MOD_27_18 Martin Kerin 06th September 2018

Slides:



Advertisements
Similar presentations
Article XXXVI – Signature, ratification, acceptance, approval or accession 1. – This Protocol shall be open for signature in Berlin on 9 March 2012 by.
Advertisements

1 Mod_24_10 Introducing Loss of Profits as a Relevant Damage within the Limitation of Liability Provisions.
Modification MOD_24_12 Amendments to the MIUN Calculator to address instances of Excessive Area.
Reliable Power Reliable Markets Reliable People Rule 6.6 Recommendation Update January 29, 2009.
Market Systems Release Update Modifications Committee Meeting 49 June 13 th
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 25 September 2012.
Hour Ahead Dispatchable Loads Applicable Updates to Procedures Presentation to the Market Operations Standing Committee April 23, 2003
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
RPS Bidders Workshop May 11, RPS Bidders Workshop Guidance for Inputs to PPA May 11, 2007.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
INDIAN TAKEOVERS Meaning Of Acqusition: When an “acquirer” takes over the control of the “target company”, it is termed as takeover. When an acquirer.
Market Operations Standing Committee MOSC October 19, 2005 Pat Doran.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
Current FRRS Language & Explanation of Posted Data
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Submittal And Review Of New And Revised Water Quality Standards
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Content of Tender Dossier - Instructions to Tenderers - Tenders
Congestion Management and Ramp Rate for Delivering Ancillary Services
UFLS Workshop Discussion #3
Water Quality Standards Submittal & Review Process
Content of Tender Dossier Instructions to Tenderers
Particular Conditions of Contract & Appendix to Tender
MOD_04_17 Solar in the SEM 9th June 2017.
Market Trials Open Market Participant Call
Agenda 5.11 General Regulations
Particular Conditions of Contract & Appendix to Tender
GTAC Workshop Block 5 19 September 2018.
Julie Woosley, Division of Waste Management
TSC Modifications Panel Meeting
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Use of Technical Offer Data in Instruction Profiling / QBOA
Mod CMC_03_18 Unique circumstances may arise whereby the Transmission System Operator or Distribution System Operator requires additional time to formulate.
Correction of Minor Material Drafting Errors
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
MOD_19_18 Part B Housekeeping 1 21st June 2018.
Redefinition of Schedule Production Cost
Ex Ante Quantities Deferral
Paragraph 14 Table 2: Mod_15_18 – IP/QBOA
Definition of “Day 2 Deployment Date” Mod-11-17
Interim Suspension Delay Periods
MOD_13_17 V2 Deferral of SEM NEMO Credit Reports and Non-acceptance of Contracted Quantities 13th March 2018.
Credit Cover Signage and Subscript Correction
Summary Issue Modification Aim Effect of the mod Impacts
Julie Woosley, Division of Waste Management
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
MOD_05_19_V2 Amendment to Uninstructed Imbalance Charge (CUNIMB) to correct for negative price scenarios 11th April 2019.
MOD_28_18 Martin Kerin 06th September 2018
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
MOD_03_19 Amended application of the Market Back Up Price if an Imbalance Price(s) fail to calculate Energia.
Mod_06_18 – PMEA Theoretically there should always be at least one Bid Offer Acceptance (BOA) Quantity which is unflagged and is therefore the Marginal.
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Rule Adoption Process Under IC 22-12, 22-13, 22-14, 22-15
Correction to No Load Cost - “and” vs “or”
Market Pricing Initiatives Update September 9th, 2003
Customer Issue Management CoMC Update
Joint Office UNC Elections
Joint Office UNC Elections
Mod_10_19 Removal of Negative QBOAs Related to Dispatchable Priority Dispatch Units from the Imbalance Price 27th June 2019.
Correction to COP and clarification to CNLR
Captured Carbon Renewable Energy Route to Market Consultancy Trading.
Joint Office UNC Elections
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Presentation transcript:

MOD_27_18 Martin Kerin 06th September 2018 Interim arrangements in Appendix O for Instruction Profiling and Bid Offer Acceptance Quantity Outcomes in a Subset of Undo Scenarios Martin Kerin 06th September 2018

Proposed approach high level: MOD_27_18 – Subset of Undo Scenarios Proposed approach high level: There are a number of scenarios, the occurrence of which would be expected to be relatively rare, which have been observed as part of certification that the outcome in systems is different to that in rules; In order to move towards substantive compliance under certification, for a period of time until these defects have been remedied and can be deployed to the live system, interim provisions which outline the outcome in the scenarios affected will prevail.

MOD_27_18 – Subset of Undo Scenarios Change in approach for interim provision dates versus what is in modification proposal to standardise with other provisions: H.15.2.1-6: “Until the date that is [six months] after the Cutover Timethe MOD_27_18 Deployment Date, paragraph 10 of Appendix O shall be replaced with:” In the glossary: Mod_27_18 Deployment Date means the date proposed by the Market Operator following discussion with the Modifications Committee, and approved by the Regulatory Authorities for the purpose of H.15.2, such date to be published on the Market Operator web site at least three Working Days in advance of the date concerned.

MOD_27_18 – Subset of Undo Scenarios Scenario 1 – MWOF undo over a time boundary (H.15.2.2 for Table 2 and H.15.2.4 for Table 3): If a subsequent MWOF Dispatch Instruction has an Instruction Effective Time which is between the Instruction Effective Time of another prior MWOF Dispatch Instruction and the Instruction Effective Time of that prior MWOF Dispatch Instruction’s corresponding PMWO Pseudo Dispatch Instruction that would nominally be created, and if the time the Target Instruction Level would be reached following the trajectory of either the prior or the subsequent MWOF Dispatch Instruction is in a different Imbalance Pricing Period or Imbalance Settlement Period, as applicable, to the Instruction Effective Time of the corresponding MWOF Dispatch Instruction, then Step 1 shall be changed for the prior MWOF Dispatch Instruction such that the time the trajectory for the Physical Notification Instruction Profile to reach the Target Instruction Level for the prior MWOF Dispatch Instruction shall be taken to be equal to the Instruction Effective Time of that prior MWOF Dispatch Instruction;

MOD_27_18 – Subset of Undo Scenarios Scenario 1 – MWOF undo over a time boundary (H.15.2.2 for Table 2 and H.15.2.4 for Table 3): If a subsequent MWOF Dispatch Instruction has an Instruction Effective Time which is between the Instruction Effective Time of another prior MWOF Dispatch Instruction and the Instruction Effective Time of that prior MWOF Dispatch Instruction’s corresponding PMWO Pseudo Dispatch Instruction that would nominally be created, and if the time the Target Instruction Level would be reached following the trajectory of either the prior or the subsequent MWOF Dispatch Instruction is in a different Imbalance Pricing Period or Imbalance Settlement Period, as applicable, to the Instruction Effective Time of the corresponding MWOF Dispatch Instruction, then a PMWO Pseudo Dispatch Instruction shall be created for each MWOF Dispatch Instruction considered in this scenario, with the Instruction Effective Time of the PMWO Pseudo Dispatch Instruction corresponding to the prior MWOF Dispatch Instruction being the same as the Instruction Effective Time of that prior MWOF Dispatch Instruction.

MOD_27_18 – Subset of Undo Scenarios MWOF and PMWO – Intention of rules FPN time MW

MOD_27_18 – Subset of Undo Scenarios MWOF and PMWO – Intention of rules FPN MWOF 1 time MW

MOD_27_18 – Subset of Undo Scenarios MWOF and PMWO – Intention of rules FPN MWOF 1 time MW MWOF 2

MOD_27_18 – Subset of Undo Scenarios MWOF and PMWO – Intention of rules FPN MWOF 1 time MW PMWO MWOF 2

MOD_27_18 – Subset of Undo Scenarios MWOF and PMWO – Happening in systems and modification FPN MWOF 1 time MW

MOD_27_18 – Subset of Undo Scenarios MWOF and PMWO – Happening in systems and modification FPN MWOF 1 time MW PMWO 1 MWOF 2

MOD_27_18 – Subset of Undo Scenarios MWOF and PMWO – Happening in systems and modification FPN MWOF 1 time MW PMWO 1 MWOF 2

MOD_27_18 – Subset of Undo Scenarios MWOF and PMWO – Happening in systems and modification FPN MWOF 1 time MW PMWO 1 MWOF 2 PMWO 2 Time of PMWO 2 correctly follows rules

MOD_27_18 – Subset of Undo Scenarios Scenario 2 – SYNC with DESY after reach MSG but before reach Min On Time (H.15.2.3 for Table 3): If a subsequent DESY Dispatch Instruction has an Instruction Effective Time which is between the Instruction Effective Time of a prior SYNC Dispatch Instruction and the time when the Physical Notification Instruction Profile for the SYNC Dispatch Instruction reaches the Generator Unit’s Registered Minimum Stable Generation, then the Dispatch Instruction having the preceding SYNC Instruction Code shall be ignored.

MOD_27_18 – Subset of Undo Scenarios SYNC and DESY after MSG before Min On Time – Intention of Rules FPN time MW

MOD_27_18 – Subset of Undo Scenarios SYNC and DESY after MSG before Min On Time – Intention of Rules FPN time MW SYNC Effective Min On Time Issue

MOD_27_18 – Subset of Undo Scenarios SYNC and DESY after MSG before Min On Time – Intention of Rules FPN time MW DESY SYNC Effective Min On Time Issue

MOD_27_18 – Subset of Undo Scenarios SYNC and DESY after MSG before Min On Time – Intention of Rules FPN time MW DESY SYNC Effective Min On Time Issue PDES Min Off Time

MOD_27_18 – Subset of Undo Scenarios SYNC and DESY after MSG before Min On Time – Happening in systems and modification FPN time MW SYNC Effective Min On Time Issue

MOD_27_18 – Subset of Undo Scenarios SYNC and DESY after MSG before Min On Time – Happening in systems and modification FPN time MW SYNC Effective Min On Time Issue PSYN

MOD_27_18 – Subset of Undo Scenarios SYNC and DESY after MSG before Min On Time – Happening in systems and modification FPN time MW DESY SYNC Effective Min On Time Issue PSYN

MOD_27_18 – Subset of Undo Scenarios SYNC and DESY after MSG before Min On Time – Happening in systems and modification FPN time MW DESY SYNC Effective Min On Time Issue PSYN PDES Min Off Time

MOD_27_18 – Subset of Undo Scenarios Scenario 3 – DESY with SYNC after reach zero before Min Off Time (H.15.2.5 for Table 3): If a subsequent SYNC Dispatch Instruction has an Instruction Effective Time which is between the Instruction Effective Time of a prior DESY Dispatch Instruction and the Instruction Effective Time for the corresponding PDES Pseudo Dispatch Instruction that would nominally be created, but after the time when the Physical Notification Instruction Profile for the DESY Dispatch Instruction reaches zero, then the PDES Pseudo Dispatch Instruction that would nominally be created for the corresponding DESY Dispatch Instruction shall be created.

MOD_27_18 – Subset of Undo Scenarios DESY and SYNC after zero before Min Off Time – Intention of Rules FPN time MW DESY Min Off Time

MOD_27_18 – Subset of Undo Scenarios DESY and SYNC after zero before Min Off Time – Intention of Rules FPN time MW DESY SYNC Effective Min On Time Issue Min Off Time

MOD_27_18 – Subset of Undo Scenarios DESY and SYNC after zero before Min Off Time – Intention of Rules FPN time MW DESY SYNC Effective Issue PSYN Min Off Time Min On Time

MOD_27_18 – Subset of Undo Scenarios DESY and SYNC after zero before Min Off Time – Happening in systems and modification FPN time MW DESY Min Off Time

MOD_27_18 – Subset of Undo Scenarios DESY and SYNC after zero before Min Off Time – Happening in systems and modification FPN time MW DESY PDES Min Off Time

MOD_27_18 – Subset of Undo Scenarios DESY and SYNC after zero before Min Off Time – Happening in systems and modification FPN time MW DESY SYNC Effective Issue PDES Min Off Time Min On Time

MOD_27_18 – Subset of Undo Scenarios DESY and SYNC after zero before Min Off Time – Happening in systems and modification FPN time MW DESY SYNC Effective Issue PSYN PDES Min Off Time Min On Time

Scenario 4 – SYNC with DESY before reach MSG (H.15.2.6 for Table 5): MOD_27_18 – Subset of Undo Scenarios Scenario 4 – SYNC with DESY before reach MSG (H.15.2.6 for Table 5): If a subsequent DESY Dispatch Instruction has an Instruction Effective Time which is between the Instruction Effective Time of a prior SYNC Dispatch Instruction and the time when the Physical Notification Instruction Profile for the SYNC Dispatch Instruction reaches the Generator Unit’s Registered Minimum Stable Generation, then the Dispatch Instruction having the preceding SYNC Instruction Code shall be ignored.

MOD_27_18 – Subset of Undo Scenarios SYNC and DESY before MSG – Intention of Rules time MW SYNC Effective Min On Time Issue FPN

MOD_27_18 – Subset of Undo Scenarios SYNC and DESY before MSG – Intention of Rules FPN time MW DESY SYNC Effective Min On Time Issue

MOD_27_18 – Subset of Undo Scenarios SYNC and DESY before MSG – Intention of Rules FPN time MW DESY SYNC Effective Min On Time Issue PDES Min Off Time

MOD_27_18 – Subset of Undo Scenarios SYNC and DESY before MSG – Happening in systems and modification FPN time MW SYNC Effective Min On Time Issue DESY PDES Min Off Time

MOD_27_18 – Subset of Undo Scenarios SYNC and DESY before MSG – Happening in systems and modification FPN time MW DESY PDES Min Off Time

Proposed approach high level: MOD_27_18 – Subset of Undo Scenarios Proposed approach high level: There are a number of scenarios, the occurrence of which would be expected to be relatively rare, which have been observed as part of certification that the outcome in systems is different to that in rules; In order to move towards substantive compliance under certification, for a period of time until these defects have been remedied and can be deployed to the live system, interim provisions which outline the outcome in the scenarios affected will prevail.