The New Trigger/GPS Module for the EEE Project

Slides:



Advertisements
Similar presentations
1 MTD Readout Electronics J. Schambach University of Texas Hefei, March 2011.
Advertisements

TOF0 calibration The resolution in a given pixel can be measured before the absolute time calibration (see the plot) The expected total resolution of the.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
The GANDALF Multi-Channel Time-to-Digital Converter (TDC)  GANDALF module  TDC concepts  TDC implementation in the FPGA  measurements.
Calibration of the calorimeter by punch-through muons and cosmic muons Doroshenko M. E391 collaboration.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
Detectors and read-out DetectorNo. of ch.Read-out method Device candidates CsI(Tl)768Flash ADCCOPPER + 65 MHz FADC FINESSE Active Polarimeter600 x 12 x.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
Lab Group L2Bx EECE 380 – Electrical Engineering Design Studio (Spring 2014) 1 Spectrum Analyzer Michael Halpenny-Mason, Presenter 2, Presenter 3, Presenter.
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
C. Combaret DIF_GDIF_MDIF_D ASU 6x 24 HR2 ASU USB Hub RPi USB2 DCC SDCC RPi USB 1 hub+Rpi for 4 cassettes 1 DCC for 8 cassettes (1 spare) Trigger.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
TELL1 high rate Birmingham Karim Massri University of Birmingham CEDAR WG Meeting – CERN – 26/03/2012.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
TELL1 readout in RICH test: status report Gianluca Lamanna on behalf of TDAQ Pisa Group (B.Angelucci, C.Avanzini, G.Collazuol, S.Galeotti, G.L., G.Magazzu’,
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
TLU plans 21/03/20161 D. Esperante, Velo upgrade meeting.
EAS Time Measurements P.K.Mohanty (On behalf of the GRAPES-3 Collaboration) 5 th Workshop on AstroParticle Physics, 14 – 16 December 2010 at CRL, Ooty.
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Electronica para los detectores Cherenkov de LAGO Rubén Conde*, Humberto Salazar* and L. Villaseñor ** * Facultad de Ciencias FisicoMatematicas, BUAP,
F. Odorici - INFN Bologna
Work on Muon System TDR - in progress Word -> Latex ?
End OF Column Circuits – Design Review
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Results with the RPC system of OPERA and perspectives
Andreas Horneffer for the LOFAR-CR Team
Speaker: Kurenya A.N. Head: Petkov V.B. BNO INR RAS
CALICE Readout Board Front End FPGA
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
The Totem trigger architecture The LONEG firmware archtecture
An FPGA Implementation of a Brushless DC Motor Speed Controller
Data acquisition system for the Baikal-GVD neutrino telescope
GRAND instrumental challenges
KRB proposal (Read Board of Kyiv group)
Analysis and paper on chamber and telescope performance
TDCB status Jacopo Pinzino, Stefano Venditti
The Monitoring System of the ARGO-YBJ Data Acquisition
MCPPMT test bench at LAL D. Breton, L. Burmistov, J. Maalmi, V
Setup for measurements with SCT128 in Ljubljana: SCTA128VG chip
Hellenic Open University
Vertex 2005 November 7-11, 2005 Chuzenji Lake, Nikko, Japan
Front-end electronic system for large area photomultipliers readout
Status of n-XYTER read-out chain at GSI
Design and Test for Lumped Scheme of WCDA Readout Electronics
TOF Clock Distribution
Commodity Flash ADC-FPGA Based Electronics for an
Fiber Based Synchronous Timing System
Tests Front-end card Status
Mott DAQ Timing R. Suleiman February 12, 2014.
A new Trigger/GPS Unit for the EEE Project
PID meeting Mechanical implementation Electronics architecture
Study of timing properties of single gap high-resistive bakelite RPC
A new Trigger/GPS Unit for the EEE Project
Digitally subtracted pulse between
Synchronization and trigger management
Readout electronics system for Laser TPC prototype
Presentation transcript:

The New Trigger/GPS Module for the EEE Project NIM template The New Trigger/GPS Module for the EEE Project Keywords: Multigap RPC, EAS detection, Muon detections, Trigger system, Time stamping, Timing GPS

The Data Acquisition System EEE Trigger/Gps System Sections Abstract The EEE Project The EEE Telescope The Data Acquisition System EEE Trigger/Gps System Trigger Unit GPS Interface Time Resolution Measuremets Conclusions Detectors array inside school buildings  synchronization

The Data Acquisition System EEE Trigger/Gps System Sections Abstract The EEE Project The EEE Telescope The Data Acquisition System EEE Trigger/Gps System Trigger Unit GPS Interface Time Resolution Measuremets Conclusions

The Data Acquisition System EEE Trigger/Gps System Sections Abstract The EEE Project The EEE Telescope The Data Acquisition System EEE Trigger/Gps System Trigger Unit GPS Interface Time Resolution Measuremets Conclusions

The Data Acquisition System EEE Trigger/Gps System Sections Abstract The EEE Project The EEE Telescope The Data Acquisition System EEE Trigger/Gps System Trigger Unit GPS Interface Time Resolution Measuremets Conclusions

The Data Acquisition System EEE Trigger/Gps System Sections Abstract The EEE Project The EEE Telescope The Data Acquisition System EEE Trigger/Gps System Trigger Unit GPS Interface Time Resolution Measuremets Conclusions Only «more» important things Better description about the trigger shape signals - Over-determinated clock mode

Delay betweem the two 40 MHz clocks to the TDC

Delay between the PPS signal front and the disciplined 40 MHz clock

Conclusions The new version of EEE Trigger-GPS board Performances are consistent with the experimental requests and specifications

Spare slides There is a cables length difference Spectrum analyzer  Δt = 14.7 ns

V.1 V.2