Status of Pixel Test Niigata University/RIKEN Kohei Fujiwara.

Slides:



Advertisements
Similar presentations
PID Control Loops Guy Zebrick.
Advertisements

Solving Quadratic Equations by Completing the Square
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Radiation damage in silicon sensors
1 Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory LCFI Status Report: Sensors for the ILC Konstantin Stefanov CCLRC Rutherford Appleton Laboratory.
J.A. Ballin, P.D. Dauncey, A.-M. Magnan, M. Noy
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Hybrid pixel: pilot and bus K. Tanida (RIKEN) 06/09/03 Si upgrade workshop Outline Overview on ALICE pilot and bus Requirements Pilot options Bus options.
Status of Indium Bumped FE-I4B Richard Bates, Craig Buttar, Kate Doonan, John Lipp, Thomas McMullen 28/03/2014.
Number bonds to 10,
A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
STATUS OF MEDIPIX-3, PLANS FOR TIMEPIX-2 X. Llopart.
Naming Convention HFT PIXEL 12-June pixel identification sector – ladder – chip - row - column 1-10in out1 out2 out Alternative.
QUAD MODULE TESTING 18 th January 2013 Kate Doonan University of Glasgow.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
Naming Convention HFT PIXEL 12-June-2009 Updated 03/08/2013 By LG to include row and column information for Ultimate sensors.
MEDIPIX3 TESTING STATUS R. Ballabriga and X. Llopart.
Bump Bonding and Thinning of Hybrid Pixel Detectors Kiyoshi Tanida (RIKEN) Johann M. Heuser (RIKEN) PHENIX upgrade workshop, Aug 2002 Contents Bump bonding.
Wojciech Dulinski Mimosa-18 (High Resolution Tracker) IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France Mini.
Ladder QA manual. Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than.
FPIX_flip_chip_test module calibration tests November 14 th 2012.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
22nd June, 2004New Zealand - Australia Semiconductor Instrum'n W'kshop1 Leveraging HEP Silicon Technology ( Example: VA Chip Application to PET) Geoffrey.
Ladder QA manual. Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than.
VTT ASSEMBLY 5 CHARACTERISATION KATE DOONAN & RICHARD BATES 2012.
CEA DSM Irfu 20 th october 2008 EuDet Annual Meeting Marie GELIN on behalf of IRFU – Saclay and IPHC - Strasbourg Zero Suppressed Digital Chip sensor for.
DESIGN CONSIDERATIONS FOR CLICPIX2 AND STATUS REPORT ON THE TSV PROJECT Pierpaolo Valerio 1.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
Hybrid Pixel R&D After BTeV As of two years ago: –FNAL-designed readout chip had two minor fatal flaws. –No system demonstration had yet been done. An.
Status report of test procedures for the readout pixel chips in Catania F.Riggi ITS Meeting, June 2002.
BTeV Hybrid Pixels David Christian Fermilab July 10, 2006.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Wafer probing in Legnaro/Padova E. Fioretto Laboratori Nazionali di Legnaro for the LNL-Padova SPD Test Group 04/02/2003 E. Fioretto INFN - LNL SPD Meeting.
C.V. S.W. T.S. L.G. X.S. M.S. IPHC-LBL meeting, January 22, Probe Test Results for 5 wafers of Ultimate-2 sensors Outline:  Yield and wafer.
CMS Pixels: Fermilab Farah Fahim, Gregory Deptuch, Jim Hoff, Alpana Shenai, Marcel Trimpl.
Pixel detector development: sensor
-1-CERN (11/24/2010)P. Valerio Noise performances of MAPS and Hybrid Detector technology Pierpaolo Valerio.
Transition to cables Staves Services IP Underside of stave: IBL modules IBL Design.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
MIMO  3 Preliminary Test Results. MIMOSTAR 2 16/05/2007 MimoStar3 Status Evaluation of MimoStar2 chip  Test in Laboratory.
The Silicon Pixel Detector (SPD) is part of the Inner Tracking System (ITS) of the ALICE experiment. ALICE is designed to study the properties of strongly.
Silicon strip detector R&D issues –readout chip decision –interface with PHENIX –ladder Technical options –SVX4 or MVD-TGV+AMU/ADC recut –other sensors.
Manqi Ruan Discussing & Support: Roman, Francois, Vincent, Supervisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua)) DQ Check for CERN Test.
The medipix3 TSV project
NEWS FROM MEDIPIX3 MEASUREMENTS AND IMPACT ON TIMEPIX2 X. Llopart CERN.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
RIKEN/CERN pixel electronics/bus R&D plans Johann M. Heuser RIKEN - Radiation Laboratory PHENIX Silicon Upgrades Meeting 10 April 2003.
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Sensors Pixel dimension 300 x 300 μm2 Standard p-in-n sensors
Si Sensors for Additional Tracker
Study of Indium bumps for the ATLAS pixel detector
New Mask and vendor for 3D detectors
Preliminary results from 3D CMS Pixel Detectors
Hybrid Pixel R&D and Interconnect Technologies
TPAC1.0 Jamie Crooks.
RIKEN VTX Software Meeting
Roberto Dinapoli CERN-CEM II,Montpellier For the ALICE Collaboration
Radiation Laboratory Meeting
Test Beam Measurements october – november, 2016
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
Silicon pixel detectors and electronics for hybrid photon detectors
Hybrid silicon pixel detector (readout chip)
Beam Test Results for the CMS Forward Pixel Detector
3E7_05151 wafer 11 IV curve Noise ~122e Source scans bad and
Presentation transcript:

Status of Pixel Test Niigata University/RIKEN Kohei Fujiwara

Current status Prober at RIKEN has been set up in Wako. –17 wafers were probed completely at CERN. –18 th wafer is under probing at RIKEN. –Currently, we have 501 class1 chips. –We need 600 chips. Kohei has just learned how to probe ladders at CERN.

RIKEN Prober Prober at RIKEN is working in our clean room. –The temperature is 20. –The humidity is 70%. (It will be improved.)

Current status of wafer probing We have 501 Class1 chips. The yield rate is 33.6%. The most of problem chips were recovered. It depends on the condision of top of needles. They needed to includes VDD_Analog. 100 chips are expected with 4 wafer in 33% yield.

Current status of wafer probing 2 Pixel existence rate on Class 1 chips The most of pixels work on each chip. The frequency of dead pixel appearance The most dead pixels are in around test columns. No.1, No.9, No.17 and No.25 Test columns 100%

Current status of wafer probing 3 Mean threshold of Class 1 chips is 1508e e - in 200μm Silicon by MIP. Mean noise of Class 1 chips is 116e -.

Ladder Test I have probed 4 PHENIX ladders at CERN. We check bump bonding condition with β source. Probing takes about 30 minutes. Only 1 senser assembly has only 1 noisy pixels on 4 th chip of Ladder No.4. A noisy Pixel

Ladder Test 2 The other ladders are good. –Ladder No.1 Some missing bumps on 4 th chip. Bump bonding error

Ladder Test 3 2 nd Ladder Bump bonding error 3 rd Ladder

Ladder Test 4 Minimum threshold of one sensor assembly is 3089e -. Noise value is 284e -. Bump bonding error map –It seems that the error happens easily at the bottom corner on the left corner. Missing bumps Column Row

Summary Prober at RIKEN is working in Wako. –Wafer probing is continuing. –I have just probed up to No.59 on 17 th wafer. 17 readout-chip wafers have been probed. –501 Class1 chips are obtained. 4 PHENIX ladders have been probed. –Some missing bumps and a noisy pixel. –More than 99% pixels are working. We will start probing PHENIX ladder at RIKEN by the end of June.