A GPP2-SCG3GAdHoc/ R1 1 Montreal.
HPD_TAS COPA 26 March 2014 H Gumede. Discussion Points 2 1.Mining Charter and Culture Transformation 2.PoE Significance 3.PoE Discussion.
Chamber of Mines of South Africa Learning Hub Working together for a sustainable future since 1889 CHAMBER OF MINES OF SOUTH AFRICA The FOG MOSH Adoption.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
Mosaic Workshop - Ottawa
Mobilising for Behaviour Change (MBC) – Towards a leading Practice
MOSH Entry Examination and Making Safe Noise Team
MOSH NOISE TEAM Activities
Presentation to Hernic Ferrochrome
GCOS IP and Update on CEOS Response
MOSH NOISE TEAM Activities
MOSH Noise Team Presentation to CM&EE August
Essential Climate Variables (ECVs) and the ECV Inventory
PROCESS THAT TANZANIA HAS ADOPTED IN PREPARATION TO IMPLEMENT THE EUEI
MOSH Entry Examination and Making Safe 17 May 2012
MOSH NOISE TEAM Activities
MOSH Entry Examination and Making Safe Noise Team
Modification Proposal 255 – LSP Objection Rates 2nd Sample Report
Suggestion for next steps for PGA for REDD+ in Vietnam
MOSH Entry Examination and Making Safe
MOSH Entry Examination and Making Safe
Travel industry $8 trillion annually.
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
Industry Buy and Maintain Quiet initiative update
MOSH NOISE TEAM Activities
MOSH Leading Practices Adoption System
MOSH NOISE TEAM Activities
Spiritual Leadership Development
NOISE RISK ASSESSMENT Kagisho Motseme
MOSH NOISE TEAM Activities
Post Demonstration Workshop
تكملة الوحدة الاولى الفصل الثاني بالكتاب للاطلاع ثم الفصل الثالث التخطيط لبناء الاختبارات التحصيلية الفصل الثالث من الكتاب (87-164)
GEO Status Report 13 Sep 2017, CEOS SIT Technical Workshop, Frascati
Presenter: Marlize Pistorius/Gwen Lehloenya
Industrial Training Provider ,
Feedback on verification exercise for proposed leading practice of supplements to a mine Hearing Conservation Programme that include the use of OAEs, coaching.
MOSH Noise Team Presentation to JS August
HPC Presentastion 7 March 2014.
For-Hire eVTRs in the Mid-Atlantic
Introduction to the MOSH Adoption System
Overall Project RAG Status
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Workshops, Assignments and Work place visits
Forecast Verification
Preparations for CEOS Plenary
CHAMBER OF MINES OF SOUTH AFRICA
Leading Practice Implementation Guide
DSC ChMC CSS Consequential Update 13th March 2019
Development of energy balance statistics
THE MOSH ADOPTION SYSTEM
Mexico 8th Meeting of the Steering Committee of INTOSAI Committee on
Leading Practice Implementation Guide
MOSH NOISE TEAM Activities
Gas Customer Forum DN Interruption Update - Introduction
Weekly Fire Stopping Progress Meetings Held
Transmission Workgroup July 2012
Agenda for All English Classes Tuesday, October 8 Learning Target:
Document CWG-SFP-2/7-E 4 August 2017 Original: English
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Leading the change to zero harm
Calendar Overview – Phase II – REVISED April 2019
Presentation transcript:

José de Beer Dick Coutts Hlangabeza Gumede Noise Adoption Team José de Beer Dick Coutts Hlangabeza Gumede 15th August 2013

Contents Key activities/highlights of the month Lowlights Key lessons learnt Future activities

(Achievements, Industry Interactions) Key Team activities for the Month (July-August 2013) No Highlights (Achievements, Industry Interactions) 1. HPD_TAS Adoption Completed customization of LB&BC plans for all mines with mine adoption teams 07 Aug 2013 – ARM Modikwa Adoption team training 19 Aug 2013 – Impala Adoption 04 Sep 2013 – Lonmin Induction 11 Sep 2013 – Sasol Mooi Nooi Induction 2. Verification exercise for potential LP 1st stage indications – Practices exist, but require refinements Currently on 2nd/3rd stage of verification Final verification to be presented to the industry team meeting – 02nd October 2013 20 Aug 2013 – OAE Verification – Glencore Xstrata Mototolo Platinum 03 Sep 2013 - Customized HPD System - Impala Platinum 03 Sep 2013 – Lashing unit Shaft Sinkers

(Achievements, Industry Interactions) Key Team activities for the Month (July-August 2013) No Highlights (Achievements, Industry Interactions) 3. Industry wide “Buy quiet” Initiative Continuing with consultations 24 July 2013 - CM&EE 24 July 2013 - MPA’s 30 July 2013 - CEO endorsement 21 Aug 2013 - Mini workshop Lowlights of the month (July-August 2013) No Lowlights 1. 23 July 2013 – BECSA cancellation of HPD induction training .

Necessity of COPA’s for HPD_TAS Key lessons learnt No Key Lessons learnt 1 COPA’s Necessity of COPA’s for HPD_TAS Future activities No Future activities 1. Sponsor meeting – 26 September 2013 Industry meeting – 02 October 2013 .