Customer Overview Pack – July 2018

Slides:



Advertisements
Similar presentations
CWS/CMS Application Server Refresh Project Kickoff May 1, 2008.
Advertisements

D-Link Assist Introduction Neil Patel October 2010.
Annie Griffith Infrastructure Programme Manager 12 th July 07 Gemini Oracle Software Upgrade (OSU) Project.
1 Customer Network Operations Center. 2 Agenda Overview Benefits Value Additional Services Questions Monitoring Options.
COR1000 Telecoms Project UK Link Committee Update September 2012.
DBS to DBSi 5.0 Environment Strategy Quinn March 22, 2011.
Life cycle services for automation products
Infrastructure Solutions Flexible Adaptable Dependable Reputable.
COR1000 Telecoms Project UK Link Committee Update May 2013.
1 June 2012 COR1000 Telecoms Project UK Link Committee.
IPitomy SIP Trunks 101 Programing and activating SIP Trunks with IPitomy’s assisted turn-up.
The products of this company are quite reasonable as well as durable. One such is used by me these days and it has a long lasting battery, clear picture.
Local Points of Contact Webinar
Faculty Mentoring Program for Students with Disabilities
Food Suppliers Implementation of EDI &PAV March 2010
Finance Brief June 2016.
Grow Your Business with Cisco Capital!
Information Technology (IT) Audits
Adastra v3 Reporting & National Quality Requirements
Performance Data Collection and Reporting (PDCR)
Chapter 18: Introduction to Assurance
Web Site Maintenance Strategy
OpenEye Sales Engineering
UK Link Technology Refresh
Windows Server 2012 Standard Additional License After Point of Sale (APOS) version for OEM What is the new Windows Server 2012 Standard Additional License.
Domain Matching for Contract Association Requests
Customer Overview Pack – September 2018
HSCN- TACO Programme 26th April 2018.
Customer Overview Pack – August 2018
SmartMeterTM Steering Committee Update – September 2012
Placing an order for Etherway Fibre and Etherflow Connected
Business zone Ethernet – Ordering a Radio Survey
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
Who is Wilder Research and how do we support PBIS Schools?
Placing an order for Etherway Copper
A Managers Guide to Parental Leave
DSC Delivery Sub-Group
THIRD PARTY ACCESS RE-LAUNCH 30th December.
Systems Analysis and Design
The initial step on your ABB care journey
TransformUs Programme
Rubicon Q&A May 9th, 2017.
Xoserve IX Refresh Update
Customer Overview Pack – September 2018
Xoserve IX Refresh Customer Update 12/02/2019.
Customer Overview Pack – July 2018
От Всемирного Дня к Всемирному Запуску IPv6. В этот раз по-настоящему
Approach to Market Cutover - Draft for Discussion
Xoserve IX Refresh Customer Update 30/10/2018.
SmartMeterTM Steering Committee Update – July 2012
Xoserve IX Refresh Customer Update 03/01/2019.
Xoserve IX Refresh Customer Update 04/04/2019.
TransformUs programme
TransformUs Programme
POST GRANTS APPOINTMENT SERVICE A UKVI/DWP JOINT INITIATIVE
Construction Contract Administration
COR1000 Telecoms Project UK Link Committee Update
The Early Help Assessment Journey. Request for Early Help Support Form. Support for OUR Early Help Partner Agencies.
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
COR1000 Telecoms Project UK Link Committee
Xoserve IX Refresh Customer Update 05/03/2019.
Xoserve IX Refresh Customer Update 04/04/2019.
What about our Network!? Brainstorm 2019
Xoserve IX Refresh Customer Update 01/05/2019.
Xoserve IX Refresh Customer Update 30/07/2019.
Xoserve IX Refresh Customer Update 30/07/2019.
Co-production: Enablement Tracking & Reporting
and Forecasting Resources
HOME AFFAIRS IDENTIFICATION SYSTEM (hanis)
Xoserve IX Refresh Customer Update 09/10/2019.
Presentation transcript:

Customer Overview Pack – July 2018 Xoserve IX Refresh Customer Overview Pack – July 2018

Migrating IX Services to our new partner What are we doing? Xoserve is changing it’s network service provider from Vodafone to Gamma and therefore will be replacing all IX equipment. We have asked all our IX customers to complete a Site Survey to enable us to capture accurate site contact details, access requirements and site specifications to enable a customer centric approach to roll-out. Alongside our separation from National Grid the Vodafone IX contract was also coming to an end which meant we had the opportunity to consolidate all our network services under one contract. All current hardware, except new or recently upgraded sites, is five to seven years old and needs to be replaced as ‘end of life’. Why are we doing this? Gamma will provide all service up to and including the router (network services) – Gamma will be responsible for the set up of connections and maintenance of them (as per current contract).Gamma’s partners will be responsible for the server and related software & on-going maintenance of it. Who is providing the service? When will it happen? A pilot started in June and full roll-out will commence from July 2018. Customers will be contacted directly to discuss their installation plans. Any new customers or those that have recently upgraded their IX service may be at the end of the rollout. Who do I contact in Xoserve? Dedicated point of contact – please direct any queries to; box.xoserve.IXEnquiries@xoserve.com or call 0121 623 2773

Why did we need a Site Survey? IX Site Survey The survey enabled us to capture accurate contact details, access requirements, site specifications and site specific procedures, ensuring we have up to date information to plan your programme of work and related site visits. The information provided is being shared with Gamma and their sub-contractors to enable them to migrate you to the new IX Service. Why did we need a Site Survey? As at 3rd July, we have received 121 responses (71%), and 41 of you (24%) are talking to us and we hope to have your site information soon. We have yet to achieve contact with 8 sites (5%) but we are actively pursuing contact. If you would like to check whether your survey has been submitted, please contact us at box.xoserve.IXEnquiries@xoserve.com or call 0121 623 2773 The survey information is a direct feed into the roll-out plan, therefore the closing date has been extended to the end of July 2018. Without your site survey details we are unable to plan in your works with any certainty and your roll-out may be delayed. As the existing kit is end of life, please make every effort to assist with the survey and the on-site activity. How have we done so far?

IX Service Line Options Xoserve are replacing your IX kit on a ‘like for like’ basis, therefore your replacement IX service option and contract will match the IX option you currently have, which will be one of the following: Option 1 - Primary ADSL and Back-Up ADSL connection Option 2 - Primary EFM and Back-Up ADSL connection Option 3 - EFM Primary and EFM Back-Up connection Option 4 - Primary Fibre/ Ethernet and Back-Up ADSL connection The following slides displays the on-site installation process; the number of site visits that are required is dependant upon your IX service line option complexity.

Your Customer Journey The number of days required to complete the activity will be dependant upon your IX Service option IX Survey Response A number of remote off-site activities also take place to assess your site’s requirements and to set-up and test connections and configure hardware Comms Circuit Installations Up to 4 Hours Service Interruption Comms Router Installation Your survey responses are being used to define the roll-out plan Comms Server Installation Circuit order will start from July2018. Xoserve and Gamma will notify you directly to agree your installation date Comms Legacy Kit Decommissioning Engineer(s) will visit your site to install new circuits; the number of site visits and the access method will vary according to your IX service option and site complexity The Router Installation will take place in one site visit Key: Site Visits The new server will be installed with the existing Vodafone server still in situ to enable a fall-back position. Where rack space concerns exist, we will address this on a case by case basis Comms Notes Your old service will be removed and wiped by Vodafone and disposed of in accordance with regulations

Next Steps June IX Site Survey responses and IX utilisation during 2018 considered as part of the roll-out plan July Xoserve and our partners will begin to reach out to agree your circuit installation dates July New Circuit Installation & Connectivity Testing starts Aug Direct one to one communication activity begins