n/o back to back kitchens

Slides:



Advertisements
Similar presentations
Drive-Up Appeal Shrubs & trees Landscaping Front door Outside paint.
Advertisements

The Unit Owners Association of the Madison, A Condominium Building Revitalization (Work Completed & Upcoming Work)
(Builder Marketing Message) (Builder Logo) Consider adding your logo to the master slide.
Punch! Pro Platinum Home Design
Hogan Residence Valued Repeat Customer Kitchen Remodel Kitchen Remodel See other presentations: See other presentations: Basement Bath Addition Basement.
4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie.
SETUP Chapter 6 Lead Abatement for Workers Course.
Wilson School Construction 2014 Tearing out the old courtyard to put in the new sewer line.
Here is an office or den.. You see a desk with computer on top and a big chair.
Keeping Your Home Free of Pests and Harmful Pesticides
Clean-up Steps Remove water Empty Contents Remove water, mud & muck Remove wall materials and etc. Wash Sanitize Ventilate & dry.
THE SUMMER OF CHANGE Things are happening ….. WEEK ONE.
KITCHEN planning guide merillat - woodharbor - ultracraft - executive CLIENT INFORMATION Date___________________________ Name________________________________Phone.
How to update your kitchen for under $1,000. This is the before picture Here were some of the issues: –Kitchen has 30+ year old cabinets. The white dishwasher.
Identifying Information: Common Areas - 1 none LEVEL 2.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
HVACR116 – Trade Skills Mechanical Drawings.
Section C Nonstructural Protective Measures
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
After we had thought about why waste was so important, we thought about what we could do about it. Just as an example, we started by looking at waste water.
Interior Painting How to paint like a pro.. Step 1: Preparation Remove as many items from room as possible Cover any remaining furniture & floors Remove.
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
BAY AREA, CA HOME CLEANING TIPS CONTACT US:
Components of Construction part 2
"This document can not be used without Samsung's authorization"
GCSE SUPPORT EVENING.
TOBY ZACK DESIGNS LA MER
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
MESSIAH COLLEGE MAIL HOW IT WORKS!!!.
Gamble Rogers 2018Washington, DC Trip.
Major Steps In Building a SFR
Learning Objectives • Add various components to a building model.
Assembly And Installation Of Ikea Kitchen Cabinets
The statue of liberty picture is the one I created and uploaded to the puzzle making website. If your students do not have devices, you can print this.
Maintenance of the On-Lot Sewage System
FLOOR PLANS CHAPTER 7 – PART 1.
Electrical Gas Plumbing Heating & Cooling
Fire Protection Survey Procedure
How to Keep Your Kitchen Free from Insects
WESLEYAN P JUDD HALL STAIRWELL LIGHTING REPLACEMENT PROJECT
Typical Plumbing System
Walking – Working Surfaces
Mission Hall Updates Ask & Learn Christine Shaff UCSF Real Estate
F Bathroom and E bedroom wall
Both D bathrooms and e kitchen What makes you special!
Boulevard PROFESSIONAL CENTER
Consulting Captains, LLC
RISER PROJECT L, m, l/m kitchen.
STUDENT FINANCIALS YEAR END PROCESSES
Slip, Trip, Fall Are four letter words Presented by: Dan Klimek
How to Spot a Great Interior Paint Job
G kitchen What makes you special!
Preparing Your Home to Attract Buyers
Walking – Working Surfaces
J bathroom/ hi bedroom/ I kitchen
Walking – Working Surfaces
ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019
Breakfast bar – curved base units
Algebra 3 Pre-Calculus Mrs. Foreman Supplies Needed - Pencils, Red Pen, and Paper (Only pencils.
Attendance Class starts at the first bell, after that bell, you will receive a tardy, after the second class bell, students not in their classroom seat.
A/B and h/i TIER back to back bathrooms
RISER PROJECT F bathroom.
Project 2018 October 31, 2018.
C bathroom/AB and B Kitchens
Camp Selection Form Montessori Corner
Shugborough th- 12th May Please turn off all mobile phones.
Community Practice Asset Management.
The cleaning procedures for Operating Suites are broken into 2 groups.
The Country Outhouse assembly Instruction By Laser Dollhouse Designs
Presentation transcript:

n/o back to back kitchens RISER PROJECT n/o back to back kitchens

Why you are special! Access to an “n” kitchen might be thru the “o” kitchen and vice versa!

Which one? “N” or “O”? The side that would be the easiest/least expensive to dismantle – no backsplash, old cabinetry, etc. In case of a tie, “n” unit because tenting isn’ t as invasive.

General information When you see floor protection in the main hall from the service elevator to your unit you know we will probably be there the next day to start removing the wall. floor Protection will be placed from your front door to your kitchen and will remain until your unit is complete Monday thru Friday, Work will start at 8am. Since the sinks must be functional before the plumbers leave, it may continue until after 5pm.

General information - continued At the end of each day there will be water in the kitchen that did not have a wall removed There will be a lot of noise The service elevator will be used intermittently to bring in pipes, etc.

General information - continued When complete, the walls affected will be patched and prime painted Cabinets , sinks and countertops will be re-installed Ceiling to floor protection will be put up at kitchen (both sides in case of “N”) and will remain for the duration of the project

The lay of the land ‘N” KITCHEN “o” KITCHEN

Wall opening for pipe exposure Kitchen

Now it gets ugly!

Some positives… Cleaner water Hotter water Better water pressure Shut-off valves are under the sink

Time line (using the term loosely) The first day the contractor makes the hole in the wall – starting on the 19th floor. The following day the plumbers start working the plumbing and construction will take approximately 3-4 weeks All dates and times are subject to change without notice

How to prepare Provide a copy of your unit key, mark it clearly with unit number and Drop It in the office mail slot If you do not have a duplicate key – have one made All keys will be kept until after that riser is complete – you may not pick them up, at the end of each day Keys will be kept in the management office Remove any decorative key rings

How to prepare - continued Plumbers and contractors will be coming in and out of your units every day of the project If you have pets - who want to bolt out the front door - put them behind a closed door or gate Put a post-it note on your door telling the contractor that you have a pet or pets (how many?)

How to prepare - continued All of these ‘Housekeeping’ items should remain, in place for the duration of this kitchen riser. if your kitchen is not being dismantled: MAKE A CLEAR PATH FROM YOUR FRONT DOOR TO YOUR SINK Remove everything around and under your sink Empty your dishwasher

How to prepare - continued IF YOUR KITCHEN IS BEING DISMANTLED REMOVE Everything from the cabinets above AND BELOW the sink REMOVE EVERYTHING FROM YOUR “sink wall” COUNTERTOP Remove everything from your dishwasher Cover the furniture in the work area Your kitchen will have limited access and there will be no running water for 7 to 10 days